Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.00    0.00 (0.00%)
Bid:
6.50
Ask:
7.50
Spread: 1.00 (15.385%)
Market Cap: £28.65m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Macarthur Minerals Update

15 Jun 2017 14:19

RNS Number : 2268I
Cadence Minerals PLC
15 June 2017
 

Cadence Minerals Plc

 

("Cadence Minerals" or "Cadence")

 

Macarthur Minerals Update

 

Cadence Minerals Plc (AIM/NEX: KDNC; OTC: KDNCY) is pleased to report that Macarthur Minerals ("Macarthur" or the "Company") in which Cadence currently owns a 20.3% shareholding, has announced that it has expanded its lithium brine project portfolio, staking the Reynolds Springs Lithium Brine Project in Nevada on which it has located lithium at surface of up to 300 parts per million ("ppm") lithium ("Li").

The full Macarthur announcement can be found at: https://web.tmxmoney.com/article.php?newsid=8088271344476834&qm_symbol=MMS .

The Company has staked 210 new unpatented placer mining claims at its new Reynolds Springs Lithium Brine Project ("Reynolds Springs Project") in the Railroad Valley, Nevada. Three surface samples at the Reynolds Springs Project returned 260 to 300 ppm Li.

 

Reynolds Springs Project - Geological Setting

The new claims are located near the town of Currant, in Nye County, Nevada. The Reynolds Springs Project is located approximately 180 miles (300 km) North of Las Vegas, Nevada, and 330 miles (531 km) South East of Tesla's new Gigafactory.

Railroad Valley is a large topographically closed playa (dry Salt Lake bed) basin located in East-central Nevada. The basin is fault bounded with numerous active thermal springs (anomalous in lithium) emerging along the faults. The fault sets have strike lengths of 25 - 30 miles (42 - 50 km) and are parallel to each other, about 8-12 miles apart. The faults that bound the basin form an elongate rectangular shaped basin of about 300 square miles (830 square km) in size.

Numerous thermal springs emerge along the basin bounding fault systems which form the North-West and South-East flanks of the playa basin. Thermal waters which discharge from the springs carry moderately anomalous values of Lithium. Water samples collected from Reynolds Springs by Macarthur Minerals' consulting geologists averaged 230 parts per billion ("ppb") Li and 445 ppb boron. This about twice the concentration for these elements detected from water samples collected at other springs that were sampled in the valley.

The mountains that surround the basin contain outcropping rock units are also anomalous in lithium. This closely matches the geologic criteria for the United State Geological Survey ("USGS") deposit model for Clayton Valley type lithium brine deposits. Macarthur Minerals believes that the combination of anomalous lithium in soils (+250 ppm) and anomalous lithium in thermal spring waters (230 ppb Li) indicates that the Reynolds Springs Project area is favorable for further exploration.

 

Historical Data

Prior to staking the claims, Macarthur Minerals completed an analysis of USGS historical soil, rock and groundwater data collected across California, Nevada and Utah. Sediment samples collected in the 1980s, during the United States Department of Energy's National Uranium Resource Evaluation Program ("NURE") were of particular interest. Spatial analysis of the historical data shows Railroad Valley to be the largest lithium soil anomaly in the State of Nevada. A total of 19,165 soils samples were collected by NURE across Nevada and analysed for Uranium, Lithium and other elements. Eighty-seven (87) samples returned lithium values in excess of 100 ppm. A cluster of 20 samples greater than 100 ppm were collected from Railroad Valley.

The other area identified from the NURE dataset that had similar elevated lithium levels was the Clayton Valley which hosts North America's only producing lithium mine, Albemarle's Silver Peak Lithium Mine. In comparison, approximately 108 samples were collected from the Clayton Valley and surrounding the Silver Peak mine. A total of nine samples reported assays greater than 100 ppm with samples ranging from 102 to 431 ppm Li.

 

Reconnaissance soil sampling in the Railroad Valley by Macarthur Minerals' consulting geologists narrowed the area of interest to the Reynolds Springs area on the North-West flank of the playa basin. A total of five widely spaced reconnaissance soil samples were collected from the Reynolds Springs area. Analysis of these samples by ALS Chemex Labs using the ME - ICP41 and ICP61 methods returned a range of values for the five samples ranging from 80 - 350 ppm Li (average 256 ppm Li) and a range of 20 - 720 ppm B (average 342 ppm Boron).

The water and soil sample results mentioned above were compared to results from other reconnaissance samples collected elsewhere in the Railroad Valley. This demonstrated that the Reynolds Springs area appeared to be enriched in lithium. As a result of that analysis, a total of 210 new 20-acre unpatented placer mining claims were staked as indicated in Figure 1.

 

Next Steps for the Reynolds Springs Project

The Company has recently completed a 210 point geochemical soils sampling program across the Reynolds Springs Project (concurrent with the claim staking). Samples have been submitted to the laboratory for assay and will be reported when data is available. Following analysis of this wide spaced sampling program, the Company will consider an infill sampling program across areas considered highly prospective for lithium.

Macarthur Minerals is also currently undertaking a review of hyperspectral ASTER satellite imagery of Railroad Valley to identify additional prospective areas.

The Reynolds Spring Project is located only 110 miles (183kms) from the Company's Stonewall Project in the Lida Valley, Nevada. The close location of the Reynolds Springs Project and Stonewall Project will allow sharing of resources and expertise for exploration of both projects. The Company is considering entering into joint ventures to assist in the exploration of both projects.

 

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance).

