Drilling Update

30 Sep 2016 07:00

RNS Number : 2669L
Amur Minerals Corporation
30 September 2016
 

 

30 September 2016

 

 

AMUR MINERALS CORPORATION

(AIM: AMC)

 

Maly Kurumkon / Flangovy 2016 Drill Summary

3,000 Metre Length of Indicated Resources Now Drill Defined

 

Amur Minerals Corporation ("Amur" or the "Company"), a far east Russian sulphide nickel copper explorer, is pleased to provide a summary update on the 2016 drill results for its Maly Kurumkon / Flangovy ("MKF") drill programme at Kun-Manie, located in the far east of Russia. This season's drilling is now essentially complete and all planned objectives have been accomplished. A maximum of three holes remain to be completed.

 

With the completion of 80 holes containing a total of 19,400.8 metres of drilling as of 24 September 2016, the Company has now drill confirmed the presence of continuous mineralisation along a 3,000 metre length of MKF. This represents an increase of nearly 50% from that known to be present at the start of this year's drill programme. Continuous open pit and underground economic grades (0.5% nickel cutoff grade) of mineralisation have now been proven to exist along the entire drilled length of the deposit.

 

All MKF drill identified mineralisation is now completed at a spacing used by SRK Consulting UK Ltd ("SRK") to define Indicated resources. This represents a substantial potential expansion in the Indicated resource which had been defined (May 2016) to be 1,400 metres in length. Having more than doubled the length of the Indicated resource, the Company anticipates that there is substantial potential to increase the reserve inventory at MKF for inclusion in the Definitive Feasibility Study ("DFS"). The grade of the mineralisation is suitable for both open pit (0.2% nickel cutoff grade) and underground (0.5% nickel cutoff grade) production.

 

Upside potential for resource expansion remains to the east of the last row of drill holes at MKF. Approximately 400 metres of undrilled potential remain to be tested. Beyond this geographically defined MKF limit is the Gorny target area. Limited shallow drilling at Gorny indicates the presence of mineralisation. Drilling of the MKF target and western area of Gorny is necessary. The Company believes that the Gorny deposit could be a continuation of the MKF deposit and successful future drilling could confirm these two deposits may actually be one larger deposit having a length of up to 5 kilometres.

 

Highlights:

 

· A record drill season with 19,400.5 metres of drilling having been completed through 24 September 2016 is now essentially complete. A total of 80 holes have been drilled within the MKF deposit and fall into one of two groups, resource definition and metallurgical sample collection.

 

· The intent of the resource definition phase of the programme was two-fold. This included infill drilling of the May 2016 defined Inferred resources to a spacing allowing for the Inferred resource being upgraded to that of Indicated and to identify new mineralisation through step out drilling. New mineral was also to be drilled at a spacing allowing for it to be classified as Indicated resource.

 

· A total of 59 (15,213.3 metres) resource definition holes were successfully completed. Using a 0.2% nickel cutoff grade (typical of open pit production criteria), the 2016 holes intersecting ore grade mineralisation indicated the average mineralised thickness per ore interval was 13.5 metres. The average cumulative thickness per hole was 23.6 metres. The average length weighted nickel grade is 0.76% with copper being 0.21%. These thicknesses and grades are suitable for open pit production.

 

· The previously identified high grade structure containing in excess of 0.5% nickel (typical of underground production criteria) has also been confirmed to exist along the entire 3,000 metre length of MKF. The 2016 drill results average 0.90% nickel and 0.25% copper. Average thicknesses of the high grade mineralisation by interval and per hole are 10.5 metres and 19.7 metres, respectively. The structure contains 85% of the total drill defined nickel, hence the primary target of reserve definition.

 

· As noted, the successful infill and step out phases of the programme have now expanded the MKF deposit to 3,000 metres in length with all mineralisation being drilled to the Indicated resource category spacing. Previously (May 2016), the Indicated resource of MKF was identified to be 1,400 metres in length. With the expansion of the deposit and its being comprehensively drilled at the spacing of Indicated, the Company anticipates a substantial upgrade in the next resource update. Once all information is available from Alex Steward Laboratories ("ASL"), a resource update of the MKF deposit is planned for Q1 2017.

