Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.00    0.15 (2.19%)
Bid:
6.70
Ask:
7.30
Spread: 0.60 (8.955%)
Market Cap: £28.65m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Sonora Lithium Project Drilling Results

22 May 2015 07:00

RNS Number : 9929N
Rare Earth Minerals PLC
22 May 2015
 

22 May 2015

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Sonora Lithium Project Drilling Results

Rare Earth Minerals Plc (LSE AIM: REM)) is pleased to announce the assay results of the 23 hole drilling campaign completed on the Sonora Lithium Project, Sonora Mexico ("the Project"), previously announced on 23 March 2015.

The campaign was primarily carried out on La Ventana and consisted of infill drilling. The geological intersections were utilised in the Mineral Resource Estimate published on the 14 May 2015.

In addition, we report the hole that was drilled to identify possible resource expansion targets to the west of the current delineated ore bodies at La Ventana and El Sauz / Fleur, which successfully intersected two clay beds at shallow depth and returned strong assay results of up to 2.3% LCE.

Highlights:

· A total of 2,946 metres were drilled in the 22 in-fill holes from La Ventana.

· Intercepts of the Upper Clay range from 26.10 to 50.83 metres in length and those for the Lower Clay range from 12.98 to 23.57 metres at La Ventana.

· Analyses received for 18 of the 22 holes indicate that the lithium content of both the Upper and Lower clays increase to the south at La Ventana as well as maintaining grade and thickness:

o Weighted averages (Table 1 below) for lithium content in the Upper Clay Unit varies from 955 ppm Li (0.5% LCE ) over 41.6 metres (hole LV-19) to 3,215 ppm Li (1.7% LCE) over 17.48 metres (hole LV-27);

o For the Lower Clay Unit lithium content varies from 1,143 ppm Li (0.6% LCE) over 19.20 metres (hole LV-18) to 5,830 ppm Li (3.1% LCE) over 20.42 metres (LV-27).

o Individual 1.5 metre long samples of clay range up to 10,000 ppm Li (5.32% LCE).

· The hole drilled on the Fleur concession intersected 7.16 metres of the Upper Clay unit, which averaged 3,107 ppm Li (1.7% LCE) and 25.30 metres of the Lower Clay, which averaged 4,242 ppm Li (2.3% LCE).

A map with the drill holes highlighted is available on the Company's website (www.rareearthmineralsplc.com)

David Lenigas, the Company's Chairman commented:

"We are delighted with the assay results from the La Ventana infill drilling programme, these numbers correlate well with our current geological model, in particular the higher grades in southern portion of Ventana and northern portion of Fleur."

"Additionally, the assay results in the exploratory hole at Fleur were very encouraging, given both the strong assay results and the intersection of the mineralised zone from only 17 metres below the surface, we believe this to be viable target for further exploration work, with the potential to deliver further mineral resources at low strip ratios."

Details of REM's ownership:

REM owns a direct interest of 15.4% in Bacanora (AIM:BCN), and through that holds an indirect interest in the La Ventana asset of 15.4%. In addition the 15.4% in Bacanora, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of Megalit S.A. de CV and Mexalit S.A. de CV of 40.78%.

Table 1. Summary of Lithium-bearing intercepts - La Ventana

Hole No

Unit

From (m)

To (m)

Length (m)

Weighted average Li ppm

LCE %

LV-18

Upper Clay

218.24

245.67

27.43

577

0.3

including

226.31

230.43

4.12

1,213

0.65

Lower Clay

260.30

279.50

19.20

1,143

0.6

including

274.02

279.50

5.49

2,248

1.2

LV-19

Upper Clay

10.24

51.82

41.58

955

0.5

including

16.46

22.40

5.94

1,340

0.7

including

32.92

48.77

15.85

1,595

0.85

LV-20

Upper Clay

219.46

252.07

32.61

584

0.3

including

240.49

247.19

6.71

1,284

0.7

Lower Clay

268.35

291.39

23.04

1,618

0.9

including

279.20

289.86

10.67

2,141

1.1

LV-21

Upper Clay

8.92

59.74

50.83

1,194

0.6

including

30.96

38.71

7.75

2,264

1.2

including

49.07

59.74

10.67

2,150

1.1

Lower Clay

72.24

92.96

20.73

1,759

0.9

including

80.16

92.96

12.80

2,649

1.4

LV-22

Upper Clay

25.91

35.86

9.96

1,339

0.7

Upper Clay

44.50

57.30

12.80

2,643

1.4

Lower Clay

77.40

90.02

12.62

3,915

2.1

LV-23

Upper Clay

38.56

53.64

15.10

2,982

1.6

Lower Clay

69.65

85.95

16.20

3,756

2.0

LV-24

Upper Clay

101.19

112.17

11.00

1,716

0.9

Upper Clay

116.43

130.02

13.60

2,780

1.5

Lower Clay

145.21

158.88

13.60

4,122

2.2

LV-25

Upper Clay

137.72

155.75

18.03

2,199

1.2

including

145.08

154.23

9.14

3,035

1.6

LV-26

Upper Clay

30.48

48.77

18.29

2,018

1.1

Lower Clay

59.44

76.05

16.61

2,701

1.4

including

59.44

66.45

7.01

4,203

2.2

LV-27

Upper Clay

48.67

66.14

17.48

3,215

1.7

Lower Clay

78.03

98.45

20.42

5,830

3.1

LV-28

Upper Clay

138.38

165.93

27.55

2,617

1.4

including

153.62

165.93

12.31

4,306

2.3

Lower Clay

179.83

203.30

23.47

5,228

2.8

LV-29

Upper Clay

8.23

35.66

27.43

2,284

1.2

including

24.69

35.66

10.97

3,297

1.8

Lower Clay

51.82

79.25

27.43

4,507

2.4

including

51.82

74.68

22.86

5,395

2.9

LV-31

Upper Clay

147.83

185.52

37.69

1,453

0.8

including

173.61

185.52

11.91

2,963

1.6

Lower Clay

203.68

227.38

23.70

2,921

1.6

including

206.65

218.85

12.19

4,174

2.2

LV-35

Lower Clay

12.34

33.41

21.06

5,786

3.1

LV-36

Lower Clay

15.32

35.36

20.04

4,370

2.3

LV-37

Lower Clay

14.81

35.36

20.55

4,105

2.2

LV-38

Lower Clay

13.92

37.49

23.57

3,153

1.7

LV-39

Lower Clay

6.40

26.52

20.12

2,379

1.3

 

