The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmur Minerals Regulatory News (AMC)

  • This share is currently suspended. It was suspended at a price of 0.09

Share Price Information for Amur Minerals (AMC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.09
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.09
AMC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Chorney Ispelene Exploration Results

14 Mar 2012 07:00

RNS Number : 2873Z
Amur Minerals Corporation
14 March 2012
 



 

 

 

14 March 2012

AIM: AMC

 

 

AMUR MINERALS CORPORATION

("Amur" or the "Company")

 

Chorney Ispelene Exploration Results

 

Highlights:

 

·; Longest exploration target defined to date

·; High grades of nickel (0.9%) and copper (0.4%) contained in rock chip samples

·; Soil geochemical sampling results are among the highest obtained to date.

·; Trenching and drilling is planned for 2012.

 

Amur Minerals Corporation, a nickel-copper sulphide mineral exploration and resource development company focused on the far east of Russia, announces its 2011 exploration results for the Chorney Ispelene area of its Kun-Manie project. This is the first of a series of exploration related announcements based on the final results generated during the Company's 2011 exploration programme.

 

The Chorney Ispelene area is located at the western end of the Krumkon trend to the north and west of the Maly Krumkon deposit. Geological mapping, rock chip and soil geochem sampling, as well as geophysical work has identified that the structure is approximately six kilometres long, making it the longest continuous potential nickel and copper host structure defined by the Company to date. The structure is composed of olivine and pyroxeniteswhich host nickel and copper mineralisation.

 

Additional exploration of Chorney Ispelene will be conducted during the upcoming 2012 field season. Limited trenching and geological / structural drilling will be undertaken to develop a better understanding of the stratigraphy and orientation of the target. Mineralised samples collected from the structure indicate the presence of nickel of up to 0.9% nickel and 0.4% copper.

 

 

Robin Young, CEO of Amur Minerals, commented:

 

"It is with pleasure that we are now able to begin the release of our final verified exploration results from the 2011 field season. Chorney Ispelene (Black Giant) lives up to its name. The sampling results are among the best we have obtained during the years of work on the exploration licence. As a result, the Company will undertake limited trenching and wild cat drilling in the area in order to develop a better understanding of the target and its potential."

 

Please click on the link below to view the related maps for this announcement: -

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_1-2012-3-13.pdf

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_2-2012-3-13.pdf

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_3-2012-3-13.pdf

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_4-2012-3-13.pdf

 

Enquiries:

 

Company

Amur Minerals Corp.

Nomad and Joint Broker

RBC Capital Markets

Joint Broker

Merchant Securities

Public Relations

Tavistock Communications

Robin Young CEO

Martin Eales/Daniel Conti

Lindsay Mair

Lydia Eades/ Ed Portman/ Paul Youens

+44 (0) 7981 126 818

+44 (0) 20 7653 4000

+44 (0) 20 7382 0924

+44 (0) 20 7920 3150

 

 

Notes to Editors

 

Chorny Ispelene

Technical Description

 

Chorney Ispelene is located at the western end of Kun-Manie district. It is a continuous pyroxenite dyke containing nickel and copper sulphide mineralisation. Being difficult to access, the intrusive body has been examined by geological reconnaissance and widely spaced rock chip sampling collected from limited outcrops. The eastern portion of the dyke has been examined in greater detail with soil geochemical sampling grid spaced on 25 metre centres. Results indicate the presence of an intense secondary aureole of nickel and copper.

 

The dyke has been traced for 6.5km along strike with identified thicknesses ranging from 50 to 150 metres. It is projected to dip to the northeast at 40 to 45°.

 

The eastern portion of the structure is hosted within metagabbros while the western area is metamorphic in composition. The dyke is both subconcordant in relation to the dip and strike of the host rock.

 

The structure is cut by transverse vertical faults that result in the structure being divided into blocks of several hundred metres in length. The structure can be observed to form benches and cliffs. The dyke thins in the eastward direction.

 

Petrographically, the dyke is homogeneous, medium to fine grained in texture. The primary tock type ranges from olivine to pyroxenites in composition The sulphide mineralisation is associated with hanging wall and footwall contacts of the structure. Sulphides occur in a disseminated, fine grained texture and typically range from 1.0 to 1.5mm is size. Sulphides range from 5 to10% of the total rock mass and include pyrrhotite, chalcopyrite, pentlandite and bravoite grains.

