Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.40    -0.25 (-3.27%)
Bid:
7.10
Ask:
7.70
Spread: 0.60 (8.451%)
Market Cap: £30.28m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Macarthur Minerals Update

15 Jun 2017 14:19

RNS Number : 2268I
Cadence Minerals PLC
15 June 2017
 

Cadence Minerals Plc

 

("Cadence Minerals" or "Cadence")

 

Macarthur Minerals Update

 

Cadence Minerals Plc (AIM/NEX: KDNC; OTC: KDNCY) is pleased to report that Macarthur Minerals ("Macarthur" or the "Company") in which Cadence currently owns a 20.3% shareholding, has announced that it has expanded its lithium brine project portfolio, staking the Reynolds Springs Lithium Brine Project in Nevada on which it has located lithium at surface of up to 300 parts per million ("ppm") lithium ("Li").

The full Macarthur announcement can be found at: https://web.tmxmoney.com/article.php?newsid=8088271344476834&qm_symbol=MMS .

The Company has staked 210 new unpatented placer mining claims at its new Reynolds Springs Lithium Brine Project ("Reynolds Springs Project") in the Railroad Valley, Nevada. Three surface samples at the Reynolds Springs Project returned 260 to 300 ppm Li.

 

Reynolds Springs Project - Geological Setting

The new claims are located near the town of Currant, in Nye County, Nevada. The Reynolds Springs Project is located approximately 180 miles (300 km) North of Las Vegas, Nevada, and 330 miles (531 km) South East of Tesla's new Gigafactory.

Railroad Valley is a large topographically closed playa (dry Salt Lake bed) basin located in East-central Nevada. The basin is fault bounded with numerous active thermal springs (anomalous in lithium) emerging along the faults. The fault sets have strike lengths of 25 - 30 miles (42 - 50 km) and are parallel to each other, about 8-12 miles apart. The faults that bound the basin form an elongate rectangular shaped basin of about 300 square miles (830 square km) in size.

Numerous thermal springs emerge along the basin bounding fault systems which form the North-West and South-East flanks of the playa basin. Thermal waters which discharge from the springs carry moderately anomalous values of Lithium. Water samples collected from Reynolds Springs by Macarthur Minerals' consulting geologists averaged 230 parts per billion ("ppb") Li and 445 ppb boron. This about twice the concentration for these elements detected from water samples collected at other springs that were sampled in the valley.

The mountains that surround the basin contain outcropping rock units are also anomalous in lithium. This closely matches the geologic criteria for the United State Geological Survey ("USGS") deposit model for Clayton Valley type lithium brine deposits. Macarthur Minerals believes that the combination of anomalous lithium in soils (+250 ppm) and anomalous lithium in thermal spring waters (230 ppb Li) indicates that the Reynolds Springs Project area is favorable for further exploration.

 

Historical Data

Prior to staking the claims, Macarthur Minerals completed an analysis of USGS historical soil, rock and groundwater data collected across California, Nevada and Utah. Sediment samples collected in the 1980s, during the United States Department of Energy's National Uranium Resource Evaluation Program ("NURE") were of particular interest. Spatial analysis of the historical data shows Railroad Valley to be the largest lithium soil anomaly in the State of Nevada. A total of 19,165 soils samples were collected by NURE across Nevada and analysed for Uranium, Lithium and other elements. Eighty-seven (87) samples returned lithium values in excess of 100 ppm. A cluster of 20 samples greater than 100 ppm were collected from Railroad Valley.

The other area identified from the NURE dataset that had similar elevated lithium levels was the Clayton Valley which hosts North America's only producing lithium mine, Albemarle's Silver Peak Lithium Mine. In comparison, approximately 108 samples were collected from the Clayton Valley and surrounding the Silver Peak mine. A total of nine samples reported assays greater than 100 ppm with samples ranging from 102 to 431 ppm Li.

 

Reconnaissance soil sampling in the Railroad Valley by Macarthur Minerals' consulting geologists narrowed the area of interest to the Reynolds Springs area on the North-West flank of the playa basin. A total of five widely spaced reconnaissance soil samples were collected from the Reynolds Springs area. Analysis of these samples by ALS Chemex Labs using the ME - ICP41 and ICP61 methods returned a range of values for the five samples ranging from 80 - 350 ppm Li (average 256 ppm Li) and a range of 20 - 720 ppm B (average 342 ppm Boron).

The water and soil sample results mentioned above were compared to results from other reconnaissance samples collected elsewhere in the Railroad Valley. This demonstrated that the Reynolds Springs area appeared to be enriched in lithium. As a result of that analysis, a total of 210 new 20-acre unpatented placer mining claims were staked as indicated in Figure 1.

 

Next Steps for the Reynolds Springs Project

The Company has recently completed a 210 point geochemical soils sampling program across the Reynolds Springs Project (concurrent with the claim staking). Samples have been submitted to the laboratory for assay and will be reported when data is available. Following analysis of this wide spaced sampling program, the Company will consider an infill sampling program across areas considered highly prospective for lithium.

Macarthur Minerals is also currently undertaking a review of hyperspectral ASTER satellite imagery of Railroad Valley to identify additional prospective areas.

The Reynolds Spring Project is located only 110 miles (183kms) from the Company's Stonewall Project in the Lida Valley, Nevada. The close location of the Reynolds Springs Project and Stonewall Project will allow sharing of resources and expertise for exploration of both projects. The Company is considering entering into joint ventures to assist in the exploration of both projects.

 

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance).

For further information please contact

Cadence Minerals plc

+44 (0) 207 440 0647

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Bavister

Square1 Consulting

+44 (0) 207 929 5599

David Bick

Brian Alexander

About Cadence Minerals:

Cadence is dedicated to smart investments for a greener world. The planet needs rechargeable batteries on a global scale - upcoming supersized passenger vehicles, lorries and buses - require lithium and other technology minerals to power their cells. Cadence is helping find these minerals in new places and extracting them in new ways, which will meet the demand of this burgeoning market. With over £40 million vested in key assets globally, Cadence is helping us reach tomorrow, today.

Cadence invests across the globe, principally in lithium mining projects. Its primary strategy is taking significant economic stakes in upstream exploration and development assets within strategic metals. We identify assets that have strategic cost advantages that are not replicable, with the aim of achieving lower quartile production costs. The combination of this approach and seeking value opportunities allows us to identify projects capable of achieving high rates of return.

The Cadence board has a blend of mining, commodity investing, fund management and deal structuring knowledge and experience, that is supported by access to key marketing, political and industry contacts. These resources are leveraged not only in our investment decisions but also in continuing support of our investments, whether it be increasing market awareness of an asset, or advising on product mix or path to production. Cadence Mineral's goal is to assist management to rapidly develop the project up the value curve and deliver excellent returns on its investments.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCXELFFDQFFBBE
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.