Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.65    0.40 (5.52%)
Bid:
7.30
Ask:
8.00
Spread: 0.70 (9.589%)
Market Cap: £31.31m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Macarthur Minerals Update

23 May 2017 14:29

RNS Number : 9940F
Cadence Minerals PLC
23 May 2017
 



Cadence Minerals Plc

 

("Cadence Minerals" or "Cadence")

 

MACARTHUR MINERALS UPDATE

 

Cadence Minerals Plc (AIM/NEX: KDNC; OTC: KDNCY) is pleased to report that Macarthur Minerals ("Macarthur" or the "Company") in which Cadence currently owns a 20.37% shareholding, has announced that it has conducted an extensive near surface geochemical sediment sampling program at the Company's Stonewall Lithium Project ("Stonewall Project"), located in Lida Valley, Nevada. The Lida Valley is the basin adjacent to the Clayton Valley, which hosts North America's only producing lithium mine, Albemarle's Silver Peak Lithium Mine. All 380 samples contained lithium with sediment assays ranging from 14.6 parts per million ("ppm") lithium ("Li") and up to 187 ppm Li, with 19 samples over 100 ppm. This sampling program confirms last year's first pass sediment sampling program, that anomalous concentrations of lithium are present in the playa surface sediments of Lida Valley.

 

The full Macarthur announcement can be found at: https://web.tmxmoney.com/article.php?newsid=6684263957909321&qm_symbol=MMS

 

Results of Extensive Sampling Program

A United States mineral exploration company performed the extensive lithium sampling program for the Stonewall Project. The sampling program on the Stonewall Project for the purposes of collecting sediment samples for lithium was conducted during late April 2017.

The sampling program returned 380 sediment samples collected from depths of ~ 1.5 ft. (~ 45 cm) with grades ranging from 14.6 to 187 ppm Li. Samples were collected from a grid pattern on the playa (dry lake bed) surface, with a sample spacing of 200 meters (656 ft.) and from N - S oriented lines with a spacing of 500 meters (1640 ft.) between sampling lines (refer to Figure 1). All holes contained lithium with sediment assays ranging from 14.6 ppm Li and up to 187 ppm Li.

The highest value analytical results were from sample '21-3' at 187 ppm Li and from sample '12-16' at 159.5 ppm Li. The sediment samples were taken under chain of custody to the ALS Chemex lab in Reno, Nevada. The samples were analysed for 51 individual elements by Method ME - MS 41, which is an ultra trace level analysis using Inductively Coupled Plasma - Mass Spectrometry (ICP - MS) methods, with an Aqua Regia digestion. Figure 1 shows the location of the Stonewall Project claims over the majority of the playa, sample locations and lithium results.

Stonewall Project

The Stonewall Project covers an area of approximately 12,019 acres (48.64 square kilometers) and most of the playa in Nevada's Lida Valley Basin. The Lida Valley is located 32 miles (53 km) to the SE of the Clayton Valley Basin, which hosts the United States' only producing lithium mine.

The Stonewall Project is strategically located in the Nevada lithium supply hub, 306 kilometers (191 miles) southeast of Tesla's new Gigafactory, which has a planned production capacity of 35 gigawatt-hours per year by 2020[1].

The Stonewall Project is located in an intermontane basin and is surrounded by tertiary volcanic rhyolitic rock units, which are anomalously high in lithium. These rhyolitic units are thought to act as a potential source rock for lithium in the Clayton Valley brines. The potential lithium source rock includes flows and tuffs that likely extend below the alluvial cover.

There are two clusters of anomalous sediments; one in the north and one in the south of the Stonewall Project playa. The higher Li values in the sediments are proximal to fault intersections revealed by bedrock outcrop patterns. The foot prints of the anomalous sediments defined by our sampling are on the order of 1.5 km (~ 5000 ft.) long by 0.5 km (~ 1600 ft.) wide.

The fault intersections comprise the bounding structural framework of the moat sediment zone of the Stonewall Volcanic Caldera (rhyolitic - now extinct). The Company's preliminary interpretation is that leakage of Li rich geothermal solutions at these fault intersections probably enriched the moat sediments which were deposited alongside the faults when the volcano was active (~ 5 million years BP).

The Stonewall Project is located in the mining friendly Nye and Esmeralda Counties of Nevada and is serviced by excellent infrastructure with access to power, water, labour and is bisected by the Veterans Memorial Highway Number 95. The regional climate also favours natural and inexpensive evaporation for brine concentration and allows year-round work.

ASX IPO of Macarthur Australia Limited Update

The Company also provides an update that it has extended the Australian Securities Exchange ("ASX") Initial Public Offering ("IPO") of Macarthur Australia Limited ("Macarthur Australia") to issue between 25 and 50 million shares at A$0.20 to raise between A$5 - 10 million ("Offer") to close on 30 June 2017 with an expected date for quotation on 12 July 2017.

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance).

 

For further information please contact

Cadence Minerals plc

+44 (0) 207 440 0647

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Bavister

Square1 Consulting

+44 (0) 207 929 5599

David Bick

Brian Alexander

About Cadence Minerals:

Cadence is dedicated to smart investments for a greener world. The planet needs rechargeable batteries on a global scale - upcoming supersized passenger vehicles, lorries and buses - require lithium and other technology minerals to power their cells. Cadence is helping find these minerals in new places and extracting them in new ways, which will meet the demand of this burgeoning market. With over £40 million vested in key assets globally, Cadence is helping us reach tomorrow, today.

Cadence invests across the globe, principally in lithium mining projects. Its primary strategy is taking significant economic stakes in upstream exploration and development assets within strategic metals. We identify assets that have strategic cost advantages that are not replicable, with the aim of achieving lower quartile production costs. The combination of this approach and seeking value opportunities allows us to identify projects capable of achieving high rates of return.

The Cadence board has a blend of mining, commodity investing, fund management and deal structuring knowledge and experience, that is supported by access to key marketing, political and industry contacts. These resources are leveraged not only in our investment decisions but also in continuing support of our investments, whether it be increasing market awareness of an asset, or advising on product mix or path to production. Cadence Mineral's goal is to assist management to rapidly develop the project up the value curve and deliver excellent returns on its investments.

.


[1] https://www.tesla.com/sites/default/files/blog_attachments/gigafactory.pdf

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCXXLFLDEFLBBF
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.