Table 2. Summary of Lithium-bearing intercepts - Fleur

Hole No

Unit

From (m)

To (m)

Length (m)

Weighted average Li ppm

LCE %

ES-42

Upper Clay

16.15

23.32

7.16

3,107

1.7

Lower Clay

39.32

64.62

25.30

4,242

2.3

 

The lithological intersections from these drill results were used in the MRE prepared by SRK Consulting (UK) Limited (as announced by the Company via its news release dated May 13, 2015), however as the assay results were not available at the time and therefore were excluded from the MRE calculations.

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Ends

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

Glossary:

LCE: is the industry standard terminology for, and is equivalent to, Li2CO3. 1 ppm Li metal is equivalent to 5.32 ppm LCE / Li2CO3. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

ppm: parts per million

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGURPAUPAPPG
Date   Source Headline
13th Jan 20202:40 pmRNSUpdate - Macarthur Minerals
3rd Jan 20201:23 pmRNSHolding(s) in Company
23rd Dec 20193:22 pmRNSMacarthur Minerals Secures Land at Lake Giles
11th Dec 201910:19 amRNSMacarthur Minerals Intersects High Grade Magnetite
9th Dec 20197:00 amRNSReinstatement of Railway Concessions at Amapá
27th Nov 20198:52 amRNSHastings Tech Metals Yangibana Funding Update
25th Nov 20199:28 amRNSSuccessful Bulk Ore Trial Results at Yangibana
20th Nov 20199:52 amRNSEMH & CEZ - Cinovec Partnership & Investment
11th Nov 201912:10 pmRNSBacanora Sonora Lithium Project Update
5th Nov 201910:10 amRNSMacarthur JV Partner FE Limited Commences Drilling
4th Nov 20191:03 pmRNSYangibana Mineral Resource & Ore Reserves
31st Oct 20197:00 amRNSMacarthur JV Partner Expands Drilling Programme
28th Oct 201910:50 amRNSAuroch Confirms High Grade Nickel At Saints
21st Oct 201911:04 amRNSContract Awarded for Yangibana Processing Plant
15th Oct 20191:34 pmRNSHolding(s) in Company
14th Oct 20199:41 amRNSAuroch Minerals Saints Nickel Project Update
14th Oct 20199:40 amRNSBacanora Lithium Strategic Investment Completed
10th Oct 20199:26 amRNSUpdate - Macarthur Minerals
30th Sep 20192:49 pmRNSMacarthur Minerals to Seek Dual Listing on ASX
27th Sep 20197:45 amRNSInterim results for the period ended 30 June 2019
20th Sep 20192:20 pmRNSResult of AGM & Share Consolidation
16th Sep 20193:52 pmRNSMacarthur Minerals Drilling at Lake Giles Project
16th Sep 201912:15 pmRNSAuroch Saints Nickel Drilling Programme Commences
6th Sep 20199:57 amRNSMacarthur Minerals JV Partner - Assay Results
3rd Sep 20198:24 amRNSAuroch Minerals Saints Drilling Programme
30th Aug 20199:05 amRNSSecond Price Monitoring Extn
30th Aug 20199:00 amRNSPrice Monitoring Extension
30th Aug 20197:00 amRNSApproval of Judicial Restructuring Plan - Amapa
27th Aug 20192:58 pmRNSNotice of AGM and Share Consolidation
23rd Aug 20194:13 pmRNSUpdate - Macarthur Minerals
22nd Aug 20195:03 pmRNSMacarthur Minerals Lake Giles Update
20th Aug 20199:03 amRNSBacanora Lithium update on Ganfeng Investment
20th Aug 20199:03 amRNSYangibana Project Environmental Approval
6th Aug 20194:06 pmRNSMacarthur Minerals Joint Venture Partner Update
5th Aug 20198:36 amRNSUpdate - European Metals Cinovec License Extension
1st Aug 201912:45 pmRNSUpdate - Bacanora Investment & Cadence Loan Notes
18th Jul 20198:23 amRNSUpdate - Auroch Minerals Saints Nickel Project
17th Jul 20199:52 amRNSUpdate - Yangibana - Hastings Technology Metals
16th Jul 20199:36 amRNSUpdate - European Metals Holdings
15th Jul 20191:07 pmRNSHolding(s) in Company
15th Jul 20191:05 pmRNSCorporate Update
11th Jul 201911:00 amRNSUpdate - Auroch Minerals
11th Jul 20197:48 amRNSUpdate - Macarthur Minerals
5th Jul 20192:29 pmRNSUpdate - Macarthur Minerals
4th Jul 201910:39 amRNSUpdate - Macarthur Minerals
3rd Jul 20192:57 pmRNSDirector Share Purchases
1st Jul 20197:00 amRNSUpdate - Bacanora Lithium
18th Jun 20198:27 amRNSUpdate - Auroch Minerals
18th Jun 20198:09 amRNSUpdate - Macarthur Minerals
17th Jun 20199:53 amRNSUpdate - European Metals Holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.