Amapa Iron Ore Project Update

26 Nov 2024 07:00

RNS Number : 5679N
Cadence Minerals PLC
26 November 2024
 

The company deems the information contained within this announcement to constitute Inside Information as stipulated under the Market Abuse Regulation (E.U.) No. 596/2014, as it forms part of U.K. domestic law under the European Union (Withdrawal) Act 2018, as amended. Upon the publication of this announcement via a regulatory information service, this information is considered to be in the public domain.

 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence", or "the Company")

 

Amapa Iron Ore Project Confirms Ability to Produce +67% Fe High Purity, Direct Reduction Iron Concentrates

 

Cadence Minerals (AIM: KDNC) is pleased to announce the metallurgical test results confirming the ability to produce high-purity, Direct Reduction grade ("DR-grade") iron concentrates at the Amapá Iron Ore Project ("Amapá" or the "Project") in northern Brazil.

 

Highlights:

· DR grade concentrate produced at 67.5% Fe with total silica and alumina below 1.5%.

· The process flowsheet has been confirmed to have a PFS level of accuracy.

· DR concentrate was achieved with a finer grind, magnetic separation and reverse flotation, as outlined in the announcement on 17 September 2024.

· The forecast premium for DR-Grade concentrate is projected to rise to around US$20 for each 1% iron content above 65% Fe benchmark.

· A revised economic model based on the DR-Grade sheet is being prepared.

CEO, Kiran Morzaria, commented: "We are excited to announce a significant milestone in the development of the Amapá Project. We have successfully produced a DR-Grade grade concentrate of 67.5% iron, characterised by low silica and alumina levels. The production of DR-grade products at Amapá will substantially improve the project's economics and allow us to further our discussion with potential collaborators and joint venture partners."

 

"The demand for DR-grade products is essential for steel production methods that significantly lower carbon emissions. The demand for DR-grade feed is anticipated to increase by more than five-fold by 2050, reflecting the steel industry's commitment to decarbonisation. Despite the current limited supply of these products, DR-grade offerings are already commanding substantial price premiums, highlighting their value in the market."

 

Chairman, Andrew Suckling, added: "On behalf of myself and the Board, I'd like to record our thanks and gratitude to our shareholders and stakeholders for their patience as we complete each milestone on the road to recommissioning Amapa. Our ability to produce this DR-grade concentrate adds a new value dimension to our flagship project. It gives the Board huge confidence that Amapa can play a role in "green steel" production and the decarbonisation of the iron and steel industry."

 

Metallurgical Test Work Programme

Cadence previously announced that Amapá had developed a process flow sheet for producing Direct Reduction ("DR grade") concentrates with combined SiO2 ("silica") and Al2O3 ("alumina") levels below the steel industry's DR grade standard of 2.5%. The initial results from the test work program have validated the Project's process flowsheet's ability to produce DR-grade concentrates.

 

The test results produced a weighted average final product with a concentrate grade of 67.5% Fe and impurity levels of 0.6% SiO2 and 0.8% Al2O3. Furthermore, the iron concentrate grade is expected to be higher and exceed 68% Fe by appropriately adjusting the flotation reagent process parameters.

 

Pei Si Engineering Incorporated ("PSEI") conducted the test work and designed the flow sheet. The primary section of the flow sheet, which aims to upgrade the 65% product to 67%, involves regrinding, magnetic separation, and flotation. The test work was carried out on a +65% iron ore concentrate produced from the Amapá Project.

 

The metallurgical test work established that the optimal flowsheet utilised a regrind, which feeds into a low-intensity magnetic separator ("LIMS"). This process produces two streams: the first stream goes to a reverse flotation circuit, while the second stream is sent to a high-intensity magnetic separator ("HIMS"), followed by a second reverse flotation circuit.

 

The results indicate that using a fine grinding process (with a fineness of -0.045mm at 79.5%)-LIMS-HIMS-flotation, two types of flotation iron concentrates were obtained: Concentrate I and Concentrate II. Concentrate I achieved a yield of 12.31%, a grade of 69.36% Fe, with SiO2 and Al2O3 contents of 0.10% and 0.39%, respectively, and a total iron recovery rate of 12.89%. Concentrate II yielded 70.57%, with a grade of 67.15% Fe, SiO2 content of 0.71%, Al2O3 content of 0.92%, and a total iron recovery rate of 71.55%. The iron concentrate grade is expected to exceed 68% with appropriate adjustments to the flotation reagent process parameters. The test results are presented in Table 1.

