Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
6.50    0.00 (0.00%)
Bid:
6.00
Ask:
7.00
Spread: 1.00 (16.667%)
Market Cap: £26.60m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Sonora Lithium Project Update

25 Mar 2015 07:15

RNS Number : 3976I
Rare Earth Minerals PLC
25 March 2015
 

25 March 2015

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Sonora Lithium Project Update

Rare Earth Minerals Plc (AIM: REM) is pleased to announce the initial results from the successful drilling campaign on La Ventana, and the intersection of a new lithium target on El Sauz / Fleur.

The programme on La Ventana was primarily in-fill drilling which will be utilised to increase confidence in the current mineral resources. In addition a hole drilled to identify possible resource expansion targets to the west of the current delineated ore bodies on Ventana and El Sauz / Fleur, successfully intersected at shallow depth two clay beds of 7.8 metres and 38.7 metres respectively.

Good progress is also being made on the process design work, in particular Hatch Pty Ltd, along with other key consultants have been working with Bacanora Minerals Ltd ("Bacanora") to work on plant design, process optimisation and equipment sizing for commercial scale plant and equipment.

The full Bacanora news release is available at http://www.bacanoraminerals.com/

 

David Lenigas, The Company's Chairman, commented;

"The intersection of what appears to be a repeat structure to the immediate west of the already defined 3.28 million tonnes of indicated mineral resource, is further excellent news for the possible expansion of the mineral resource at Sonora Lithium Project."

 

"This progress along with the advancement of the design of a commercial lithium compound production plant should mean that not only should we see increasing certainty around the potential production of lithium compounds from the Sonora Project, but also an expanding resource to meet the forecasted demand curve in the coming years."

 

Exploration and Resource Development:

La Ventana concession:

· 2,100 metres have been drilled in 14 in-fill holes on La Ventana, a further nine holes remain to be drilled in the ongoing programme.

· Intercepts of the Upper Clay range from 26.1 to 50.8 metres in length and those for the Lower Clay range from 12.98 to 22.5 metres on La Ventana.

· Analyses received for the first three holes indicate that weighted averages for lithium content in the Upper Clay Unit varies from 955 ppm over 41.6 metres (hole LV-19) to 2,264 ppm Li over 7.75 metres (hole LV-21); for the Lower Clay Unit lithium content varies from 1,618 ppm over 23.84 metres to 2,649 ppm over 12.80 metres. Individual 1.5 metre long samples of clay range up to 5,130 ppm Li.

El Sauz and Fleur concessions:

· Drill hole ES-42, a hole that was sited to target further possible expansion in mineral resources, intersected 7.8 metres of the Upper Clay Unit at a depth of 16 metres below surface and 23.0 metres of the Lower Clay Unit at 38.7 metres below the surface.

· The intercepts from hole ES-42, represents an additional mineral resource target area, which is intended to be pursued through further drilling.

· The proximity of this new discovery to the current mineral resource on La Ventana and El Sauz and Fleur, may allow it to be included as part of the mine planning and mine design work currently being carried out.

 

Lithium Plant and Process Design Work:

· Hatch Pty Ltd. ("Hatch"), Bacanora' s engineering consultant, have completed their initial work and provided Bacanora with several optimisation and process engineering recommendations for the production of Lithium Carbonate and Lithium Hydroxide.

· Process Engineering, LLC, of Tucson, Arizona, in association with Ernest Burga, a lithium process engineer, is continuing work on plant design, scale-up and process certification;

· Sonora Resources, LLC, of Yuma, Arizona, a private engineering consultancy, has been contracted to provide the pre-feasibility study for the proposed lithium mining and lithium carbonate production facility;

· Ore-to-product metallurgical test work continues on one tonne bulk ore samples taken from surface exposures on the Sonora Lithium Project. This test work is part of the optimization work on lithium carbonate recovery and is required to provide design criteria for full size plant and equipment. Process optimisation studies at the Company's pilot plant in Hermosillo have been aided by the addition of a gas-fired rotary calcining unit for roasting lithium-bearing samples as well as resin columns in the lithium carbonate recovery circuit.

