Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmur Minerals Regulatory News (AMC)

  • This share is currently suspended. It was suspended at a price of 0.09

Share Price Information for Amur Minerals (AMC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.09
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.09
AMC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling At Maly Kurumkon Expands Deposit

3 Sep 2012 07:00

RNS Number : 2105L
Amur Minerals Corporation
03 September 2012
 



 

 

 

3 September 2012

 

AMUR MINERALS CORPORATION

(AIM : AMC)

 

Drilling At Maly Kurumkon Expands Deposit

 

Amur Minerals Corporation ("Amur" or the "Company") is pleased to announce highly positive results from the first stage of its 2012 drill programme at the Kun-Manie nickel-copper sulphide project located in far east Russia. Analytical results have been received for four holes drilled at the eastern limits of the Maly Kurumkon target area. The holes are located approximately 100 metres to the east of existing drill holes within the Maly Kurumkon open pit plan. This area is also immediately adjacent to the Flangovy target, which is projected to have a strike length approaching an additional 1,000 metres. On going drilling is presently being undertaken within the Flangovy area to determine if the mineralisation continues to the east. The results indicate the following:

 

·; Three of the four holes intersected economic grades of nickel and copper mineralisation within the pyroxenite host rock that outcrops on the surface and is interpreted to extend up to 300 metres down dip. The nickel and copper mineralisation is concentrated at the hanging and footwall contacts of the zone.

 

·; The average nickel and copper grades are 0.77% and 0.24%, respectively using a 0.20% nickel cutoff grade. These grades are 35% higher for nickel and 50% higher for copper than that which was intersected in the existing drill holes located 100 metres to the west. Furthermore, the average thickness intersected in the newly drilled section is approximately 19 metres in true thickness; nearly 20% greater than existing holes to the west.

 

·; Substantial thicknesses of +1.0% nickel have been intersected within the new drill holes. The high grade intercept thickness is 2.9 metres and contains 1.24% nickel with 0.36% copper.

 

These results confirm the geological interpretation that the mineralisation could continue from the Maly Kurumkon deposit toward the Flangovy target to the east. The Flangovy target is interpreted to be an extension of the Maly Kurumkon deposit. Successful drilling at Flangovy could result in a total mineralised length of nearly two kilometres. This could significantly increase the resource base of the project.

 

A portion of the newly drilled mineralisation lies within the already planned Maly Kurumkon pit within rock that previously had been categorised as waste due to a lack of information. The inclusion of this new drill data to update resource and open pit reserve modeling of Maly Kurumkon will be undertaken when results of current drilling are available from the adjacent Flangovy target. The newly discovered higher grades of ore are of a level which indicates underground mining may prove economic. As a result, the Company may need to consider deeper drill programmes in the areas below and adjacent to potential open pit operations to confirm the potential for underground operations.

 

The results of the mineralised intervals are provided in the following table. A location map of the drill holes completed at Maly Kurumkon and the planned Flangovy drill hole locations as well as two drill sections illustrating the current results are included as a part of this announcement and can be viewed on the Company's website www.amurminerals.com.

 

http://www.rns-pdf.londonstockexchange.com/rns/2105L_-2012-8-31.pdf
 

http://www.rns-pdf.londonstockexchange.com/rns/2105L_1-2012-8-31.pdf
 

 

Maly Kurumkon Exploration Drill Intercepts

 

Drill

Hole

Intersection Data

0.20 Ni Cut Off Grade (COG)

Intersection Data

1.00% Ni COG

From

(m)

To

(m)

Length

(m)

Nickel

(%)

Copper

(%)

Length

(m)

Nickel

(%)

Copper

(%)

C197

15.1

21.2

6.1

0.46

0.14

C197

40.1

46.8

6.7

1.07

0.48

3.1

1.38

0.55

C197

50.0

62.6

12.6

0.73

0.26

3.5

1.00

0.34

C198

57.8

68.8

11.0

0.68

0.20

4.7

1.30

0.37

C198

76.0

84.5

8.5

0.84

0.20

1.7

1.80

0.42

C199

99.9

105.1

5.2

0.95

0.22

2.7

1.07

0.24

C199

116.3

123.7

7.4

0.78

0.19

1.5

1.01

0.16

Average

8.2

0.77

0.24

2.87

1.24

0.36

\* The reported average nickel and copper grades are not precise due to rounding.

 

In addition and of potential significance, further examination of available exploration data and additional surface results to the west of the Maly Kurumkon pit target indicates that the deposit may also extend to the west for an additional 500 metres providing an even larger potential source of mineralisation. This West Maly Kurumkon area requires additional drilling in the future.

