Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
6.25    -0.75 (-10.71%)
Bid:
6.00
Ask:
6.50
Spread: 0.50 (8.333%)
Market Cap: £25.58m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Sonora Lithium Project Update

25 Mar 2015 07:15

RNS Number : 3976I
Rare Earth Minerals PLC
25 March 2015
 

25 March 2015

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Sonora Lithium Project Update

Rare Earth Minerals Plc (AIM: REM) is pleased to announce the initial results from the successful drilling campaign on La Ventana, and the intersection of a new lithium target on El Sauz / Fleur.

The programme on La Ventana was primarily in-fill drilling which will be utilised to increase confidence in the current mineral resources. In addition a hole drilled to identify possible resource expansion targets to the west of the current delineated ore bodies on Ventana and El Sauz / Fleur, successfully intersected at shallow depth two clay beds of 7.8 metres and 38.7 metres respectively.

Good progress is also being made on the process design work, in particular Hatch Pty Ltd, along with other key consultants have been working with Bacanora Minerals Ltd ("Bacanora") to work on plant design, process optimisation and equipment sizing for commercial scale plant and equipment.

The full Bacanora news release is available at http://www.bacanoraminerals.com/

 

David Lenigas, The Company's Chairman, commented;

"The intersection of what appears to be a repeat structure to the immediate west of the already defined 3.28 million tonnes of indicated mineral resource, is further excellent news for the possible expansion of the mineral resource at Sonora Lithium Project."

 

"This progress along with the advancement of the design of a commercial lithium compound production plant should mean that not only should we see increasing certainty around the potential production of lithium compounds from the Sonora Project, but also an expanding resource to meet the forecasted demand curve in the coming years."

 

Exploration and Resource Development:

La Ventana concession:

· 2,100 metres have been drilled in 14 in-fill holes on La Ventana, a further nine holes remain to be drilled in the ongoing programme.

· Intercepts of the Upper Clay range from 26.1 to 50.8 metres in length and those for the Lower Clay range from 12.98 to 22.5 metres on La Ventana.

· Analyses received for the first three holes indicate that weighted averages for lithium content in the Upper Clay Unit varies from 955 ppm over 41.6 metres (hole LV-19) to 2,264 ppm Li over 7.75 metres (hole LV-21); for the Lower Clay Unit lithium content varies from 1,618 ppm over 23.84 metres to 2,649 ppm over 12.80 metres. Individual 1.5 metre long samples of clay range up to 5,130 ppm Li.

El Sauz and Fleur concessions:

· Drill hole ES-42, a hole that was sited to target further possible expansion in mineral resources, intersected 7.8 metres of the Upper Clay Unit at a depth of 16 metres below surface and 23.0 metres of the Lower Clay Unit at 38.7 metres below the surface.

· The intercepts from hole ES-42, represents an additional mineral resource target area, which is intended to be pursued through further drilling.

· The proximity of this new discovery to the current mineral resource on La Ventana and El Sauz and Fleur, may allow it to be included as part of the mine planning and mine design work currently being carried out.

 

Lithium Plant and Process Design Work:

· Hatch Pty Ltd. ("Hatch"), Bacanora' s engineering consultant, have completed their initial work and provided Bacanora with several optimisation and process engineering recommendations for the production of Lithium Carbonate and Lithium Hydroxide.

· Process Engineering, LLC, of Tucson, Arizona, in association with Ernest Burga, a lithium process engineer, is continuing work on plant design, scale-up and process certification;

· Sonora Resources, LLC, of Yuma, Arizona, a private engineering consultancy, has been contracted to provide the pre-feasibility study for the proposed lithium mining and lithium carbonate production facility;

· Ore-to-product metallurgical test work continues on one tonne bulk ore samples taken from surface exposures on the Sonora Lithium Project. This test work is part of the optimization work on lithium carbonate recovery and is required to provide design criteria for full size plant and equipment. Process optimisation studies at the Company's pilot plant in Hermosillo have been aided by the addition of a gas-fired rotary calcining unit for roasting lithium-bearing samples as well as resin columns in the lithium carbonate recovery circuit.