 

Table 1 Grinding-LIMS-HIMS-Flotation Test Results (%)

Product

Yield

Grade

Fe Recovery

Rate

Fe

SiO2

Al2O3

P

Flotation Con I

12.31

69.36

0.10

0.39

0.039

12.89

Flotation Con II

70.57

67.15

0.71

0.92

0.089

71.55

Flotation Middling

0.96

67.14

2.32

2.87

0.118

0.98

Flotation Tailings

6.25

65.92

3.29

3.13

0.22

6.22

HIMS Tailings

9.91

55.94

3.12

3.42

0.27

8.36

Feed

100.00

66.23

1.05

1.26

0.11

100.00

 

Product Analysis

The head assays of concentrate I, concentrate II, and the calculated product are shown in Table 2 below:

 

Table 2 The head assays of Concentrate I and Concentrate II (%)

Product

Fe

SiO2

Al2O3

S

P

Cu

TiO2

CaO

MgO

Concentrate I

69.36

0.10

0.39

0.0014

0.039

0.001

0.014

0.02

0.020

Concentrate II

67.15

0.71

0.92

0.0017

0.089

0.002

0.025

0.03

0.026

Product

67.48

0.62

0.84

0.0020

0.082

0.002

0.023

0.03

0.025

 

Upon microscopic examination of the sample, it was observed that the iron minerals were highly liberated, reaching over 90%, with occasional intergrowths of gangue minerals, such as quartz, alongside iron minerals like hematite. Fine grinding can further enhance liberation, which is beneficial for mineral processing to reduce the silica and alumina impurity content in the iron concentrate. It was also noted that phosphorus primarily adsorbs onto hematite, resulting in isomorphous substitutions. Given the iron content (above 67% Fe) and the low levels of silica and alumina impurities (totalling less than 2.5%), this product can be marketed as direct reduced ("DR") grade iron ore concentrate[1].

 

"Dr Grade" Concentrate Market and Price

The DR-grade feed suitable for low-emission steelmaking represents 3% of global seaborne iron ore production. Its availability is crucial for transitioning to "green steel" and decarbonising the iron and steel industry. DR-grade concentrates are used as feedstock for new Direct Reduced Iron / Electric Arc Furnace (DRI-EAF) facilities, replacing older, coal-dependent Blast Furnace / Basic Oxygen Furnace (BF-BOF) operations.

 

High-grade Blast Furnace feed (over 66% iron) is increasingly sought during this transition, as it lowers carbon emissions when blended with lower-grade Direct Shipping Ores (under 62% iron). The metallurgical tests focus on producing DR-grade Concentrates. These concentrates typically contain over 67.5% iron and low levels of impurities like silica, alumina, phosphorus, and sulphur, with a total of below 3%.

The current premium for DR-grade iron ore is approximately US$5 for each 1% iron content above 65%[2]. In comparison, this premium is projected to rise to around US$20 for each 1% iron content above 65%[3]. This change would have a positive impact on the Project's net present value ("NPV") of US$1.14 billion. We anticipate an improvement in the NPV in our updated economic model.

 

Next Steps

Testing has been conducted at the pre-feasibility study ("PFS") level. PSEI is currently reviewing the flow sheet outlined in Figure 1 below. The goal is to publish a revised economic analysis at the PFS level incorporating a product stream with an expected purity of 67.5% and an updated NPV.

 

Figure 1 Amapa Process Flowsheet

 

About the Amapá Project and Cadence Ownership

The Amapá Project is a brownfield integrated iron ore project in the Amapá State of Brazil. It has Mineral Resources of 276 million tonnes ("Mt") at 38.33% Iron ("Fe") and Ore Reserves of 196 Mt at 39.34%. The Project consists of the mine, processing plant, wholly owned port and a 194km railway, all operated by PBA.

 

As of 31 August 2024, Cadence's total investment in the Amapá million was approximately US$14.2 million, and its equity stake in the project stands at 34.5%, an increase of approximately US$0.57 million since 30 June 2024

 

For further information contact:

 

Cadence Minerals plc

+44 (0) 20 3582 6636

Andrew Suckling

Kiran Morzaria

Zeus Capital Limited (NOMAD & Broker)

+44 (0) 20 3829 5000

James Joyce

Darshan Patel

Fortified Securities - Joint Broker

+44 (0) 20 3411 7773

Guy Wheatley

Brand Communications

+44 (0) 7976 431608

Public & Investor Relations

Alan Green

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Cautionary and Forward-Looking Statements

Certain statements in this announcement are or may be considered forward-looking. Forward-looking statements are identified by their use of terms and phrases such as "believe", "could", "should", "envisage", "estimate", "intend", "may", "plan", "will", or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the company's future growth results of operations performance, future capital, and other expenditures (including the amount, nature, and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements, including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes actions by governmental authorities, the availability of capital markets reliance on crucial personnel uninsured and underinsured losses and other factors many of which are beyond the control of the company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The company cannot assure investors that results will be consistent with such forward-looking statements.

 

 


[1] Page 11, https://www.championiron.com/wp-content/uploads/2024/05/champion-may-2024-investors-presentation-final.pdf

[2] Page 56, https://www.angloamerican.com/~/media/Files/A/Anglo-American-Group-v5/PLC/investors/investor-presentations/anglo-american-hy24-results-presentation.pdf

[3] Page 56, https://www.angloamerican.com/~/media/Files/A/Anglo-American-Group-v5/PLC/investors/investor-presentations/anglo-american-hy24-results-presentation.pdf

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEAKFSADNLFFA
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.