Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.20
Bid: 4.10
Ask: 4.30
Change: 0.05 (1.20%)
Spread: 0.20 (4.878%)
Open: 4.20
High: 4.20
Low: 4.20
Prev. Close: 4.15
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Sonora Lithium Project Update

25 Mar 2015 07:15

RNS Number : 3976I
Rare Earth Minerals PLC
25 March 2015
 

25 March 2015

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Sonora Lithium Project Update

Rare Earth Minerals Plc (AIM: REM) is pleased to announce the initial results from the successful drilling campaign on La Ventana, and the intersection of a new lithium target on El Sauz / Fleur.

The programme on La Ventana was primarily in-fill drilling which will be utilised to increase confidence in the current mineral resources. In addition a hole drilled to identify possible resource expansion targets to the west of the current delineated ore bodies on Ventana and El Sauz / Fleur, successfully intersected at shallow depth two clay beds of 7.8 metres and 38.7 metres respectively.

Good progress is also being made on the process design work, in particular Hatch Pty Ltd, along with other key consultants have been working with Bacanora Minerals Ltd ("Bacanora") to work on plant design, process optimisation and equipment sizing for commercial scale plant and equipment.

The full Bacanora news release is available at http://www.bacanoraminerals.com/

 

David Lenigas, The Company's Chairman, commented;

"The intersection of what appears to be a repeat structure to the immediate west of the already defined 3.28 million tonnes of indicated mineral resource, is further excellent news for the possible expansion of the mineral resource at Sonora Lithium Project."

 

"This progress along with the advancement of the design of a commercial lithium compound production plant should mean that not only should we see increasing certainty around the potential production of lithium compounds from the Sonora Project, but also an expanding resource to meet the forecasted demand curve in the coming years."

 

Exploration and Resource Development:

La Ventana concession:

· 2,100 metres have been drilled in 14 in-fill holes on La Ventana, a further nine holes remain to be drilled in the ongoing programme.

· Intercepts of the Upper Clay range from 26.1 to 50.8 metres in length and those for the Lower Clay range from 12.98 to 22.5 metres on La Ventana.

· Analyses received for the first three holes indicate that weighted averages for lithium content in the Upper Clay Unit varies from 955 ppm over 41.6 metres (hole LV-19) to 2,264 ppm Li over 7.75 metres (hole LV-21); for the Lower Clay Unit lithium content varies from 1,618 ppm over 23.84 metres to 2,649 ppm over 12.80 metres. Individual 1.5 metre long samples of clay range up to 5,130 ppm Li.

El Sauz and Fleur concessions:

· Drill hole ES-42, a hole that was sited to target further possible expansion in mineral resources, intersected 7.8 metres of the Upper Clay Unit at a depth of 16 metres below surface and 23.0 metres of the Lower Clay Unit at 38.7 metres below the surface.

· The intercepts from hole ES-42, represents an additional mineral resource target area, which is intended to be pursued through further drilling.

· The proximity of this new discovery to the current mineral resource on La Ventana and El Sauz and Fleur, may allow it to be included as part of the mine planning and mine design work currently being carried out.

 

Lithium Plant and Process Design Work:

· Hatch Pty Ltd. ("Hatch"), Bacanora' s engineering consultant, have completed their initial work and provided Bacanora with several optimisation and process engineering recommendations for the production of Lithium Carbonate and Lithium Hydroxide.

· Process Engineering, LLC, of Tucson, Arizona, in association with Ernest Burga, a lithium process engineer, is continuing work on plant design, scale-up and process certification;

· Sonora Resources, LLC, of Yuma, Arizona, a private engineering consultancy, has been contracted to provide the pre-feasibility study for the proposed lithium mining and lithium carbonate production facility;

· Ore-to-product metallurgical test work continues on one tonne bulk ore samples taken from surface exposures on the Sonora Lithium Project. This test work is part of the optimization work on lithium carbonate recovery and is required to provide design criteria for full size plant and equipment. Process optimisation studies at the Company's pilot plant in Hermosillo have been aided by the addition of a gas-fired rotary calcining unit for roasting lithium-bearing samples as well as resin columns in the lithium carbonate recovery circuit.

