The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmur Minerals Regulatory News (AMC)

  • This share is currently suspended. It was suspended at a price of 0.09

Share Price Information for Amur Minerals (AMC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.09
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.09
AMC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Chorney Ispelene Exploration Results

14 Mar 2012 07:00

RNS Number : 2873Z
Amur Minerals Corporation
14 March 2012
 



 

 

 

14 March 2012

AIM: AMC

 

 

AMUR MINERALS CORPORATION

("Amur" or the "Company")

 

Chorney Ispelene Exploration Results

 

Highlights:

 

·; Longest exploration target defined to date

·; High grades of nickel (0.9%) and copper (0.4%) contained in rock chip samples

·; Soil geochemical sampling results are among the highest obtained to date.

·; Trenching and drilling is planned for 2012.

 

Amur Minerals Corporation, a nickel-copper sulphide mineral exploration and resource development company focused on the far east of Russia, announces its 2011 exploration results for the Chorney Ispelene area of its Kun-Manie project. This is the first of a series of exploration related announcements based on the final results generated during the Company's 2011 exploration programme.

 

The Chorney Ispelene area is located at the western end of the Krumkon trend to the north and west of the Maly Krumkon deposit. Geological mapping, rock chip and soil geochem sampling, as well as geophysical work has identified that the structure is approximately six kilometres long, making it the longest continuous potential nickel and copper host structure defined by the Company to date. The structure is composed of olivine and pyroxeniteswhich host nickel and copper mineralisation.

 

Additional exploration of Chorney Ispelene will be conducted during the upcoming 2012 field season. Limited trenching and geological / structural drilling will be undertaken to develop a better understanding of the stratigraphy and orientation of the target. Mineralised samples collected from the structure indicate the presence of nickel of up to 0.9% nickel and 0.4% copper.

 

 

Robin Young, CEO of Amur Minerals, commented:

 

"It is with pleasure that we are now able to begin the release of our final verified exploration results from the 2011 field season. Chorney Ispelene (Black Giant) lives up to its name. The sampling results are among the best we have obtained during the years of work on the exploration licence. As a result, the Company will undertake limited trenching and wild cat drilling in the area in order to develop a better understanding of the target and its potential."

 

Please click on the link below to view the related maps for this announcement: -

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_1-2012-3-13.pdf

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_2-2012-3-13.pdf

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_3-2012-3-13.pdf

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_4-2012-3-13.pdf

 

Enquiries:

 

Company

Amur Minerals Corp.

Nomad and Joint Broker

RBC Capital Markets

Joint Broker

Merchant Securities

Public Relations

Tavistock Communications

Robin Young CEO

Martin Eales/Daniel Conti

Lindsay Mair

Lydia Eades/ Ed Portman/ Paul Youens

+44 (0) 7981 126 818

+44 (0) 20 7653 4000

+44 (0) 20 7382 0924

+44 (0) 20 7920 3150

 

 

Notes to Editors

 

Chorny Ispelene

Technical Description

 

Chorney Ispelene is located at the western end of Kun-Manie district. It is a continuous pyroxenite dyke containing nickel and copper sulphide mineralisation. Being difficult to access, the intrusive body has been examined by geological reconnaissance and widely spaced rock chip sampling collected from limited outcrops. The eastern portion of the dyke has been examined in greater detail with soil geochemical sampling grid spaced on 25 metre centres. Results indicate the presence of an intense secondary aureole of nickel and copper.

 

The dyke has been traced for 6.5km along strike with identified thicknesses ranging from 50 to 150 metres. It is projected to dip to the northeast at 40 to 45°.

 

The eastern portion of the structure is hosted within metagabbros while the western area is metamorphic in composition. The dyke is both subconcordant in relation to the dip and strike of the host rock.

 

The structure is cut by transverse vertical faults that result in the structure being divided into blocks of several hundred metres in length. The structure can be observed to form benches and cliffs. The dyke thins in the eastward direction.

 

Petrographically, the dyke is homogeneous, medium to fine grained in texture. The primary tock type ranges from olivine to pyroxenites in composition The sulphide mineralisation is associated with hanging wall and footwall contacts of the structure. Sulphides occur in a disseminated, fine grained texture and typically range from 1.0 to 1.5mm is size. Sulphides range from 5 to10% of the total rock mass and include pyrrhotite, chalcopyrite, pentlandite and bravoite grains.

 

Nickel grades in rock chip samples vary from 0.1-0.2% to 0.8-0.9% while copper grades range from 0.3-0.4%. The better mineralisation is observed in the central and eastern parts of the structure.