 

Details of REM's ownership:

REM owns 15.02% of Bacanora. This interest, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of 40.51%.

 

- Ends -

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting +44 (0) 207 929 5599

David Bick

Mark Longson

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUPGWUPAUMA
Date   Source Headline
21st Jan 201510:14 amRNSYangibana Update
15th Jan 20155:54 pmRNSResult of Placing of Ordinary Shares
15th Jan 20154:30 pmRNSProposed placing to raise up to £2.5 million
15th Jan 20157:00 amRNSSonora Lithium Project expanded
7th Jan 20157:00 amRNSWestern Lithium Ships First Organoclay Order
22nd Dec 20147:00 amRNSScoping Study
19th Dec 20149:55 amRNSStatement re: Press Speculation
18th Dec 20142:48 pmRNSHolding(s) in Company
17th Dec 201410:10 amRNSREM completes £7m funding
10th Dec 20147:29 amRNSUpdate - Yangibana Rare Earths Element Project
3rd Dec 20148:24 amRNSYangibana Mining Scoping Study
28th Nov 20148:26 amRNSResults of Metallurgical Testing from Yangibana
12th Nov 20147:00 amRNSAppointment of SRK & Increased Bacanora Holding
11th Nov 201410:58 amRNS230% Increase in JORC Resources at Yangibana
10th Nov 20147:00 amRNSYangibana Update
4th Nov 20147:00 amRNSDrilling Re-Commences at Sonora Lithium Project
22nd Oct 20147:00 amRNSHatch appointed for the Sonora Lithium Project
15th Oct 20147:00 amRNSUpdate on Magdalena Borate Project
13th Oct 20147:00 amRNSNew Discovery of REE on Greenland Licences
1st Oct 20147:00 amRNSExpansion Plans for the Sonora Lithium Project
30th Sep 20142:46 pmRNSWestern Lithium Signs Distribution Agreement
25th Sep 20141:08 pmRNSREM increases strategic holding in Bacanora
24th Sep 20142:54 pmRNSPositive results from Greenland regional sampling
23rd Sep 20147:00 amRNSIncrease in strategic holding in Nevada Lithium Co
11th Sep 20144:33 pmRNSEstablishment of Share Incentive Plan and EBT
11th Sep 20147:00 amRNSREM's CEO appointed to the board of Bacanora
9th Sep 20147:00 amRNSWestern Lithium - Update
27th Aug 20147:00 amRNSInterim Results
26th Aug 20147:00 amRNSYangibana Update
21st Aug 20147:00 amRNSSonora Lithium Project Update
19th Aug 20147:00 amRNSMegalit Lithium Joint Venture
5th Aug 20147:29 amRNSYangibana Update - Maiden JORC resource
4th Aug 20147:00 amRNSYangibana Update - Maiden JORC resource expected
4th Aug 20147:00 amRNSInitial TREO results from Greenland
1st Aug 20147:00 amRNSREM increases strategic holding in Bacanora
28th Jul 20147:00 amRNSREM reports holding in Bacanora Minerals at 11.68%
15th Jul 20147:00 amRNSREM increases strategic holding in Bacanora
15th Jul 20147:00 amRNSUpdate - Yangibana Rare Earth Prospect
11th Jul 20141:06 pmRNSUpdate re. Bacanora Minerals
4th Jul 20147:00 amRNSREM increases strategic holding in Bacanora
27th Jun 20148:02 amRNSBacanora - conditional approval of offering
26th Jun 201410:07 amRNSBacanora announces terms of equity offering
25th Jun 20149:14 amRNSSonora Lithium Project - NI43-101 Technical Report
25th Jun 20147:00 amRNSUpdate - El Sauz Fleur Lithium Property, Mexico
17th Jun 201410:21 amRNSDrilling Update on Yangibana Rare Earth Prospect
13th Jun 20143:32 pmRNSIssue of Debt
6th Jun 20147:24 amRNSREM increases strategic holding in Bacanora
4th Jun 20147:01 amRNSLithium Resource Increase and Upgrade
30th May 20147:00 amRNSUpdate on Greenland Exploration
28th May 20147:42 amRNSUpdate on Yangibana Rare Earth Prospect

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.