 

· The configuration of the mineralisation at MKF is conducive to both open pit and underground mining. Where mineral is located at and near the surface, open pit production is the preferred mining method. As the stripping ratio increases in the open pit production environment, underground production becomes the preferred extraction method as the profit per underground produced ore tonne exceeds that of the open pit ore tonne. This requires a trade-off study to identify the portions of the mineralisation that are best mined by one of the two production alternatives.

 

· The final limits of the MKF deposit have not yet been defined. An additional 400 metre resource expansion target remains to be drilled at the eastern limits of the MKF area. The eastern limit of the drill target is an arbitrarily selected limit. Beyond this 400 metre exploration potential block, the Gorny deposit is present which contains limited drill information at the shallow near surface mineral outcrops. Drilling within the remaining MKF target and at Gorny is necessary which could result in confirmation that Gorny may be an extension of the MKF deposit resulting in a single deposit having a total length of nearly 5 kilometres in length.

 

· The remaining 21 holes (4,187.5 metres) completed at MKF have allowed the Company to generate a 7.5 tonne bulk metallurgical sample for use flowsheet determination and process plant design. The bulk metallurgical sample has been transported to our Khabarovsk core storage facility for future metallurgical treatment.

 

· ASL has now delivered analytical results for 63% of the drill samples. It is anticipated that the final ASL results will be available in 6 to 8 weeks.

 

Robin Young, CEO of Amur Minerals, commented:

 

"We are pleased to report that we are at the end of this year's drill programme and our field team has completed an outstanding job. With the early start and availability of sufficient fuel stocks, we have drilled nearly 4,400 metres more than the planned 15,000 metres and generated a 7.5 tonne bulk sample which is 50% larger than anticipated.

 

"Drilling has expanded the Maly Kurumkon / Flangovy deposit by nearly 50% to a total length of 3,000 metres. We have also drilled the entire structure at a spacing which should allow us to report a substantial increase in the Indicated resource which was previously identified to be only 1,400 metres in length. We now have the luxury of being able to include the entire deposit in the identification of reserves. This could have a substantial and highly positive impact on the Definitive Feasibility Study results.

 

"As we move into our planning cycle for next year's field programme, we will be considering where our prime drill targets and objectives will be for next year. Previously, the priority target was Kubuk, but with the identification that MKF and Gorny could be that same mineralised structure, we will be reviewing our drill priority list in the very near future."

 

Company

Amur Minerals Corp.

Nomad and Broker

S.P. Angel Corporate Finance LLP

Public Relations

Yellow Jersey

Robin Young CEO

Ewan Leggat

Laura Harrison

Dominic Barretto

Harriet Jackson

+74212755615

+44(0)2034700470

+44(0)754 427 5882

 

For additional information, visit the Company's website, www.amurminerals.com.

 

Please follow the link at the end of this RNS to view figures showing MKF drill hole location map.

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

Notes to Editors

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Mr. Robin Young. Mr. Young is a Geological Engineer (cum laude), a Professional Geologist licensed by the Utah Division of Occupational and Professional Licensing, and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges. An employee of Amur for 12 years, previously Mr. Young was employed as an exploration and mine geologist, mining engineer, construction manager of a mine startup as well as independent consultant with Fluor Engineers, Fluor Australia and Western Services Engineering, Inc. during which time his responsibilities included the independent compilation of resources and reserves in accordance with JORC standards. In addition, he has been the lead engineer and project manager in the compilation of numerous studies and projects requiring the compilation of independent Bankable Studies utilised to finance small to large scale projects worldwide. Mr. Young is responsible for the content of this announcement which includes information derived by SRK Consulting Ltd and Alex Stewart Laboratories.

