Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
6.50    -0.66 (-9.43%)
Bid:
6.00
Ask:
7.00
Spread: 1.00 (16.667%)
Market Cap: £25.95m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Sonora Lithium Project Update

25 Mar 2015 07:15

RNS Number : 3976I
Rare Earth Minerals PLC
25 March 2015
 

25 March 2015

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Sonora Lithium Project Update

Rare Earth Minerals Plc (AIM: REM) is pleased to announce the initial results from the successful drilling campaign on La Ventana, and the intersection of a new lithium target on El Sauz / Fleur.

The programme on La Ventana was primarily in-fill drilling which will be utilised to increase confidence in the current mineral resources. In addition a hole drilled to identify possible resource expansion targets to the west of the current delineated ore bodies on Ventana and El Sauz / Fleur, successfully intersected at shallow depth two clay beds of 7.8 metres and 38.7 metres respectively.

Good progress is also being made on the process design work, in particular Hatch Pty Ltd, along with other key consultants have been working with Bacanora Minerals Ltd ("Bacanora") to work on plant design, process optimisation and equipment sizing for commercial scale plant and equipment.

The full Bacanora news release is available at http://www.bacanoraminerals.com/

 

David Lenigas, The Company's Chairman, commented;

"The intersection of what appears to be a repeat structure to the immediate west of the already defined 3.28 million tonnes of indicated mineral resource, is further excellent news for the possible expansion of the mineral resource at Sonora Lithium Project."

 

"This progress along with the advancement of the design of a commercial lithium compound production plant should mean that not only should we see increasing certainty around the potential production of lithium compounds from the Sonora Project, but also an expanding resource to meet the forecasted demand curve in the coming years."

 

Exploration and Resource Development:

La Ventana concession:

· 2,100 metres have been drilled in 14 in-fill holes on La Ventana, a further nine holes remain to be drilled in the ongoing programme.

· Intercepts of the Upper Clay range from 26.1 to 50.8 metres in length and those for the Lower Clay range from 12.98 to 22.5 metres on La Ventana.

· Analyses received for the first three holes indicate that weighted averages for lithium content in the Upper Clay Unit varies from 955 ppm over 41.6 metres (hole LV-19) to 2,264 ppm Li over 7.75 metres (hole LV-21); for the Lower Clay Unit lithium content varies from 1,618 ppm over 23.84 metres to 2,649 ppm over 12.80 metres. Individual 1.5 metre long samples of clay range up to 5,130 ppm Li.

El Sauz and Fleur concessions:

· Drill hole ES-42, a hole that was sited to target further possible expansion in mineral resources, intersected 7.8 metres of the Upper Clay Unit at a depth of 16 metres below surface and 23.0 metres of the Lower Clay Unit at 38.7 metres below the surface.

· The intercepts from hole ES-42, represents an additional mineral resource target area, which is intended to be pursued through further drilling.

· The proximity of this new discovery to the current mineral resource on La Ventana and El Sauz and Fleur, may allow it to be included as part of the mine planning and mine design work currently being carried out.

 

Lithium Plant and Process Design Work:

· Hatch Pty Ltd. ("Hatch"), Bacanora' s engineering consultant, have completed their initial work and provided Bacanora with several optimisation and process engineering recommendations for the production of Lithium Carbonate and Lithium Hydroxide.

· Process Engineering, LLC, of Tucson, Arizona, in association with Ernest Burga, a lithium process engineer, is continuing work on plant design, scale-up and process certification;

· Sonora Resources, LLC, of Yuma, Arizona, a private engineering consultancy, has been contracted to provide the pre-feasibility study for the proposed lithium mining and lithium carbonate production facility;

· Ore-to-product metallurgical test work continues on one tonne bulk ore samples taken from surface exposures on the Sonora Lithium Project. This test work is part of the optimization work on lithium carbonate recovery and is required to provide design criteria for full size plant and equipment. Process optimisation studies at the Company's pilot plant in Hermosillo have been aided by the addition of a gas-fired rotary calcining unit for roasting lithium-bearing samples as well as resin columns in the lithium carbonate recovery circuit.