For further information please contact

Cadence Minerals plc

+44 (0) 207 440 0647

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Bavister

Square1 Consulting

+44 (0) 207 929 5599

David Bick

Brian Alexander

About Cadence Minerals:

Cadence is dedicated to smart investments for a greener world. The planet needs rechargeable batteries on a global scale - upcoming supersized passenger vehicles, lorries and buses - require lithium and other technology minerals to power their cells. Cadence is helping find these minerals in new places and extracting them in new ways, which will meet the demand of this burgeoning market. With over £40 million vested in key assets globally, Cadence is helping us reach tomorrow, today.

Cadence invests across the globe, principally in lithium mining projects. Its primary strategy is taking significant economic stakes in upstream exploration and development assets within strategic metals. We identify assets that have strategic cost advantages that are not replicable, with the aim of achieving lower quartile production costs. The combination of this approach and seeking value opportunities allows us to identify projects capable of achieving high rates of return.

The Cadence board has a blend of mining, commodity investing, fund management and deal structuring knowledge and experience, that is supported by access to key marketing, political and industry contacts. These resources are leveraged not only in our investment decisions but also in continuing support of our investments, whether it be increasing market awareness of an asset, or advising on product mix or path to production. Cadence Mineral's goal is to assist management to rapidly develop the project up the value curve and deliver excellent returns on its investments.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCXELFFDQFFBBE
Date   Source Headline
28th Jul 20208:54 amRNSEMH - European Body Partnership Agreement
15th Jul 20203:22 pmRNSMacarthur Minerals - Arc Track Access Agreement
14th Jul 20209:42 amRNSEMH DGWA Appointment & Proposed Czech Listing
7th Jul 20201:33 pmRNSAmapá Project Update
1st Jul 20209:25 amRNSYangibana Finnvera Project Financing
26th Jun 20203:23 pmRNSMacarthur Minerals - Lake Giles Developments
26th Jun 20207:00 amRNSResults for the Year Ended 31 December 2019
18th Jun 20209:32 amRNSMajor Drilling Programme Commences at Yangibana
17th Jun 202010:58 amRNSYangibana Works Construction Permit Granted
16th Jun 20207:00 amRNSAmapá Operational Update
8th Jun 20207:00 amRNSAmapá Operational Update,Placing to Raise £650,000
5th Jun 20205:44 pmRNSLoan Note Conversion
5th Jun 202011:05 amRNSSecond Price Monitoring Extn
5th Jun 202011:00 amRNSPrice Monitoring Extension
5th Jun 202010:03 amRNSAmended: Macarthur JV Partner Completes Royalty Sa
5th Jun 20207:00 amRNSMacarthur JV Partner Completes Royalty Sale
3rd Jun 20202:06 pmRNSSecond Price Monitoring Extn
3rd Jun 20202:01 pmRNSPrice Monitoring Extension
3rd Jun 20209:31 amRNSYangibana JV Partner Agreement with Schaeffler
2nd Jun 20203:47 pmRNSHolding(s) in Company
28th May 20202:07 pmRNSMacarthur JV Partner - FIRB Approves Royalty Sale
28th May 202010:53 amRNSBacanora Sonora & Lithium Market Update
26th May 20203:47 pmRNSMacarthur Minerals JV Partner - $7m Royalty Sale
6th May 20201:44 pmRNSTotal Voting Rights and Capital
6th May 20207:00 amRNSMacarthur Lake Giles Assay Results Completed
1st May 20205:27 pmRNSPlacing Update
1st May 202011:16 amRNSAmapá Update, Placing and Loan Note Restructuring
30th Apr 20208:57 amRNSEuropean Metals Holdings - Cinovec PMP Granted
29th Apr 20204:02 pmRNSMacarthur Plans Further Exploration at Hillside
23rd Apr 202012:31 pmRNSEMH - CEZ Cinovec Investment Approved
20th Apr 20202:06 pmRNSSecond Price Monitoring Extn
20th Apr 20202:00 pmRNSPrice Monitoring Extension
17th Apr 20202:05 pmRNSSecond Price Monitoring Extn
17th Apr 20202:00 pmRNSPrice Monitoring Extension
17th Apr 202011:05 amRNSSecond Price Monitoring Extn
17th Apr 202011:00 amRNSPrice Monitoring Extension
14th Apr 202010:29 amRNSYangibana - Commonwealth Environmental Approval
14th Apr 20207:00 amRNSCourt Approval to Commence Iron Ore Shipments
27th Mar 202010:39 amRNSUpdated: EMH – CEZ to Invest in Cinovec
27th Mar 202010:13 amRNSEMH – Agreement with CEZ to Invest in Cinovec
25th Mar 20202:10 pmRNSMacarthur Minerals - JV Partner for Nickel Project
25th Mar 20207:00 amRNSMacarthur Minerals EIS Grant for Nickel Prospect
18th Mar 20204:29 pmRNSHolding(s) in Company
13th Mar 20209:36 amRNSMacarthur Minerals Lake Giles Iron Project Update
13th Mar 20207:00 amRNSPurchase of Shares by a Director
12th Mar 202011:11 amRNSUpdate on Amapa Iron Ore Project Investment
4th Mar 202012:17 pmRNSHolding(s) in Company
11th Feb 202010:11 amRNSMacarthur Minerals Encouraged by Pilbara Results
31st Jan 20202:04 pmRNSHolding(s) in Company
16th Jan 20203:35 pmRNSMacarthur Minerals Lake Giles Drilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.