 

For further information, see the Company website at www.amurminerals.com.

 

 

Key Information

Resource Distribution

 

May 2016 Global Resource Statement

Zero Cutoff Grade

 

Resource

Class

Tonnage

Ni

Ni

Cu

Cu

Pt

Pt

Pd

Pd

Mt

%

t

%

t

g/t

kg

g/t

kg

Maly Kurumkon / Flangovy

Measured

-

-

-

-

-

-

-

-

-

Indicated

68.4

0.42

285,200

0.12

84,200

0.10

6,600

0.10

6,900

Sub-total

68.4

0.42

285,200

0.12

84,200

0.10

6,600

0.10

6,900

Inferred

22.2

0.37

81,400

0.12

25,70

0.09

1,900

0.09

2,000

Total

90.6

0.40

366,600

0.12

109,900

0.09

8,500

0.10

8,900

Ikenskoe / Sobolevsky

Measured

17.5

0.50

88,600

0.14

24,200

0.18

3,200

0.20

3,500

Indicated

11.8

0.39

46,000

0.10

11,400

0.14

1,700

0.17

2,000

Sub-total

29.4

0.46

134,600

0.12

35,600

0.16

4,900

0.19

5,500

Inferred

5.9

0.78

46,100

0.19

11,400

0.17

1,100

0.21

1,200

Total

35.2

0.51

180,700

0.13

47,000

0.17

5,900

0.19

6,700

Kubuk

Measured

-

-

-

-

-

-

-

-

-

Indicated

3.7

0.76

28,500

0.17

7,300

0.17

700

0.18

700

Sub-total

3.7

0.76

28,500

0.17

7,300

0.17

700

0.18

700

Inferred

22.0

0.47

104,500

0.15

32,100

0.14

3,100

0.12

2,700

Total

25.7

0.52

133,000

0.15

39,400

0.15

3,800

0.13

3,400

Vodorazdelny

Measured

0.8

0.57

4,700

0.17

1,400

0.25

200

0.25

200

Indicated

4.8

0.66

31,200

0.17

8,200

0.13

600

0.13

600

Sub-total

5.6

0.64

35,900

0.17

9,600

0.14

800

0.14

800

Inferred

-

-

-

-

-

-

-

-

-

Total

5.6

0.64

35,900

0.17

9,600

0.14

800

0.14

800

Gorny

Measured

-

-

-

-

-

-

-

-

-

Indicated

-

-

-

-

-

-

-

-

-

Sub-total

-

-

-

-

-

-

-

-

-

Inferred

7.6

0.31

23,900

0.09

7,000

0.21

1,600

0.25

1,900

Total

7.6

0.31

23,900

0.09

7,000

0.21

1,600

0.25

1,900

Total Resource

Total Measured

18.3

0.51

93,300

0.14

25,600

0.19

3,400

0.20

3,700

Total Indicated

88.7

0.44

390,900

0.12

111,100

0.11

9,600

0.11

10,200

Sub-total

107.0

0.45

484,100

0.13

136,600

0.12

13,000

0.13

13,900

Total Inferred

57.7

0.44

255,900

0.13

76,200

0.13

7,700

0.14

7,800

Grand Total

164.7

0.45

740,100

0.13

212,900

0.12

20,600

0.13

21,700

 

Resource Distribution Based On A Cutoff Grade

 

Application of a cutoff grade to report the maximum potential resource that could be mined using open pit or underground methods indicates the portion of the resource that is relevant for inclusion in potential reserve study work. It is noted that at a 0.2% cutoff grade, nearly 89% of the nickel (660,500 tonnes) and 87% (184,600 tonnes) of the copper resource is available to open pit production consideration. At an assumed underground cutoff grade of 0.5% nickel, the underground mineralisation potential includes 74% (546,800 tonnes) of the drill identified nickel mineralisation and 56% (119,500 tonnes) of the identified copper mineralisation. The average nickel grade ranges from 0.60% to .081% with copper ranging from 0.17% to 0.18%. It is also noted that nearly 50% of the total resource for nickel and copper using either cutoff grade is located within the MKF deposit making it the primary drill target of resource confirmation and resource expansion.