 

Details of REM's ownership:

REM owns 15.02% of Bacanora. This interest, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of 40.51%.

 

- Ends -

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting +44 (0) 207 929 5599

David Bick

Mark Longson

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUPGWUPAUMA
Date   Source Headline
17th Sep 20137:00 amRNSInvestments
16th Sep 20137:21 amRNSInvestments
13th Sep 20137:00 amRNSMexico Lithium Project Update
10th Sep 20135:49 pmRNSExercise of Warrants
10th Sep 20137:00 amRNSREM Granted Greenland Exploration Licence
9th Sep 20137:00 amRNSREM Closes Part of Equity Swap for £2.16 million
5th Sep 20137:00 amRNSCOMPLETION OF PLACING AND JOINT VENTURE STAGE 2
4th Sep 20137:00 amRNSMexico Lithium Joint Venture Update
30th Aug 20133:40 pmRNSExercise of Option in Mexico Lithium Project
29th Aug 20132:42 pmRNSExercise of Warrants
29th Aug 20137:00 amRNSMexico Lithium Project Maiden Resource Estimate
28th Aug 20132:37 pmRNSStatement re: JV Partner Trading Halt in Canada
27th Aug 20137:00 amRNSIncrease in ownership of Mexico Lithium Project
23rd Aug 20137:00 amRNSPlacement of Equity
21st Aug 20137:00 amRNSFinal Drill Results Mexico Lithium Project
14th Aug 201310:51 amRNSUpdate on Mexico Lithium Project
13th Aug 20132:10 pmRNSStatement re: Mexico Lithium Project Update
16th Jul 20134:08 pmRNSResult of AGM
25th Jun 201312:53 pmRNSFinal Results
24th Jun 20137:00 amRNSInitial Drill Results On Sonora Lithium Project
17th Jun 20137:00 amRNSMexico Drilling Update and Placing
7th Jun 20137:00 amRNSDrilling Update
4th Jun 20137:00 amRNSDrilling Update - Mexican Lithium Joint Venture
23rd May 20137:00 amRNSFarm-In Finalised and Drilling Commences
11th Apr 20137:09 amRNSUpdate on Lithium Joint Venture, Mexico
25th Mar 20137:00 amRNSField Work Commences on the Bacanora
11th Mar 20132:59 pmRNSCompletion of Placing
6th Mar 20134:31 pmRNSEquity Placement
14th Feb 20137:00 amRNSREM signs Lithium farm-in deal in Northern Mexico
4th Feb 20137:00 amRNSREM applies for Greenland Rare Earth Licence
14th Dec 20125:33 pmRNSAmendment to Options
13th Dec 20123:21 pmRNSIssue of Options
6th Dec 20127:00 amRNSCompletion of Placing
30th Nov 20122:49 pmRNSTR1 - Notification of major interest in shares
28th Nov 201210:59 amRNSEquity Placement
20th Nov 20122:07 pmRNSTR1 - Notification of major interest in shares
19th Nov 20124:59 pmRNSTR1 - Notification of major interestin shares
2nd Nov 201212:08 pmRNSResult of AGM
9th Oct 201211:05 amRNSNotice of AGM
24th Sep 20124:23 pmRNSInterim Results
7th Sep 20123:03 pmRNSResignation of Director
25th Jul 20128:29 amRNSAward of Greenland Exploration Licences
16th Apr 20121:33 pmRNSDirectorate Change
2nd Apr 20127:00 amRNSReplacement : Final Results
30th Mar 20127:00 amRNSFinal Results
29th Mar 201212:55 pmRNSYangibana Project
3rd Jan 20129:44 amRNSHolding(s) in Company
6th Dec 20117:00 amRNSAcquisition of Interest
1st Dec 201111:39 amRNSInvestment in Australian Project
24th Oct 20117:00 amRNSFollow-up Rare Earth Samples from Canada

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.