Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
6.35    -0.15 (-2.31%)
Bid:
6.00
Ask:
6.70
Spread: 0.70 (11.667%)
Market Cap: £25.99m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Sonora Lithium Project Drilling Results

22 May 2015 07:00

RNS Number : 9929N
Rare Earth Minerals PLC
22 May 2015
 

22 May 2015

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Sonora Lithium Project Drilling Results

Rare Earth Minerals Plc (LSE AIM: REM)) is pleased to announce the assay results of the 23 hole drilling campaign completed on the Sonora Lithium Project, Sonora Mexico ("the Project"), previously announced on 23 March 2015.

The campaign was primarily carried out on La Ventana and consisted of infill drilling. The geological intersections were utilised in the Mineral Resource Estimate published on the 14 May 2015.

In addition, we report the hole that was drilled to identify possible resource expansion targets to the west of the current delineated ore bodies at La Ventana and El Sauz / Fleur, which successfully intersected two clay beds at shallow depth and returned strong assay results of up to 2.3% LCE.

Highlights:

· A total of 2,946 metres were drilled in the 22 in-fill holes from La Ventana.

· Intercepts of the Upper Clay range from 26.10 to 50.83 metres in length and those for the Lower Clay range from 12.98 to 23.57 metres at La Ventana.

· Analyses received for 18 of the 22 holes indicate that the lithium content of both the Upper and Lower clays increase to the south at La Ventana as well as maintaining grade and thickness:

o Weighted averages (Table 1 below) for lithium content in the Upper Clay Unit varies from 955 ppm Li (0.5% LCE ) over 41.6 metres (hole LV-19) to 3,215 ppm Li (1.7% LCE) over 17.48 metres (hole LV-27);

o For the Lower Clay Unit lithium content varies from 1,143 ppm Li (0.6% LCE) over 19.20 metres (hole LV-18) to 5,830 ppm Li (3.1% LCE) over 20.42 metres (LV-27).

o Individual 1.5 metre long samples of clay range up to 10,000 ppm Li (5.32% LCE).

· The hole drilled on the Fleur concession intersected 7.16 metres of the Upper Clay unit, which averaged 3,107 ppm Li (1.7% LCE) and 25.30 metres of the Lower Clay, which averaged 4,242 ppm Li (2.3% LCE).

A map with the drill holes highlighted is available on the Company's website (www.rareearthmineralsplc.com)

David Lenigas, the Company's Chairman commented:

"We are delighted with the assay results from the La Ventana infill drilling programme, these numbers correlate well with our current geological model, in particular the higher grades in southern portion of Ventana and northern portion of Fleur."

"Additionally, the assay results in the exploratory hole at Fleur were very encouraging, given both the strong assay results and the intersection of the mineralised zone from only 17 metres below the surface, we believe this to be viable target for further exploration work, with the potential to deliver further mineral resources at low strip ratios."

Details of REM's ownership:

REM owns a direct interest of 15.4% in Bacanora (AIM:BCN), and through that holds an indirect interest in the La Ventana asset of 15.4%. In addition the 15.4% in Bacanora, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of Megalit S.A. de CV and Mexalit S.A. de CV of 40.78%.

Table 1. Summary of Lithium-bearing intercepts - La Ventana

Hole No

Unit

From (m)

To (m)

Length (m)

Weighted average Li ppm

LCE %

LV-18

Upper Clay

218.24

245.67

27.43

577

0.3

including

226.31

230.43

4.12

1,213

0.65

Lower Clay

260.30

279.50

19.20

1,143

0.6

including

274.02

279.50

5.49

2,248

1.2

LV-19

Upper Clay

10.24

51.82

41.58

955

0.5

including

16.46

22.40

5.94

1,340

0.7

including

32.92

48.77

15.85

1,595

0.85

LV-20

Upper Clay

219.46

252.07

32.61

584

0.3

including

240.49

247.19

6.71

1,284

0.7

Lower Clay

268.35

291.39

23.04

1,618

0.9

including

279.20

289.86

10.67

2,141

1.1

LV-21

Upper Clay

8.92

59.74

50.83

1,194

0.6

including

30.96

38.71

7.75

2,264

1.2

including

49.07

59.74

10.67

2,150

1.1

Lower Clay

72.24

92.96

20.73

1,759

0.9

including

80.16

92.96

12.80

2,649

1.4

LV-22

Upper Clay

25.91

35.86

9.96

1,339

0.7

Upper Clay

44.50

57.30

12.80

2,643

1.4

Lower Clay

77.40

90.02

12.62

3,915

2.1

LV-23

Upper Clay

38.56

53.64

15.10

2,982

1.6

Lower Clay

69.65

85.95

16.20

3,756

2.0

LV-24

Upper Clay

101.19

112.17

11.00

1,716

0.9

Upper Clay

116.43

130.02

13.60

2,780

1.5

Lower Clay

145.21

158.88

13.60

4,122

2.2

LV-25

Upper Clay

137.72

155.75

18.03

2,199

1.2

including

145.08

154.23

9.14

3,035

1.6

LV-26

Upper Clay

30.48

48.77

18.29

2,018

1.1

Lower Clay

59.44

76.05

16.61

2,701

1.4

including

59.44

66.45

7.01

4,203

2.2

LV-27

Upper Clay

48.67

66.14

17.48

3,215

1.7

Lower Clay

78.03

98.45

20.42

5,830

3.1

LV-28

Upper Clay

138.38

165.93

27.55

2,617

1.4

including

153.62

165.93

12.31

4,306

2.3

Lower Clay

179.83

203.30

23.47

5,228

2.8

LV-29

Upper Clay

8.23

35.66

27.43

2,284

1.2

including

24.69

35.66

10.97

3,297

1.8

Lower Clay

51.82

79.25

27.43

4,507

2.4

including

51.82

74.68

22.86

5,395

2.9

LV-31

Upper Clay

147.83

185.52

37.69

1,453

0.8

including

173.61

185.52

11.91

2,963

1.6

Lower Clay

203.68

227.38

23.70

2,921

1.6

including

206.65

218.85

12.19

4,174

2.2

LV-35

Lower Clay

12.34

33.41

21.06

5,786

3.1

LV-36

Lower Clay

15.32

35.36

20.04

4,370

2.3

LV-37

Lower Clay

14.81

35.36

20.55

4,105

2.2

LV-38

Lower Clay

13.92

37.49

23.57

3,153

1.7

LV-39

Lower Clay

6.40

26.52

20.12

2,379

1.3

 