 

May 2016 Global Resource (Measured Plus Indicated Plus Inferred)

Cutoff Grade (% Nickel)

 

Orebody

Tonnage

Ni

Ni

Cu

Cu

Mt

%

t

%

t

MalyKrumkon/Flangovy

0.20% Nickel Cutoff Grade

50.8

0.63

320,040

0.18

91,440

0.50% Nickel Cutoff Grade

32.6

0.84

273,840

0.16

52,160

Ikenskoe/Sobolevsky

0.20% Nickel Cutoff Grade

29.5

0.58

171,100

0.15

44,250

0.50% Nickel Cutoff Grade

17.1

0.82

140,220

0.19

32,490

Kubuk

0.20% Nickel Cutoff Grade

24.5

0.54

132,300

0.16

39,200

0.50% Nickel Cutoff Grade

13.3

0.76

101,080

0.20

26,600

Vodorazdelny

0.20% Nickel Cutoff Grade

5.7

0.65

37,050

0.17

9,690

0.50% Nickel Cutoff Grade

4.1

0.77

31,570

0.20

8,200

Total Resource

0.20% Nickel Cutoff Grade

110.5

0.60

660,490

0.17

184,580

0.50% Nickel Cutoff Grade

67.1

0.81

546,710

0.18

119,450

 

2016 Drill Hole Results - Resource Definition Only

Alex Stewart Laboratory Analytical Results

 

Hole

Total

Depth

0.2% Nickel Cutoff Grade

0.5% Cutoff Grade

(m)

From

(m)

To

(m)

Length

(m)

Ni

(%)

Cu

(%)

From

(m)

To

(m)

Length

(m)

Ni

(%)

Cu

(%)

