Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
6.50    0.00 (0.00%)
Bid:
6.00
Ask:
7.00
Spread: 1.00 (16.667%)
Market Cap: £26.60m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Sonora Lithium Project Update

25 Mar 2015 07:15

RNS Number : 3976I
Rare Earth Minerals PLC
25 March 2015
 

25 March 2015

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Sonora Lithium Project Update

Rare Earth Minerals Plc (AIM: REM) is pleased to announce the initial results from the successful drilling campaign on La Ventana, and the intersection of a new lithium target on El Sauz / Fleur.

The programme on La Ventana was primarily in-fill drilling which will be utilised to increase confidence in the current mineral resources. In addition a hole drilled to identify possible resource expansion targets to the west of the current delineated ore bodies on Ventana and El Sauz / Fleur, successfully intersected at shallow depth two clay beds of 7.8 metres and 38.7 metres respectively.

Good progress is also being made on the process design work, in particular Hatch Pty Ltd, along with other key consultants have been working with Bacanora Minerals Ltd ("Bacanora") to work on plant design, process optimisation and equipment sizing for commercial scale plant and equipment.

The full Bacanora news release is available at http://www.bacanoraminerals.com/

 

David Lenigas, The Company's Chairman, commented;

"The intersection of what appears to be a repeat structure to the immediate west of the already defined 3.28 million tonnes of indicated mineral resource, is further excellent news for the possible expansion of the mineral resource at Sonora Lithium Project."

 

"This progress along with the advancement of the design of a commercial lithium compound production plant should mean that not only should we see increasing certainty around the potential production of lithium compounds from the Sonora Project, but also an expanding resource to meet the forecasted demand curve in the coming years."

 

Exploration and Resource Development:

La Ventana concession:

· 2,100 metres have been drilled in 14 in-fill holes on La Ventana, a further nine holes remain to be drilled in the ongoing programme.

· Intercepts of the Upper Clay range from 26.1 to 50.8 metres in length and those for the Lower Clay range from 12.98 to 22.5 metres on La Ventana.

· Analyses received for the first three holes indicate that weighted averages for lithium content in the Upper Clay Unit varies from 955 ppm over 41.6 metres (hole LV-19) to 2,264 ppm Li over 7.75 metres (hole LV-21); for the Lower Clay Unit lithium content varies from 1,618 ppm over 23.84 metres to 2,649 ppm over 12.80 metres. Individual 1.5 metre long samples of clay range up to 5,130 ppm Li.

El Sauz and Fleur concessions:

· Drill hole ES-42, a hole that was sited to target further possible expansion in mineral resources, intersected 7.8 metres of the Upper Clay Unit at a depth of 16 metres below surface and 23.0 metres of the Lower Clay Unit at 38.7 metres below the surface.

· The intercepts from hole ES-42, represents an additional mineral resource target area, which is intended to be pursued through further drilling.

· The proximity of this new discovery to the current mineral resource on La Ventana and El Sauz and Fleur, may allow it to be included as part of the mine planning and mine design work currently being carried out.

 

Lithium Plant and Process Design Work:

· Hatch Pty Ltd. ("Hatch"), Bacanora' s engineering consultant, have completed their initial work and provided Bacanora with several optimisation and process engineering recommendations for the production of Lithium Carbonate and Lithium Hydroxide.

· Process Engineering, LLC, of Tucson, Arizona, in association with Ernest Burga, a lithium process engineer, is continuing work on plant design, scale-up and process certification;

· Sonora Resources, LLC, of Yuma, Arizona, a private engineering consultancy, has been contracted to provide the pre-feasibility study for the proposed lithium mining and lithium carbonate production facility;

· Ore-to-product metallurgical test work continues on one tonne bulk ore samples taken from surface exposures on the Sonora Lithium Project. This test work is part of the optimization work on lithium carbonate recovery and is required to provide design criteria for full size plant and equipment. Process optimisation studies at the Company's pilot plant in Hermosillo have been aided by the addition of a gas-fired rotary calcining unit for roasting lithium-bearing samples as well as resin columns in the lithium carbonate recovery circuit.

