RE: Hmm25 May 2022 03:52
Evening,
Bottom line is that I am still holding in here and remain bullish that, they will deliver, and a discovery will be confirmed. We need this resource online for sure asap. However, if I’m totally honest, I can’t help but feel bloody disappointed by the recent operational update.
Firstly, back at the AGM presentation mid March David had confirmed that they had been doing all these surveys and I don’t know about anyone else but, I got a real impression from David that they had mapped out practically the entire basin, had carried out the ERT and the 2D seismic surveys and had identified multiple possible targets. Now don’t get me wrong it was a bit technically over my head regarding the surveying techniques used but this was the impression I got.
Secondly, he referred that they had identified a potential partner, were flying out to check out a rig, transportation of said rig wouldn’t be an issue as it could be broken down and shipped in parts. I also got the impression that shallow and deep drilling could be a possibility.
At the time I was a bit irritated as I remember thinking, jeeze, they are flying out only now to see this rig, why wasn’t this done before whilst the surveys were being finished?. However, David was saying he was going to be updating us on the when, where and who with shortly and that was what I was waiting for.
So, to now get this update three months later which in effect is saying, we still haven’t sorted, and finalised partner terms and drilling is likely now say mid September start of October as I say is disappointing. Its like nothing has happened for three months. David needs to and can do better than this.
I will see how events unfold. He still has my confidence for now but no more delays. Back in the draw for another four months until any drilling action starts. Annoying that more waiting as wait does is required….
GLA