C400

47.0

No Ore

C401

301.0

199.5

205.3

5.8

0.91

0.21

201.0

205.3

4.3

1.13

0.26

214.4

219.0

4.6

1.05

0.21

214.4

217.8

3.4

1.34

0.26

C402

61.0

No Ore

C403

207.0

129.0

143.5

14.5

0.51

0.14

130.5

139.0

8.5

0.70

0.18

154.5

159.0

4.5

0.44

0.17

C406

86.5

23.5

61.7

38.2

0.72

0.18

23.5

49.0

25.5

0.84

0.22

53.5

61.7

8.2

0.62

0.14

C404

138.6

47.9

76.0

28.1

0.72

0.2

47.9

52.4

4.5

0.55

0.19

55.4

66.0

10.6

0.93

0.24

83.5

109.0

25.5

0.78

0.2

93.5

107.5

14.0

1.02

0.21

C405

171.0

131.9

136.4

4.5

0.87

0.24

131.9

136.4

4.5

0.87

0.24

154.9

163.0

8.1

0.67

0.17

156.4

163.0

6.6

0.76

0.19

C407

153.2

74.9

143.3

68.4

0.93

0.26

74.9

98.2

23.3

0.94

0.25

100.8

143.3

42.5

1.01

0.29

C408

193.0

155.0

165.5

10.5

0.79

0.25

155.0

165.5

10.5

0.79

0.25

174.4

183.3

8.9

0.55

0.14

177.5

183.3

5.8

0.65

0.13

C409

204.0

135.8

201.1

65.3

0.86

0.273

135.8

153.3

17.5

0.90

0.33

156.3

199.6

43.3

0.93

0.28

C415

271.0

233.7

244.1

10.4

0.6

0.15

235.1

241.1

6.0

0.81

0.18

250.1

259.0

8.9

0.44

0.15

253.1

256.1

3.0

0.62

0.23

C326

82.0

6.0

9.0

3.0

0.31

0.05

14.5

19.0

4.5

0.27

0.11

31.0

44.5

13.5

0.44

0.21

37.0

40.0

3.0

0.70

0.21

56.6

74.1

17.5

0.78

0.19

59.5

74.1

14.6

0.88

0.20

C327

109

94.0

98.5

4.5

0.28

0.07

C410

240.0

227.3

230.3

3.0

0.22

0.07

C411

187.0

181.1

187.0

5.9

0.27

0.13

C412

256.0

211.9

241.0

29.1

0.74

0.19

211.9

224.2

12.3

1.00

0.22

233.2

239.0

5.8

0.88

0.25

C413

187.0

151.7

157.7

6.0

0.44

0.20

163.7

166.7

3.0

0.33

0.14

C414

299.2

236.3

251.3

15.0

0.96

0.24

236.3

251.3

15.0

0.96

0.24

260.3

296.7

36.4

0.98

0.24

260.3

294.6

34.3

1.02

0.25

C416

264.0

227.2

237.5

10.3

0.75

0.23

227.2

237.5

10.3

0.75

0.23

244.0

252.4

8.4

0.56

0.15

248.5

252.4

3.9

0.79

0.20

C417

331.0

286.6

297.1

10.5

0.69

0.15

288.1

292.6

4.5

1.21

0.26

303.1

313.6

10.5

0.32

0.14

C418

314.5

274.5

292.6

18.1

0.92

0.23

274.5

290.6

16.1

0.99

0.25

C419

213.4

207.0

211.1

4.1

0.28

0.12

C420

298.0

237.7

288.6

50.9

0.82

0.21

237.7

243.4

5.7

0.70

0.20

246.8

263.3

16.5

1.24

0.22

266.3

287.1

20.8

1.07

0.27

C421

340.0

305.1

332.6

27.5

0.91

0.24

305.1

318.6

13.5

0.97

0.27

321.6

331.1

9.5

1.15

0.28

C422

360.0

No Ore

C423

358.2

No Ore

C424

202.0

98.4

110.6

12.2

0.88

0.23

100.0

112.3

12.3

0.93

0.23

174.2

180.4

6.2

0.51

0.16

177.3

180.4

3.1

0.76

0.20

C425

380.0

No Ore

C426

421.0

No Ore

C324

270.0

231.7

243.7

12.0

0.54

0.19

231.7

235.3

3.6

1.02

0.25

248.5

252.1

3.6

0.77

0.19

C325

320.0

No Ore

C328

70.0

No Ore

C329

379.0

337.4

351.3

13.9

0.81

0.21

337.4

346.8

9.4

1.04

0.26

359.7

372.0

12.3

0.65

0.16

360.8

372.0

11.2

0.69

0.17

C330

305.0

253.3

267.8

14.5

0.71

0.19

254.7

263.1

8.4

1.00

0.22

281.8

286.6

4.8

1.10

0.21

281.8

286.6

4.8

1.10

0.21

C427

432.7

No Ore

C331

216.0

No Ore

C428

331.0

317.8

321.9

4.1

0.79

0.26

317.8

321.9

4.1

0.79

0.26

C332

383.0

296.7

308.6

11.9

0.70

0.25

299.0

307.2

8.2

0.89

0.29

320.2

326.3