 

A magnetic geophysical survey indicates the dyke is linear and approximately 5,000m in length. Widely space Induced Polarization (IP) surveys have also been completed and confirm the presence of the Chorney Ispelene structure.

 

During 2012 the Company plans to excavate a trench across the structure within the area of the highest nickel concentration in the secondary dispersion aureole. Two inclined drill holes up to a depth of 250m are planned in the same area to establish the orientation and potential for the structure to host economic levels of nickel and copper mineralisation.

 

Maps of the area and exploration results are available on the Company's website at http://www.amurminerals.com.

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Robin Young. Mr. Young is a Geological Engineer (cum laude) and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFIDVTIVLIF
Date   Source Headline
18th Nov 20137:00 amRNSAGM Statement and Activities Report
29th Oct 20137:00 amRNSNotice of AGM
11th Oct 20137:00 amRNSKubuk 2013 Drilling Completed
9th Oct 20137:00 amRNSRecent Television Broadcast
30th Sep 20137:00 amRNSHalf Yearly Report
12th Sep 20137:00 amRNSMining Licence Update
23rd Aug 20134:40 pmRNSSecond Price Monitoring Extn
23rd Aug 20134:35 pmRNSPrice Monitoring Extension
12th Aug 20137:00 amRNSKubuk Drilling Update
30th Jul 20137:00 amRNSUpdated JORC Mineral Resource
23rd Jul 20137:00 amRNSSubscription to raise £5.2m, Equity Swap & Update
17th Jul 20134:35 pmRNSPrice Monitoring Extension
16th Jul 20134:35 pmRNSPrice Monitoring Extension
8th Jul 20137:00 amRNSAnti Monopoly Board Approval Received
3rd Jul 20137:00 amRNSEarly Positive Kubuk Results Doubles 2013 Drill Pl
1st Jul 20137:00 amRNSChange of Adviser
28th Jun 20138:04 amRNSResults for the Year Ended 31 December 2012
12th Jun 20137:00 amRNSPreliminary Drill Report from Kubuk
24th May 20137:00 amRNSKun-Manie Mining Licence Update
2nd May 20134:35 pmRNSPrice Monitoring Extension
30th Apr 20134:35 pmRNSPrice Monitoring Extension
23rd Apr 20137:00 amRNSGrant of Options and Directors Dealing
19th Apr 20137:00 amRNSOperational Update - Kun-Manie Drill Programme
9th Apr 20137:00 amRNSProfits Tax Reduction
22nd Mar 20138:40 amRNSMining Licence Update
20th Mar 20131:16 pmRNSStatement in relation to Cypriot subsidiary
20th Mar 20137:00 amRNSFar East Development Programme Update
18th Mar 20139:27 amRNSAdviser Change of Name
8th Mar 201312:44 pmRNSDrilling Identifies New Zone at Ikenskoe
6th Mar 20137:00 amRNSCompletion of Winter Ice Road
25th Feb 20137:00 amRNSInclusion of Kun-Manie in Far East Dev. Programme
18th Feb 20137:32 amRNS2012 Gorny Drilling Results (Replacement)
14th Feb 20137:30 amRNS2012 Gorny Drilling Results
4th Feb 20137:00 amRNS2012 Sampling - Kubuk Expands 50% and New Targets
20th Dec 20127:00 amRNSMining Licence Application Update
17th Dec 20127:00 amRNS2012 Drilling Doubles Length of Maly Kurumkon
19th Nov 20124:40 pmRNSSecond Price Monitoring Extn
19th Nov 20124:35 pmRNSPrice Monitoring Extension
14th Nov 20127:00 amRNSDrilling Results for 2012 Field Season
14th Nov 20127:00 amRNSKun-Manie Exploration Licence Extension Granted
12th Nov 20124:40 pmRNSSecond Price Monitoring Extn
12th Nov 20124:35 pmRNSPrice Monitoring Extension
9th Nov 20129:00 amRNSResult of AGM
19th Oct 20127:00 amRNSNotice of AGM
28th Sep 20127:00 amRNSHalf Yearly Report
21st Sep 20124:40 pmRNSSecond Price Monitoring Extn
21st Sep 20124:35 pmRNSPrice Monitoring Extension
3rd Sep 20127:00 amRNSDrilling At Maly Kurumkon Expands Deposit
6th Aug 20127:00 amRNSKubuk Confirms Substantial Mineralisation
12th Jul 20127:00 amRNSDrilling Underway on Maly Kurumkon Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.