Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.40    -0.25 (-3.27%)
Bid:
7.10
Ask:
7.70
Spread: 0.60 (8.451%)
Market Cap: £30.28m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Sonora Lithium Project Drilling Results

22 May 2015 07:00

RNS Number : 9929N
Rare Earth Minerals PLC
22 May 2015
 

22 May 2015

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Sonora Lithium Project Drilling Results

Rare Earth Minerals Plc (LSE AIM: REM)) is pleased to announce the assay results of the 23 hole drilling campaign completed on the Sonora Lithium Project, Sonora Mexico ("the Project"), previously announced on 23 March 2015.

The campaign was primarily carried out on La Ventana and consisted of infill drilling. The geological intersections were utilised in the Mineral Resource Estimate published on the 14 May 2015.

In addition, we report the hole that was drilled to identify possible resource expansion targets to the west of the current delineated ore bodies at La Ventana and El Sauz / Fleur, which successfully intersected two clay beds at shallow depth and returned strong assay results of up to 2.3% LCE.

Highlights:

· A total of 2,946 metres were drilled in the 22 in-fill holes from La Ventana.

· Intercepts of the Upper Clay range from 26.10 to 50.83 metres in length and those for the Lower Clay range from 12.98 to 23.57 metres at La Ventana.

· Analyses received for 18 of the 22 holes indicate that the lithium content of both the Upper and Lower clays increase to the south at La Ventana as well as maintaining grade and thickness:

o Weighted averages (Table 1 below) for lithium content in the Upper Clay Unit varies from 955 ppm Li (0.5% LCE ) over 41.6 metres (hole LV-19) to 3,215 ppm Li (1.7% LCE) over 17.48 metres (hole LV-27);

o For the Lower Clay Unit lithium content varies from 1,143 ppm Li (0.6% LCE) over 19.20 metres (hole LV-18) to 5,830 ppm Li (3.1% LCE) over 20.42 metres (LV-27).

o Individual 1.5 metre long samples of clay range up to 10,000 ppm Li (5.32% LCE).

· The hole drilled on the Fleur concession intersected 7.16 metres of the Upper Clay unit, which averaged 3,107 ppm Li (1.7% LCE) and 25.30 metres of the Lower Clay, which averaged 4,242 ppm Li (2.3% LCE).

A map with the drill holes highlighted is available on the Company's website (www.rareearthmineralsplc.com)

David Lenigas, the Company's Chairman commented:

"We are delighted with the assay results from the La Ventana infill drilling programme, these numbers correlate well with our current geological model, in particular the higher grades in southern portion of Ventana and northern portion of Fleur."

"Additionally, the assay results in the exploratory hole at Fleur were very encouraging, given both the strong assay results and the intersection of the mineralised zone from only 17 metres below the surface, we believe this to be viable target for further exploration work, with the potential to deliver further mineral resources at low strip ratios."

Details of REM's ownership:

REM owns a direct interest of 15.4% in Bacanora (AIM:BCN), and through that holds an indirect interest in the La Ventana asset of 15.4%. In addition the 15.4% in Bacanora, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of Megalit S.A. de CV and Mexalit S.A. de CV of 40.78%.

Table 1. Summary of Lithium-bearing intercepts - La Ventana

Hole No

Unit

From (m)

To (m)

Length (m)

Weighted average Li ppm

LCE %

LV-18

Upper Clay

218.24

245.67

27.43

577

0.3

including

226.31

230.43

4.12

1,213

0.65

Lower Clay

260.30

279.50

19.20

1,143

0.6

including

274.02

279.50

5.49

2,248

1.2

LV-19

Upper Clay

10.24

51.82

41.58

955

0.5

including

16.46

22.40

5.94

1,340

0.7

including

32.92

48.77

15.85

1,595

0.85

LV-20

Upper Clay

219.46

252.07

32.61

584

0.3

including

240.49

247.19

6.71

1,284

0.7

Lower Clay

268.35

291.39

23.04

1,618

0.9

including

279.20

289.86

10.67

2,141

1.1

LV-21

Upper Clay

8.92

59.74

50.83

1,194

0.6

including

30.96

38.71

7.75

2,264

1.2

including

49.07

59.74

10.67

2,150

1.1

Lower Clay

72.24

92.96

20.73

1,759

0.9

including

80.16

92.96

12.80

2,649

1.4

LV-22

Upper Clay

25.91

35.86

9.96

1,339

0.7

Upper Clay

44.50

57.30

12.80

2,643

1.4

Lower Clay

77.40

90.02

12.62

3,915

2.1

LV-23

Upper Clay

38.56

53.64

15.10

2,982

1.6

Lower Clay

69.65

85.95

16.20

3,756

2.0

LV-24

Upper Clay

101.19

112.17

11.00

1,716

0.9

Upper Clay

116.43

130.02

13.60

2,780

1.5

Lower Clay

145.21

158.88

13.60

4,122

2.2

LV-25

Upper Clay

137.72

155.75

18.03

2,199

1.2

including

145.08

154.23

9.14

3,035

1.6

LV-26

Upper Clay

30.48

48.77

18.29

2,018

1.1

Lower Clay

59.44

76.05

16.61

2,701

1.4

including

59.44

66.45

7.01

4,203

2.2

LV-27

Upper Clay

48.67

66.14

17.48

3,215

1.7

Lower Clay

78.03

98.45

20.42

5,830

3.1

LV-28

Upper Clay

138.38

165.93

27.55

2,617

1.4

including

153.62

165.93

12.31

4,306

2.3

Lower Clay

179.83

203.30

23.47

5,228

2.8

LV-29

Upper Clay

8.23

35.66

27.43

2,284

1.2

including

24.69

35.66

10.97

3,297

1.8

Lower Clay

51.82

79.25

27.43

4,507

2.4

including

51.82

74.68

22.86

5,395

2.9

LV-31

Upper Clay

147.83

185.52

37.69

1,453

0.8

including

173.61

185.52

11.91

2,963

1.6

Lower Clay

203.68

227.38

23.70

2,921

1.6

including

206.65

218.85

12.19

4,174

2.2

LV-35

Lower Clay

12.34

33.41

21.06

5,786

3.1

LV-36

Lower Clay

15.32

35.36

20.04

4,370

2.3

LV-37

Lower Clay

14.81

35.36

20.55

4,105

2.2

LV-38

Lower Clay

13.92

37.49

23.57

3,153

1.7

LV-39

Lower Clay

6.40

26.52

20.12

2,379

1.3

 

Table 2. Summary of Lithium-bearing intercepts - Fleur

Hole No

Unit

From (m)

To (m)

Length (m)

Weighted average Li ppm

LCE %

ES-42

Upper Clay

16.15

23.32

7.16

3,107

1.7

Lower Clay

39.32

64.62

25.30

4,242

2.3

 

The lithological intersections from these drill results were used in the MRE prepared by SRK Consulting (UK) Limited (as announced by the Company via its news release dated May 13, 2015), however as the assay results were not available at the time and therefore were excluded from the MRE calculations.

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Ends

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

Glossary:

LCE: is the industry standard terminology for, and is equivalent to, Li2CO3. 1 ppm Li metal is equivalent to 5.32 ppm LCE / Li2CO3. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

ppm: parts per million

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGURPAUPAPPG
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.