The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmur Minerals Regulatory News (AMC)

  • This share is currently suspended. It was suspended at a price of 0.09

Share Price Information for Amur Minerals (AMC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.09
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.09
AMC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Early Positive Kubuk Results Doubles 2013 Drill Pl

3 Jul 2013 07:00

RNS Number : 4504I
Amur Minerals Corporation
03 July 2013
 



 

3 July 2013

 

AMUR MINERALS CORPORATION

(AIM: AMC)

 

Early Positive Kubuk Results Doubles 2013 Drill Plan

 

Amur Minerals Corporation ("Amur" or the "Company"), a nickel-copper sulphide mineral exploration and resource development company focused on the far east of Russia, is pleased to provide an update on its 2013 drill progress at its Kubuk target.

 

Highlights:

 

·; As a result of preliminary analyses, the initial discovery holes having intersected substantial thicknesses of mineralisation at higher than average grades and mineralisation being near surface, the Company intends to double the planned metres for Kubuk from 2,500 to 5,000 metres;

·; Orientation of the mineralised structure is more shallowly dipping than originally interpreted, which is more favourable to open pit mining and the thickest intercepts are located immediately down dip of the trenches at shallower depths of up to 100 metres;

·; Niton XL2 500 X-Ray Fluoresence unit ("RFA") results from the ten holes located in the easternmost area of Kubuk contain mineral with average thicknesses of 28 metres per hole containing 0.7% nickel and 0.2% copper. The average interval thickness is 13.4 metres, with some holes containing more than one mineralised zone;

·; Plus 1.0% nickel has been encountered within a total of 76.6 drilled metres, averaging 1.2% nickel and 0.4% copper. More than 25% of the intervals containing a minimum of 0.2% nickel exceed 1.0% nickel content and indicate that approximately 47% of the total contained metal is present within these high grade intervals; and

·; Hole C237 contains the largest and among the highest grade with a total of 67 metres of mineralisation averaging approximately 1.1% nickel and 0.3% copper.

 

The Board reports on one of the largest and highest quality anomalies defined within the Kurumkon Trend, located at its Kun-Manie exploration licence, where substantial thicknesses of mineralisation at higher than average grades have been located near the surface. The Company reports that it will double the planned metres for Kubuk from 2,500 to 5,000 metres.

 

In addition, early assessments indicate the greater thickness and higher grades are located within 100 to 150 metres of the mineralisation exposed in the trenches, a configuration highly suited for open pit mining and which requires shallower exploration drill holes to define the presence or absence of mineralisation.

 

As reported at the time of the Company's 12 June 2013 statement, Amur commenced drilling on the Kubuk target within the Kurumkon Trend located at its Kun-Manie exploration licence. The Kubuk target area is one of the largest and highest quality anomalies defined within the Trend. As of 25 June 2013, 12 holes have been completed containing a total 1,813 metres of which ten holes containing 1,281 metres have been analysed using the Company's RFA. Within the ten analysed holes, approximately 282 metres contain nickel and copper in excess of 0.2% nickel averaging 0.7% nickel and 0.2% copper.

 

Drilling began at Kubuk on 29 May 2013 and has continued on an uninterrupted basis. Twelve holes containing 1,813 total metres have been completed as of 25 June 2013 with 10 having been analysed for nickel and copper using the Company's RFA unit located at its sample preparation facility on site.

 

Drilling has initially been focused on the easternmost 200 metre wide area of the 2013 Kubuk target area, adjacent and down dip of two existing trenches. The trenches are located 100 metres apart and are two of several located along a 750 metre long out crop extending to the west. Globally, the trenches have exposed an average mineralised length of 48.3 metres, containing average grades of 0.63% nickel and 0.16% copper as defined by Alex Stewart Laboratories, Moscow, Russia.

 

The 10 analysed core holes contain approximately 282 mineralised metres with potential economic grades in excess of 0.2% nickel, as established by the RFA unit at site. All 10 holes contain at least one mineralised interval. The average total metres of mineralisation per analysed hole are 28.2 metres with the average discrete interval thickness being 13.4 metres. The average grades are indicated to be 0.7 nickel and 0.2% copper.

 

Detailed analysis of the RFA unit results also indicates that plus 1.0% nickel intervals are present within the drilled holes. Seven holes contain an average total plus 1.0% nickel and a thickness of 10.9 metres with the average individual intercept averaging 3.8 metres. The average grade of these high grade intervals is 1.2% nickel and 0.4% copper. To date, the higher grade intervals contain nearly 47% of the mineral identified in the ten holes.

 

Sectional interpretation and 3D assessment of the distribution of the metal thus far defined indicates the greater thickness and higher grades are located within 100 to 150 metres of the mineralisation exposed in the trenches. This configuration is highly suited for open pit mining and requires shallower exploration drill holes to define the presence or absence of mineralisation. Due to this configuration and the highly positive results, the Company has refined the 2013 drill programme and now intends to double drilling at Kubuk from 2,500 metres to 5,000 metres. Step out drilling is planned to be conducted on a closer spacing and to encompass the entire area where trenches indicate the presence of mineralisation. Holes will also be completed to collect material for metallurgical test work.