 

Robin Young, CEO of Amur Minerals, commented:

 

"We are extremely pleased to announce these first drill results from our 2012 drill season. These substantially higher intersected grades at Maly Kurumkon provide us with further potential to increase the resource base in both tonnage and grade. This, along with the introduction of higher grade material earlier in the operation's life of the mine could improve the mine production plan enhancing the overall economics of the project."

 

Enquiries:

 

Company

Amur Minerals Corp.

Nomad and Joint Broker

RBC Capital Markets

Joint Broker

Merchant Securities

Public Relations

Tavistock Communications

Robin Young CEO

Martin Eales

Lindsay Mair

Jos Simson / Jessica Fontaine

+44 (0) 79 8112 6818

+44 (0) 20 7653 4000

+44 (0) 20 7628 2200

+44 (0) 20 7920 3150

 

Notes to Editor

 

Attached and available for view on www.amurminerals.com, is a plan map of the Maly Kurumkon / Flangovy area and two drill sections of the results derived at Maly Kurumkon.

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Robin Young. Mr. Young is a Geological Engineer (cum laude) and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges.

 

The analysis of the drill samples was conducted by ALS Global (www.alsglobal.com/company.aspx ) located in Moscow, Russia.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAEPFDFAAEFF
Date   Source Headline
30th Apr 20241:34 pmRNSAIM Rule 17 Schedule Two (g) update
4th Mar 20247:00 amRNSCompany Update
30th Nov 202311:41 amRNSAnnual General Meeting Results
13th Nov 20237:00 amRNSNotice of Annual General Meeting
25th Sep 20237:00 amRNSInterim Results 2023
7th Sep 20237:30 amRNSSuspension - Amur Minerals Corporation
7th Sep 20237:00 amRNSSuspension of trading on AIM
15th Aug 20239:30 amRNSCash shell update
8th Aug 20237:48 amRNSDiscussions with Amur Minerals Corporation
8th Aug 20237:00 amRNSCessation of discussions with Ascent Resources plc
30th Jun 20233:05 pmRNSAUDITED FINAL RESULTS
2nd Jun 20237:00 amRNSStatement regarding possible offer
1st Jun 20231:05 pmRNSIntention to bid for Amur Minerals Corporation
25th May 20236:00 pmRNSAmur Minerals
24th May 20234:28 pmRNSDividend Declaration
14th Mar 20231:00 pmRNSReceipt of Funds
6th Mar 20239:34 amRNSCompletion of disposal of Kun-Manie for US$35M
5th Dec 202210:43 amRNSAnnual General Meeting Results
2nd Dec 20224:41 pmRNSSecond Price Monitoring Extn
2nd Dec 20224:36 pmRNSPrice Monitoring Extension
1st Dec 20224:40 pmRNSSecond Price Monitoring Extn
1st Dec 20224:36 pmRNSPrice Monitoring Extension
10th Nov 20227:00 amRNSNotice of Annual General Meeting
7th Nov 20221:37 pmRNSTransaction Update
3rd Oct 202212:35 pmRNSTransaction Approvals Update
9th Sep 20227:00 amRNSInterim Results 2022
24th Aug 202210:26 amRNSResult of General Meeting
8th Aug 20227:00 amRNSPosting of Circular and Notice of General Meeting
5th Aug 202211:17 amRNSProposed disposal of the Kun-Manie Project
30th Jun 20227:00 amRNSAUDITED FINAL RESULTS YEAR ENDED 31 DECEMBER 2021
9th Jun 20224:40 pmRNSSecond Price Monitoring Extn
9th Jun 20224:35 pmRNSPrice Monitoring Extension
7th Jun 20227:00 amRNSKun-Manie Nickel – Copper Sulphide TEO Results
25th May 202212:03 pmRNSResult of General Meeting
10th May 20227:00 amRNSPosting of Circular and Notice of General Meeting
9th May 20227:00 amRNSProposed sale of the Kun-Manie Project
13th Apr 20227:00 amRNSRussian Sanctions Update
4th Mar 20224:41 pmRNSSecond Price Monitoring Extn
4th Mar 20224:37 pmRNSPrice Monitoring Extension
23rd Feb 202212:33 pmRNSRussian Sanctions – No Impact
16th Feb 20224:40 pmRNSSecond Price Monitoring Extn
16th Feb 20224:35 pmRNSPrice Monitoring Extension
11th Feb 20227:00 amRNSExercise of Warrants and Issue of Equity
3rd Feb 202212:20 pmRNSExercise of Warrants and Issue of Equity
28th Jan 202210:54 amRNSExercise of Warrants and Issue of Equity
25th Jan 202211:21 amRNSPress Speculation & Share Price Movement
29th Dec 20214:41 pmRNSSecond Price Monitoring Extn
29th Dec 20214:36 pmRNSPrice Monitoring Extension
6th Dec 20211:44 pmRNSAnnual General Meeting Results
24th Nov 20217:00 amRNSShareholder Q&A

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.