 

Nickel grades in rock chip samples vary from 0.1-0.2% to 0.8-0.9% while copper grades range from 0.3-0.4%. The better mineralisation is observed in the central and eastern parts of the structure.

 

A magnetic geophysical survey indicates the dyke is linear and approximately 5,000m in length. Widely space Induced Polarization (IP) surveys have also been completed and confirm the presence of the Chorney Ispelene structure.

 

During 2012 the Company plans to excavate a trench across the structure within the area of the highest nickel concentration in the secondary dispersion aureole. Two inclined drill holes up to a depth of 250m are planned in the same area to establish the orientation and potential for the structure to host economic levels of nickel and copper mineralisation.

 

Maps of the area and exploration results are available on the Company's website at http://www.amurminerals.com.

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Robin Young. Mr. Young is a Geological Engineer (cum laude) and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFIDVTIVLIF
Date   Source Headline
10th Apr 20177:00 amRNS2017 Ice Road Resupply Completed
13th Mar 20177:00 amRNSCompletion of Ice Road
7th Mar 20177:00 amRNS2017 Kun-Manie Field Programme
10th Feb 20177:00 amRNSKun-Manie Resource Update
9th Feb 20174:35 pmRNSPrice Monitoring Extension
6th Feb 20177:00 amRNSAppointment of Vox Markets
30th Jan 20177:29 amRNSIssue of Equity
20th Jan 20174:41 pmRNSSecond Price Monitoring Extn
20th Jan 20174:35 pmRNSPrice Monitoring Extension
17th Jan 201712:02 pmRNSPrice Monitoring Extension
12th Jan 20177:00 amRNSIssue of Equity
11th Jan 20177:00 amRNSGipronickel Institute MKF Metallurgical Results
9th Jan 201712:02 pmRNSPrice Monitoring Extension
6th Jan 20177:00 amRNSBoard Appointment
21st Dec 20167:00 amRNSMKF Mining Trade-Off Study Completed
14th Dec 20167:00 amRNSMKF Resource Update Initiated
8th Dec 20164:21 pmRNSIssue of Equity
23rd Nov 20169:13 amRNSHolding in Company
22nd Nov 20167:00 amRNSFinancial Advisory Agreement with FEIE
21st Nov 20169:12 amRNSHolding in Company
17th Nov 201610:31 amRNSHolding(s) in Company
16th Nov 20162:24 pmRNSComment re Recent Share Price Increase
14th Nov 20167:00 amRNSAccess Road Update
7th Nov 20164:40 pmRNSSecond Price Monitoring Extn
7th Nov 20164:35 pmRNSPrice Monitoring Extension
1st Nov 20164:35 pmRNSPrice Monitoring Extension
1st Nov 20167:00 amRNSCompletion of Successful 2016 Field Season
31st Oct 20167:00 amRNSMOU with Jinchuan
12th Oct 20164:35 pmRNSPrice Monitoring Extension
30th Sep 20167:01 amRNSInterim Results 2016
30th Sep 20167:00 amRNSDrilling Update
19th Sep 20167:00 amRNSDirectorate Change
13th Sep 201612:07 pmRNSSecond Price Monitoring Extn
13th Sep 201612:02 pmRNSPrice Monitoring Extension
9th Sep 20162:12 pmRNSResult of AGM
5th Sep 201612:07 pmRNSSecond Price Monitoring Extn
5th Sep 201612:02 pmRNSPrice Monitoring Extension
5th Sep 20167:00 amRNSLetter of Intent with IG Copper
30th Aug 20167:00 amRNSKun-Manie Metallurgical Update
24th Aug 20167:00 amRNSNotice of AGM
18th Aug 20167:00 amRNSDrilling Update
17th Aug 201612:07 pmRNSSecond Price Monitoring Extn
17th Aug 201612:02 pmRNSPrice Monitoring Extension
11th Aug 201612:07 pmRNSSecond Price Monitoring Extn
11th Aug 201612:02 pmRNSPrice Monitoring Extension
9th Aug 20164:40 pmRNSSecond Price Monitoring Extn
9th Aug 20164:35 pmRNSPrice Monitoring Extension
28th Jul 20168:56 amRNSHolding(s) in Company
27th Jul 201612:07 pmRNSSecond Price Monitoring Extn
27th Jul 201612:02 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.