 

The samples for the first 10 holes were delivered via helicopter to Khabarovsk, Russia on 29 June 2013 and are being transshipped to Alex Stewart Laboratories ("ASL") for final analysis which is both certified and suitable for use in resource and reserve estimation. Results will be provided to the market when available.

 

At the bottom of this statement, the results from the RFA unit are provided as are the discrete intervals of higher grades. In addition, a link is provided here for accompanying schematics of the Kubuk drill progress: www.amurminerals.com

 

The Company cautions readers that while the mineralisation is indicated to be present, definitive analytical results establishing the final economic grades of metal will be derived from the certified Alex Stewart Laboratory located in Moscow, Russia. The RFA values reported herein are therefore indicative and are not the final results that would be used in a resource and reserve estimate.

 

Robin Young, CEO of Amur Minerals, commented:

"The early stage results at Kubuk are encouraging and have so far supported the reconnaissance surface work previously completed in the area. The presence of the larger thicknesses and higher grades immediately adjacent to the trenches, has resulted in our decision to double our drilling plan in the area and we shall continue drilling within this area for a good portion of our season. The Board looks forward to providing added interim drill updates and at a point in the future, calling this our newest discovery containing additional resources and reserves."

 

Enquiries:

 

Company

Amur Minerals Corp.

Nomad and Joint Broker

S.P. Angel Finance

Joint Broker

Sanlam Securities UK Ltd

Public Relations

Yellow Jersey

Robin Young CEO

Ewan Leggat

Laura Littley

Lindsay Mair

Dominic Barretto

Anna Legge

+44 (0) 7981 126 818

+44 (0) 20 3463 2260

+44 (0) 20 7628 2200

+44 (0) 77 6853 7739

 

Notes to Editor

 

Available for view on www.amurminerals.com are drawings of drill results accumulated to date within the Company's Kun-Manie licence area at Kubuk. Please use the following link in your web browser to access these drawings:

 

Web link: http://www.rns-pdf.londonstockexchange.com/rns/4504I_-2013-7-2.pdf 

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Robin Young. Mr. Young is a Geological Engineer (cum laude) and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges.

 

The Accuracy and Acceptability of RFA Results

 

The Company cautions readers on the accuracy and acceptability of its Niton XL2 500 X-Ray Fluoresence units ("RFA") derived results. Even though geological examination of the drill core has confirmed that the host structure is present, definitive analytical results will be attained when certified laboratory analyses are provided by Alex Stewart Laboratories (ALS). The results derived from the RFA at site are considered to be preliminary but within the range of acceptable accuracy for selecting the limits of the mineralised zones and defining the potential grade of the samples tested.

Procedures include calibration of the unit at the beginning and end of each shift, a manufacturer set of standards are checked to verify proper reporting and that there was no drift during the course of the shift. In addition, ASL derived results from previous and on-going assaying programmes are checked using the RFA unit. The Company updates its control sample set using newly acquired sample results from ASL. During 2012, the difference between the RFA unit and ASL were within 10% of one another.

The reported values provided in this statement have been given an accuracy of one significant digit due to the potential variability of the unit. Final certified ALS results may differ from those reported in this statement.

 

Kubuk RFA Drill Core Results

3 July 2013

Diamond Core Hole Results

0.2% Ni Cut Off Grade

Diamond Core Hole Results

1.0% Ni Cut Off Grade

Hole #

From

To

Length (m)

Ni%

Cu%

From

To

Length (m)