 

Details of REM's ownership:

REM owns 15.02% of Bacanora. This interest, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of 40.51%.

 

- Ends -

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting +44 (0) 207 929 5599

David Bick

Mark Longson

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUPGWUPAUMA
Date   Source Headline
30th May 20249:10 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
7th May 20248:24 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
18th Apr 20247:00 amRNSFurther Progress at the Amapa Iron Ore Project
11th Apr 202410:01 amRNSEuropean Metals Holdings - Cinovec Lithium Project
9th Apr 20248:59 amRNSCorporate Update - Evergreen Lithium
5th Apr 20241:23 pmRNSPlacing to raise £500,000 & Issue of Warrants
28th Mar 20249:59 amRNSUpdate on Amapá Project investment & Equity Stake
27th Mar 202410:25 amRNSEuropean Metals Holdings - Cinovec Project Update
22nd Mar 20247:00 amRNSOptimisation Study Delivers Savings at Amapá
14th Mar 20249:18 amRNSCorporate Update - Evergreen Lithium
7th Mar 20247:00 amRNSProgress at the Amapá Project & Corporate Update
29th Jan 202410:05 amRNSCorporate Update
29th Jan 20249:53 amRNSEMH - Cinovec Exploration Licenses
22nd Jan 20248:56 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
22nd Dec 20238:15 amRNSCorporate Update – European Metals Holdings
30th Nov 20239:06 amRNSCorporate Update - Evergreen Lithium
22nd Nov 202311:39 amRNSCorporate Update - Hastings Technology Metals
16th Nov 20237:00 amRNSSonora Lithium Investment Update
9th Nov 20239:12 amRNSCorporate Update - European Metals Holdings
31st Oct 20237:00 amRNSDirector Share Purchases
30th Oct 20237:00 amRNSStrategic Development and Financing
29th Sep 20239:53 amRNSInterim Results
18th Sep 20238:43 amRNSCorporate Update - Evergreen Lithium
12th Sep 20239:10 amRNSCorporate Update - Hastings Technology Metals
11th Sep 20239:44 amRNSAmapá Iron Ore Project Update
31st Aug 20237:52 amRNSSonora Lithium Investment Update
16th Aug 202311:52 amRNSResult of AGM
4th Aug 20238:55 amRNSCorporate Update - Hastings Technology Metals
25th Jul 202312:25 pmRNSNotice of AGM
21st Jul 202310:12 amRNSCorporate Update – European Metals Holdings
28th Jun 20239:11 amRNSCorporate Update - Evergreen Lithium ANT Analysis
27th Jun 20237:00 amRNSAnnual Results for the year ended 31 December 2022
13th Jun 20239:49 amRNSCorporate Update - Hastings Technology Metals
9th Jun 202311:46 amRNSUpdate EMH Land secured for Cinovec lithium plant
1st Jun 20239:01 amRNSCorporate Update - Evergreen Lithium
31st May 202312:52 pmRNSCorporate Update - Hastings Technology Metals
26th May 20232:48 pmRNSAmapa Project Update & Loan Financing
25th May 20231:43 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
25th May 20238:42 amRNSEMH Announcement: Outstanding Lithium Recoveries
10th May 202312:12 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
3rd May 20235:17 pmRNSCorporate Update - Hastings Technology Metals
13th Apr 20238:56 amRNSNotice of Substantial Shareholder in Evergreen
1st Mar 20237:00 amRNSCorporate Update
30th Jan 202311:47 amRNSEuropean Metals Announcement: Just Transition Fund
26th Jan 20238:26 amRNSListing of Evergreen Lithium on the ASX
25th Jan 20238:35 amRNSCompletion of Sale of Yangibana JV Interest
10th Jan 20232:05 pmRNSSecond Price Monitoring Extn
10th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSDirector Share Purchases
3rd Jan 20237:00 amRNSCompletion of PFS on Amapá Iron Ore Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.