The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmur Minerals Regulatory News (AMC)

  • This share is currently suspended. It was suspended at a price of 0.09

Share Price Information for Amur Minerals (AMC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.09
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.09
AMC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Chorney Ispelene Exploration Results

14 Mar 2012 07:00

RNS Number : 2873Z
Amur Minerals Corporation
14 March 2012
 



 

 

 

14 March 2012

AIM: AMC

 

 

AMUR MINERALS CORPORATION

("Amur" or the "Company")

 

Chorney Ispelene Exploration Results

 

Highlights:

 

·; Longest exploration target defined to date

·; High grades of nickel (0.9%) and copper (0.4%) contained in rock chip samples

·; Soil geochemical sampling results are among the highest obtained to date.

·; Trenching and drilling is planned for 2012.

 

Amur Minerals Corporation, a nickel-copper sulphide mineral exploration and resource development company focused on the far east of Russia, announces its 2011 exploration results for the Chorney Ispelene area of its Kun-Manie project. This is the first of a series of exploration related announcements based on the final results generated during the Company's 2011 exploration programme.

 

The Chorney Ispelene area is located at the western end of the Krumkon trend to the north and west of the Maly Krumkon deposit. Geological mapping, rock chip and soil geochem sampling, as well as geophysical work has identified that the structure is approximately six kilometres long, making it the longest continuous potential nickel and copper host structure defined by the Company to date. The structure is composed of olivine and pyroxeniteswhich host nickel and copper mineralisation.

 

Additional exploration of Chorney Ispelene will be conducted during the upcoming 2012 field season. Limited trenching and geological / structural drilling will be undertaken to develop a better understanding of the stratigraphy and orientation of the target. Mineralised samples collected from the structure indicate the presence of nickel of up to 0.9% nickel and 0.4% copper.

 

 

Robin Young, CEO of Amur Minerals, commented:

 

"It is with pleasure that we are now able to begin the release of our final verified exploration results from the 2011 field season. Chorney Ispelene (Black Giant) lives up to its name. The sampling results are among the best we have obtained during the years of work on the exploration licence. As a result, the Company will undertake limited trenching and wild cat drilling in the area in order to develop a better understanding of the target and its potential."

 

Please click on the link below to view the related maps for this announcement: -

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_1-2012-3-13.pdf

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_2-2012-3-13.pdf

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_3-2012-3-13.pdf

 

http://www.rns-pdf.londonstockexchange.com/rns/2873Z_4-2012-3-13.pdf

 

Enquiries:

 

Company

Amur Minerals Corp.

Nomad and Joint Broker

RBC Capital Markets

Joint Broker

Merchant Securities

Public Relations

Tavistock Communications

Robin Young CEO

Martin Eales/Daniel Conti

Lindsay Mair

Lydia Eades/ Ed Portman/ Paul Youens

+44 (0) 7981 126 818

+44 (0) 20 7653 4000

+44 (0) 20 7382 0924

+44 (0) 20 7920 3150

 

 

Notes to Editors

 

Chorny Ispelene

Technical Description

 

Chorney Ispelene is located at the western end of Kun-Manie district. It is a continuous pyroxenite dyke containing nickel and copper sulphide mineralisation. Being difficult to access, the intrusive body has been examined by geological reconnaissance and widely spaced rock chip sampling collected from limited outcrops. The eastern portion of the dyke has been examined in greater detail with soil geochemical sampling grid spaced on 25 metre centres. Results indicate the presence of an intense secondary aureole of nickel and copper.

 

The dyke has been traced for 6.5km along strike with identified thicknesses ranging from 50 to 150 metres. It is projected to dip to the northeast at 40 to 45°.

 

The eastern portion of the structure is hosted within metagabbros while the western area is metamorphic in composition. The dyke is both subconcordant in relation to the dip and strike of the host rock.

 

The structure is cut by transverse vertical faults that result in the structure being divided into blocks of several hundred metres in length. The structure can be observed to form benches and cliffs. The dyke thins in the eastward direction.

 

Petrographically, the dyke is homogeneous, medium to fine grained in texture. The primary tock type ranges from olivine to pyroxenites in composition The sulphide mineralisation is associated with hanging wall and footwall contacts of the structure. Sulphides occur in a disseminated, fine grained texture and typically range from 1.0 to 1.5mm is size. Sulphides range from 5 to10% of the total rock mass and include pyrrhotite, chalcopyrite, pentlandite and bravoite grains.