Ni%

Cu%

C234

13.0

48.0

35.0

0.5

0.2

39.0

40.5

1.5

1.1

0.3

C234-1

18.0

48.0

30.0

0.8

0.2

19.5

22.5

3.0

1.1

0.3

24.0

28.5

4.5

1.3

0.4

33.0

36.0

3.0

1.0

0.3

C235

35.5

61.8

26.3

0.6

0.3

40.0

44.5

4.5

1.2

0.4

58.0

61.8

3.8

1.2

0.4

C236

18.0

60.0

42.0

0.8

0.3

21.0

24.0

3.0

1.3

0.3

25.2

30.0

4.8

1.1

0.3

34.5

36.0

1.5

1.1

0.4

37.5

43.5

6.0

1.3

0.4

52.5

54.0

1.5

1.1

0.4

57.0

58.2

1.2

1.2

0.3

C237

46.0

88.5

42.5

1.1

0.3

48.0

53.5

5.5

1.3

0.3

62.5

71.6

9.1

1.4

0.4

73.0

82.0

9.0

1.4

0.4

83.5

86.5

3.0

1.1

0.4

C237

97.0

116.5

19.5

0.9

0.3

99.3

106.0

6.7

1.1

0.3

112.7

113.7

1.0

1.0

0.4

C238

110.5

113.5

3.0

0.3

0.1

No +1.0% Intervals

C238

137.2

139.0

1.8

0.3

0.1

C238

140.5

145.0

4.5

0.4

0.2

C238

147.2

152.6

5.4

0.5

0.2

C233

97.0

122.0

25.0

0.6

0.3

113.5

115.0

1.5

1.1

0.5

119.5

122.0

2.5

1.4

0.6

C239

137.5

143.5

6.0

0.5

0.2

No +1.0% Intervals

C240

85.0

86.5

1.5

0.3

0.2

No +1.0% Intervals

C240

89.2

90.7

1.5

0.4

0.1

C240

93.9

98.9

5.0

0.6

0.2

C240

107.9

121.0

13.1

0.5

0.2

C241

109.0

112.0

3.0

0.4

0.1

No +1.0% Intervals

C241

125.5

128.5

3.0

0.3

0.1

C241

130.0

134.5

4.5

0.7

0.2

C241

136.0

143.5

7.5

0.5

0.3

C241

145.0

146.5

1.5

0.6

0.1

C230

RFA Results Pending

C242

Average for 10 Holes

28.2

0.73

0.24

Average +1.0% Ni 7 Holes

10.9

1.24

0.37

Average Interval

13.4

0.73

0.24

Average +1.0% Ni Interval

3.8

1.24

0.37

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGUMUMUPWGQP
Date   Source Headline
30th Apr 20241:34 pmRNSAIM Rule 17 Schedule Two (g) update
4th Mar 20247:00 amRNSCompany Update
30th Nov 202311:41 amRNSAnnual General Meeting Results
13th Nov 20237:00 amRNSNotice of Annual General Meeting
25th Sep 20237:00 amRNSInterim Results 2023
7th Sep 20237:30 amRNSSuspension - Amur Minerals Corporation
7th Sep 20237:00 amRNSSuspension of trading on AIM
15th Aug 20239:30 amRNSCash shell update
8th Aug 20237:48 amRNSDiscussions with Amur Minerals Corporation
8th Aug 20237:00 amRNSCessation of discussions with Ascent Resources plc
30th Jun 20233:05 pmRNSAUDITED FINAL RESULTS
2nd Jun 20237:00 amRNSStatement regarding possible offer
1st Jun 20231:05 pmRNSIntention to bid for Amur Minerals Corporation
25th May 20236:00 pmRNSAmur Minerals
24th May 20234:28 pmRNSDividend Declaration
14th Mar 20231:00 pmRNSReceipt of Funds
6th Mar 20239:34 amRNSCompletion of disposal of Kun-Manie for US$35M
5th Dec 202210:43 amRNSAnnual General Meeting Results
2nd Dec 20224:41 pmRNSSecond Price Monitoring Extn
2nd Dec 20224:36 pmRNSPrice Monitoring Extension
1st Dec 20224:40 pmRNSSecond Price Monitoring Extn
1st Dec 20224:36 pmRNSPrice Monitoring Extension
10th Nov 20227:00 amRNSNotice of Annual General Meeting
7th Nov 20221:37 pmRNSTransaction Update
3rd Oct 202212:35 pmRNSTransaction Approvals Update
9th Sep 20227:00 amRNSInterim Results 2022
24th Aug 202210:26 amRNSResult of General Meeting
8th Aug 20227:00 amRNSPosting of Circular and Notice of General Meeting
5th Aug 202211:17 amRNSProposed disposal of the Kun-Manie Project
30th Jun 20227:00 amRNSAUDITED FINAL RESULTS YEAR ENDED 31 DECEMBER 2021
9th Jun 20224:40 pmRNSSecond Price Monitoring Extn
9th Jun 20224:35 pmRNSPrice Monitoring Extension
7th Jun 20227:00 amRNSKun-Manie Nickel – Copper Sulphide TEO Results
25th May 202212:03 pmRNSResult of General Meeting
10th May 20227:00 amRNSPosting of Circular and Notice of General Meeting
9th May 20227:00 amRNSProposed sale of the Kun-Manie Project
13th Apr 20227:00 amRNSRussian Sanctions Update
4th Mar 20224:41 pmRNSSecond Price Monitoring Extn
4th Mar 20224:37 pmRNSPrice Monitoring Extension
23rd Feb 202212:33 pmRNSRussian Sanctions – No Impact
16th Feb 20224:40 pmRNSSecond Price Monitoring Extn
16th Feb 20224:35 pmRNSPrice Monitoring Extension
11th Feb 20227:00 amRNSExercise of Warrants and Issue of Equity
3rd Feb 202212:20 pmRNSExercise of Warrants and Issue of Equity
28th Jan 202210:54 amRNSExercise of Warrants and Issue of Equity
25th Jan 202211:21 amRNSPress Speculation & Share Price Movement
29th Dec 20214:41 pmRNSSecond Price Monitoring Extn
29th Dec 20214:36 pmRNSPrice Monitoring Extension
6th Dec 20211:44 pmRNSAnnual General Meeting Results
24th Nov 20217:00 amRNSShareholder Q&A

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.