6.1

0.24

0.11

369.0

373.6

4.6

0.71

0.23

369.0

373.6

4.6

0.71

0.23

C429

358.0

276.5

308.0

31.5

0.95

0.22

279.5

306.5

27.0

1.05

0.25

317.0

333.8

16.8

0.96

0.26

320.0

333.8

13.8

1.06

0.28

338.6

352.0

13.4

0.94

0.25

338.6

352.0

13.4

1.01

0.27

C333

352.0

314.5

323.5

9.0

0.86

0.29

314.5

322.0

7.5

0.96

0.33

340.2

344.5

4.3

0.95

0.29

340.2

343.7

3.3

1.11

0.26

C430

421.0

357.1

370.0

12.9

0.72

0.15

357.1

358.6

1.5

2.07

0.16

361.6

366.5

4.9

0.85

0.19

384.5

387.5

3.0

0.37

0.13

401.0

410.1

9.1

0.67

0.16

403.5

408.4

4.9

0.90

0.19

C334

413.0

365.3

374.1

8.8

0.57

0.19

366.3

369.3

3.0

0.95

0.20

C335

304.1

195.8

204.1

8.3

0.81

0.30

195.8

204.1

8.3

0.82

0.30

209.3

221.2

11.9

0.85

0.24

209.3

204.1

11.9

0.85

0.25

C336

295.7

231.2

248.5

17.3

0.99

0.41

233.5

248.5

15.0

1.07

0.46

271.0

295.7

24.7

0.90

0.24

271.0

291.3

20.3

1.02

0.29

C337

313.0

In Site Analysis

C431

310.0

298.7

301.6

2.9

0.87

0.14

300.2

285.6

298.7

13.1

0.83

0.27

285.6

297.2

11.6

0.91

0.30

C432

331.0

254.8

278.0

23.2

0.83

0.28

254.8

275.5

20.7

0.89

0.30

285.6

298.7

13.1

0.83

0.27

285.6

297.2

11.6

0.91

0.30

C433

343.0

312.8

320.3

7.5

0.75

0.21

312.8

318.8

6.0

0.83

0.23

C434

241.0

173.5

192.3

18.8

0.36

0.11

178.5

181.7

3.2

0.87

0.18

201.9

208.6

6.7

0.54

0.27

203.4

207.5

4.1

0.61

0.30

225.1

233.0

7.9

0.67

0.18

226.6

231.0

4.4

0.87

0.34

C435

261.0

204.7

216.2

11.5

1.10

0.28

204.7

214.7

10.0

1.22

0.31

238.8

252.7

13.9

0.89

0.20

240.3

252.7

12.4

0.95

0.21

C436

292.0

252.7

259.1

6.4

0.67

0.21

252.7

257.5

4.8

0.82

0.26

275.6

280.8

5.2

0.80

0.23

275.6

280.8

5.2

0.81

0.24

C437

366.0

332.4

337.3

4.9

0.95

0.23

332.4

337.3

4.9

0.96

0.23

357.3

362.7

5.4

0.69

0.23

357.3

361.5

4.2

0.77

0.22

C438

190.0

101.2

104.2

3.0

0.22

0.09

C439

187.0

126.4

141.6

15.2

0.71

0.17

129.9

139.0

9.1

0.98

0.22

160.0

177.5

17.5

0.71

0.18

161.5

174.5

13.0

0.83

0.20

C440

235.0

No Ore

C441

151.0

No Ore

C442

129.0

91.1

99.0

7.9

0.83

0.19

91.1

99.0

7.9

0.83

0.20

111.0

116.1

5.1

0.50

0.17

111.0

115.0

4.0

0.58

0.18

C443

220.0

No Ore

C444

118.0

In Site Analysis

Average Interval

23.6

0.76

0.21

19.7

0.90

0.25

 

 

Click on or paste the following link into your web browser to view the Maly Kurumkon / Flangovy 2016 Drill Location Map: http://www.rns-pdf.londonstockexchange.com/rns/2669L_-2016-9-29.pdf 

Glossary

 

DEFINITIONS OF EXPLORATION RESULTS, RESOURCES & RESERVES

EXTRACTED FROM THE JORC CODE: (December 2012) (www.jorc.org)

 

A 'Mineral Resource' is a concentration or occurrence of material of intrinsic economic interest in or on the Earth's crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories.

 

An 'Inferred Mineral Resource' is that part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

 

An 'Indicated Mineral Resource' is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

 

A 'Measured Mineral Resource' is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are spaced closely enough to confirm geological and/or grade continuity.