 

Details of REM's ownership:

REM owns 15.02% of Bacanora. This interest, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of 40.51%.

 

- Ends -

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting +44 (0) 207 929 5599

David Bick

Mark Longson

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUPGWUPAUMA
Date   Source Headline
19th Oct 20171:10 pmRNSMacarthur Minerals Update
13th Oct 20172:27 pmRNSUpdate - Macarthur Minerals
12th Oct 20171:59 pmRNSUpdate - Macarthur Minerals
4th Oct 20173:57 pmRNSUpdate - Macarthur Minerals
4th Oct 20171:19 pmRNSUpdate - Auroch Minerals
3rd Oct 201711:33 amRNSUpdate - European Metals Holdings
29th Sep 20177:00 amRNSInterim Results
28th Sep 20172:18 pmRNSUpdate - Macarthur Minerals
18th Sep 201712:35 pmRNSUpdate - Auroch Minerals
13th Sep 20179:27 amRNSYangibana - Update
12th Sep 20172:59 pmRNSMacarthur Minerals - Update
12th Sep 201710:01 amRNSUpdate - Auroch Minerals
8th Sep 20174:53 pmRNSHolding(s) in Company
7th Sep 20171:28 pmRNSPartial sale of stake in Bacanora Minerals
5th Sep 20179:46 amRNSUpdate - Clancy Exploration
4th Sep 20179:49 amRNSUpdate - Auroch Minerals
1st Sep 201710:24 amRNSYangibana Update
31st Aug 20174:36 pmRNSUpdate - Macarthur Minerals
29th Aug 20175:07 pmRNSUpdate - Macarthur Minerals
29th Aug 20174:03 pmRNSResult of AGM
24th Aug 20179:22 amRNSUpdate - Bacanora Minerals
24th Aug 20179:05 amRNSUpdate - Auroch Minerals
21st Aug 20171:31 pmRNSMacarthur Minerals Update
21st Aug 20179:22 amRNSUpdate - Yangibana
21st Aug 20179:07 amRNSCleansing Statement
16th Aug 201710:53 amRNSEMH - Drill Results, Appointment and Equity Issue
15th Aug 201711:55 amRNSUpdate - Auroch Minerals
14th Aug 20171:29 pmRNSUpdate - Macarthur Minerals
14th Aug 201710:36 amRNSUpdate - Auroch Minerals
10th Aug 20179:02 amRNSUpdate - Auroch Minerals
7th Aug 201711:44 amRNSNotice of AGM
1st Aug 20178:40 amRNSYangibana Update
25th Jul 20171:40 pmRNSMacarthur Minerals Update
11th Jul 20171:39 pmRNSMacarthur Minerals Update
4th Jul 20171:32 pmRNSCinovec Maiden Ore Reserve - Further Information
3rd Jul 201710:00 amRNSAuroch Minerals Update
3rd Jul 20178:58 amRNSAustrian Cobalt Project - Update
27th Jun 201712:23 pmRNSInfill Drilling Commenced at Cinovec Project
21st Jun 201711:45 amRNSYangibana Update
19th Jun 20179:15 amRNSLive Webinar
19th Jun 20177:00 amRNSLive Webinar
15th Jun 20172:19 pmRNSMacarthur Minerals Update
15th Jun 20178:00 amRNSInvestment in Austrian Leogang Project
6th Jun 20172:06 pmRNSMacarthur Minerals Update
5th Jun 20179:12 amRNSHolding(s) in Company
1st Jun 20171:48 pmRNSMacarthur Minerals Update
31st May 20177:00 amRNSResults for the year ended 31 December 2016
25th May 20179:23 amRNSUpdate on Cinovec Lithium/Tin Project
23rd May 20172:29 pmRNSMacarthur Minerals Update
22nd May 20179:22 amRNSYangibana Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.