 

Details of REM's ownership:

REM owns 15.02% of Bacanora. This interest, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of 40.51%.

 

- Ends -

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting +44 (0) 207 929 5599

David Bick

Mark Longson

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUPGWUPAUMA
Date   Source Headline
25th Aug 20158:48 amRNSHolding(s) in Company
19th Aug 201511:58 amRNSYangibana REE Project Update
12th Aug 201511:55 amRNSUpdate on Yangibana Rare Earths Element Project
31st Jul 20157:00 amRNSAppointment of Director
24th Jul 201512:00 pmRNSResult of AGM
17th Jul 20152:00 pmRNSHolding(s) in Company
8th Jul 20157:00 amRNSSonora Lithium Project Update
8th Jul 20157:00 amRNSREM increases interest in European Lithium Project
1st Jul 201510:30 amRNSNotice of AGM and Posting of Results
1st Jul 201510:23 amRNSREM increases interest in European Lithium Project
1st Jul 20157:00 amRNSWestern Lithium Announces Merger
29th Jun 20157:30 amRNSFiling of Technical Report, Sonora Lithium Project
25th Jun 20157:00 amRNSResults for the year ended 31 December 2014
24th Jun 20157:00 amRNSHolding(s) in Company
23rd Jun 20153:33 pmRNSREM acquires strategic interest in Lithium Project
17th Jun 20157:27 amRNSWestern Lithium Continues Optimisation Studies
10th Jun 20152:04 pmRNSREM increases strategic holding in Bacanora
9th Jun 201512:50 pmRNSREM increases strategic holding in Bacanora
5th Jun 20157:00 amRNSSonora Lithium and Borates Project Update
28th May 20157:00 amRNSHolding(s) in Company
22nd May 20157:00 amRNSSonora Lithium Project Drilling Results
14th May 20157:00 amRNSUpdate in Lithium Resources for the Sonora Project
22nd Apr 20157:00 amRNSDirectorate Change
21st Apr 20154:53 pmRNSHolding(s) in Company
21st Apr 201511:37 amRNSHolding(s) in Company
9th Apr 201510:46 amRNSREM increases strategic holding in Bacanora
8th Apr 20157:01 amRNSUpdate on Yangibana Rare Earths Element Project
1st Apr 20154:35 pmRNSPrice Monitoring Extension
25th Mar 20157:15 amRNSSonora Lithium Project Update
25th Mar 20157:14 amRNSYangibana Update
20th Mar 20157:00 amRNSREM's Chairman joins the board of Bacanora
17th Mar 20157:00 amRNSSRK Consulting contracted to Sonora Project
13th Mar 20154:28 pmRNSHolding(s) in Company
9th Mar 20159:15 amRNSUpdate on Yangibana Rare Earths Element Project
4th Mar 201510:55 amRNSHolding(s) in Company
4th Mar 20157:00 amRNSREM's Chairman to join the board of Bacanora
3rd Mar 20152:36 pmRNSHolding(s) in Company
3rd Mar 20157:40 amRNSREM increases strategic holding in Bacanora
2nd Mar 201511:03 amRNSUpdate on Mexico Investments
25th Feb 20157:17 amRNSWestern Lithium Produces First High Purity Lithium
19th Feb 201512:00 pmRNSHolding(s) in Company
19th Feb 20157:00 amRNSREM increases strategic holding in Bacanora
17th Feb 20151:38 pmRNSHolding(s) in Company
16th Feb 20154:34 pmRNSREM increases strategic holding in Bacanora
12th Feb 20156:12 pmRNSREM increases strategic holding in Bacanora
12th Feb 20157:00 amRNSREM Requisitions Meeting of Bacanora
27th Jan 20157:00 amRNSFull Scoping Study & Updated Company Presentation
22nd Jan 201511:35 amRNSHolding(s) in Company
22nd Jan 201510:10 amRNSChange of Adviser
22nd Jan 20157:00 amRNSDismissal of Adviser

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.