 

An 'Ore Reserve' is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses which may occur when the material is mined. Appropriate assessments and studies have been carried out, and include consideration of and modification by realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. These assessments demonstrate at the time of reporting that extraction could reasonably be justified. Ore Reserves are sub-divided in order of increasing confidence into Probable Ore Reserves and Proved Ore Reserves.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSEUFWUFMSEFU
Date   Source Headline
29th May 202410:43 amRNSResult of AGM and GM
15th May 20248:00 amRNSSchedule One - Amur Minerals Corporation
15th May 20247:00 amRNSInvestor Presentation via Investor Meet Company
13th May 20247:00 amRNSProposed Reverse Takeover
10th May 20247:00 amRNSAUDITED FINAL RESULTS
30th Apr 20241:34 pmRNSAIM Rule 17 Schedule Two (g) update
4th Mar 20247:00 amRNSCompany Update
30th Nov 202311:41 amRNSAnnual General Meeting Results
13th Nov 20237:00 amRNSNotice of Annual General Meeting
25th Sep 20237:00 amRNSInterim Results 2023
7th Sep 20237:30 amRNSSuspension - Amur Minerals Corporation
7th Sep 20237:00 amRNSSuspension of trading on AIM
15th Aug 20239:30 amRNSCash shell update
8th Aug 20237:48 amRNSDiscussions with Amur Minerals Corporation
8th Aug 20237:00 amRNSCessation of discussions with Ascent Resources plc
30th Jun 20233:05 pmRNSAUDITED FINAL RESULTS
2nd Jun 20237:00 amRNSStatement regarding possible offer
1st Jun 20231:05 pmRNSIntention to bid for Amur Minerals Corporation
25th May 20236:00 pmRNSAmur Minerals
24th May 20234:28 pmRNSDividend Declaration
14th Mar 20231:00 pmRNSReceipt of Funds
6th Mar 20239:34 amRNSCompletion of disposal of Kun-Manie for US$35M
5th Dec 202210:43 amRNSAnnual General Meeting Results
2nd Dec 20224:41 pmRNSSecond Price Monitoring Extn
2nd Dec 20224:36 pmRNSPrice Monitoring Extension
1st Dec 20224:40 pmRNSSecond Price Monitoring Extn
1st Dec 20224:36 pmRNSPrice Monitoring Extension
10th Nov 20227:00 amRNSNotice of Annual General Meeting
7th Nov 20221:37 pmRNSTransaction Update
3rd Oct 202212:35 pmRNSTransaction Approvals Update
9th Sep 20227:00 amRNSInterim Results 2022
24th Aug 202210:26 amRNSResult of General Meeting
8th Aug 20227:00 amRNSPosting of Circular and Notice of General Meeting
5th Aug 202211:17 amRNSProposed disposal of the Kun-Manie Project
30th Jun 20227:00 amRNSAUDITED FINAL RESULTS YEAR ENDED 31 DECEMBER 2021
9th Jun 20224:40 pmRNSSecond Price Monitoring Extn
9th Jun 20224:35 pmRNSPrice Monitoring Extension
7th Jun 20227:00 amRNSKun-Manie Nickel – Copper Sulphide TEO Results
25th May 202212:03 pmRNSResult of General Meeting
10th May 20227:00 amRNSPosting of Circular and Notice of General Meeting
9th May 20227:00 amRNSProposed sale of the Kun-Manie Project
13th Apr 20227:00 amRNSRussian Sanctions Update
4th Mar 20224:41 pmRNSSecond Price Monitoring Extn
4th Mar 20224:37 pmRNSPrice Monitoring Extension
23rd Feb 202212:33 pmRNSRussian Sanctions – No Impact
16th Feb 20224:40 pmRNSSecond Price Monitoring Extn
16th Feb 20224:35 pmRNSPrice Monitoring Extension
11th Feb 20227:00 amRNSExercise of Warrants and Issue of Equity
3rd Feb 202212:20 pmRNSExercise of Warrants and Issue of Equity
28th Jan 202210:54 amRNSExercise of Warrants and Issue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.