Table 2. Summary of Lithium-bearing intercepts - Fleur

Hole No

Unit

From (m)

To (m)

Length (m)

Weighted average Li ppm

LCE %

ES-42

Upper Clay

16.15

23.32

7.16

3,107

1.7

Lower Clay

39.32

64.62

25.30

4,242

2.3

 

The lithological intersections from these drill results were used in the MRE prepared by SRK Consulting (UK) Limited (as announced by the Company via its news release dated May 13, 2015), however as the assay results were not available at the time and therefore were excluded from the MRE calculations.

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Ends

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

Glossary:

LCE: is the industry standard terminology for, and is equivalent to, Li2CO3. 1 ppm Li metal is equivalent to 5.32 ppm LCE / Li2CO3. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

ppm: parts per million

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGURPAUPAPPG
Date   Source Headline
15th Jul 20203:22 pmRNSMacarthur Minerals - Arc Track Access Agreement
14th Jul 20209:42 amRNSEMH DGWA Appointment & Proposed Czech Listing
7th Jul 20201:33 pmRNSAmapá Project Update
1st Jul 20209:25 amRNSYangibana Finnvera Project Financing
26th Jun 20203:23 pmRNSMacarthur Minerals - Lake Giles Developments
26th Jun 20207:00 amRNSResults for the Year Ended 31 December 2019
18th Jun 20209:32 amRNSMajor Drilling Programme Commences at Yangibana
17th Jun 202010:58 amRNSYangibana Works Construction Permit Granted
16th Jun 20207:00 amRNSAmapá Operational Update
8th Jun 20207:00 amRNSAmapá Operational Update,Placing to Raise £650,000
5th Jun 20205:44 pmRNSLoan Note Conversion
5th Jun 202011:05 amRNSSecond Price Monitoring Extn
5th Jun 202011:00 amRNSPrice Monitoring Extension
5th Jun 202010:03 amRNSAmended: Macarthur JV Partner Completes Royalty Sa
5th Jun 20207:00 amRNSMacarthur JV Partner Completes Royalty Sale
3rd Jun 20202:06 pmRNSSecond Price Monitoring Extn
3rd Jun 20202:01 pmRNSPrice Monitoring Extension
3rd Jun 20209:31 amRNSYangibana JV Partner Agreement with Schaeffler
2nd Jun 20203:47 pmRNSHolding(s) in Company
28th May 20202:07 pmRNSMacarthur JV Partner - FIRB Approves Royalty Sale
28th May 202010:53 amRNSBacanora Sonora & Lithium Market Update
26th May 20203:47 pmRNSMacarthur Minerals JV Partner - $7m Royalty Sale
6th May 20201:44 pmRNSTotal Voting Rights and Capital
6th May 20207:00 amRNSMacarthur Lake Giles Assay Results Completed
1st May 20205:27 pmRNSPlacing Update
1st May 202011:16 amRNSAmapá Update, Placing and Loan Note Restructuring
30th Apr 20208:57 amRNSEuropean Metals Holdings - Cinovec PMP Granted
29th Apr 20204:02 pmRNSMacarthur Plans Further Exploration at Hillside
23rd Apr 202012:31 pmRNSEMH - CEZ Cinovec Investment Approved
20th Apr 20202:06 pmRNSSecond Price Monitoring Extn
20th Apr 20202:00 pmRNSPrice Monitoring Extension
17th Apr 20202:05 pmRNSSecond Price Monitoring Extn
17th Apr 20202:00 pmRNSPrice Monitoring Extension
17th Apr 202011:05 amRNSSecond Price Monitoring Extn
17th Apr 202011:00 amRNSPrice Monitoring Extension
14th Apr 202010:29 amRNSYangibana - Commonwealth Environmental Approval
14th Apr 20207:00 amRNSCourt Approval to Commence Iron Ore Shipments
27th Mar 202010:39 amRNSUpdated: EMH – CEZ to Invest in Cinovec
27th Mar 202010:13 amRNSEMH – Agreement with CEZ to Invest in Cinovec
25th Mar 20202:10 pmRNSMacarthur Minerals - JV Partner for Nickel Project
25th Mar 20207:00 amRNSMacarthur Minerals EIS Grant for Nickel Prospect
18th Mar 20204:29 pmRNSHolding(s) in Company
13th Mar 20209:36 amRNSMacarthur Minerals Lake Giles Iron Project Update
13th Mar 20207:00 amRNSPurchase of Shares by a Director
12th Mar 202011:11 amRNSUpdate on Amapa Iron Ore Project Investment
4th Mar 202012:17 pmRNSHolding(s) in Company
11th Feb 202010:11 amRNSMacarthur Minerals Encouraged by Pilbara Results
31st Jan 20202:04 pmRNSHolding(s) in Company
16th Jan 20203:35 pmRNSMacarthur Minerals Lake Giles Drilling Update
14th Jan 20205:07 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.