 

Nickel grades in rock chip samples vary from 0.1-0.2% to 0.8-0.9% while copper grades range from 0.3-0.4%. The better mineralisation is observed in the central and eastern parts of the structure.

 

A magnetic geophysical survey indicates the dyke is linear and approximately 5,000m in length. Widely space Induced Polarization (IP) surveys have also been completed and confirm the presence of the Chorney Ispelene structure.

 

During 2012 the Company plans to excavate a trench across the structure within the area of the highest nickel concentration in the secondary dispersion aureole. Two inclined drill holes up to a depth of 250m are planned in the same area to establish the orientation and potential for the structure to host economic levels of nickel and copper mineralisation.

 

Maps of the area and exploration results are available on the Company's website at http://www.amurminerals.com.

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Robin Young. Mr. Young is a Geological Engineer (cum laude) and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFIDVTIVLIF
Date   Source Headline
10th May 20247:00 amRNSAUDITED FINAL RESULTS
30th Apr 20241:34 pmRNSAIM Rule 17 Schedule Two (g) update
4th Mar 20247:00 amRNSCompany Update
30th Nov 202311:41 amRNSAnnual General Meeting Results
13th Nov 20237:00 amRNSNotice of Annual General Meeting
25th Sep 20237:00 amRNSInterim Results 2023
7th Sep 20237:30 amRNSSuspension - Amur Minerals Corporation
7th Sep 20237:00 amRNSSuspension of trading on AIM
15th Aug 20239:30 amRNSCash shell update
8th Aug 20237:48 amRNSDiscussions with Amur Minerals Corporation
8th Aug 20237:00 amRNSCessation of discussions with Ascent Resources plc
30th Jun 20233:05 pmRNSAUDITED FINAL RESULTS
2nd Jun 20237:00 amRNSStatement regarding possible offer
1st Jun 20231:05 pmRNSIntention to bid for Amur Minerals Corporation
25th May 20236:00 pmRNSAmur Minerals
24th May 20234:28 pmRNSDividend Declaration
14th Mar 20231:00 pmRNSReceipt of Funds
6th Mar 20239:34 amRNSCompletion of disposal of Kun-Manie for US$35M
5th Dec 202210:43 amRNSAnnual General Meeting Results
2nd Dec 20224:41 pmRNSSecond Price Monitoring Extn
2nd Dec 20224:36 pmRNSPrice Monitoring Extension
1st Dec 20224:40 pmRNSSecond Price Monitoring Extn
1st Dec 20224:36 pmRNSPrice Monitoring Extension
10th Nov 20227:00 amRNSNotice of Annual General Meeting
7th Nov 20221:37 pmRNSTransaction Update
3rd Oct 202212:35 pmRNSTransaction Approvals Update
9th Sep 20227:00 amRNSInterim Results 2022
24th Aug 202210:26 amRNSResult of General Meeting
8th Aug 20227:00 amRNSPosting of Circular and Notice of General Meeting
5th Aug 202211:17 amRNSProposed disposal of the Kun-Manie Project
30th Jun 20227:00 amRNSAUDITED FINAL RESULTS YEAR ENDED 31 DECEMBER 2021
9th Jun 20224:40 pmRNSSecond Price Monitoring Extn
9th Jun 20224:35 pmRNSPrice Monitoring Extension
7th Jun 20227:00 amRNSKun-Manie Nickel – Copper Sulphide TEO Results
25th May 202212:03 pmRNSResult of General Meeting
10th May 20227:00 amRNSPosting of Circular and Notice of General Meeting
9th May 20227:00 amRNSProposed sale of the Kun-Manie Project
13th Apr 20227:00 amRNSRussian Sanctions Update
4th Mar 20224:41 pmRNSSecond Price Monitoring Extn
4th Mar 20224:37 pmRNSPrice Monitoring Extension
23rd Feb 202212:33 pmRNSRussian Sanctions – No Impact
16th Feb 20224:40 pmRNSSecond Price Monitoring Extn
16th Feb 20224:35 pmRNSPrice Monitoring Extension
11th Feb 20227:00 amRNSExercise of Warrants and Issue of Equity
3rd Feb 202212:20 pmRNSExercise of Warrants and Issue of Equity
28th Jan 202210:54 amRNSExercise of Warrants and Issue of Equity
25th Jan 202211:21 amRNSPress Speculation & Share Price Movement
29th Dec 20214:41 pmRNSSecond Price Monitoring Extn
29th Dec 20214:36 pmRNSPrice Monitoring Extension
6th Dec 20211:44 pmRNSAnnual General Meeting Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.