Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.10
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.20 (5.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 4.10
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Field Work Commences on the Bacanora

25 Mar 2013 07:00

RNS Number : 7161A
Rare Earth Minerals PLC
25 March 2013
 



25 mARCH 2013

Rare Earth minerals plc

("Rare Earth Minerals" or "the Company")

 

Field Work Commences on the Bacanora - Rare Earth Minerals Lithium Joint Venture Property, Mexico

 

Rare Earth Minerals PLC (AIM: REM) is pleased to announce that the Field Work programme has commenced on the El Sauz and Fleur lithium concessions ('the Concessions') that form part of the Sonora Lithium Project in northern Mexico. The Company will earn an initial interest of 10% in the Concessions with an option to earn up to 49.9% interest in the Concessions from Bacanora Minerals Ltd as announced on 14 February 2013.

Listed below are the field work activities planned at the Sonora Lithium Project.

Field Work Programme

·; First phase of exploration funded by the Company consists of geological mapping and surface rock sampling at the El Sauz concession.

·; Previous sampling by Bacanora located lithium-bearing clay units that averaged 5,537 ppm Li (2.9% LCE*) over a true thickness of 4.5 metre sampled interval at one location on El Sauz.

·; Object of the current programme is to fully delineate extent of lithium-bearing sediments and determine lithium contents of exposed clay units.

·; An estimated 230 samples will be collected; the programme is scheduled to be completed by end of March, with analytical results to follow in early April.

·; Results will be used to plan an extensive diamond drilling programme to test down dip potential of lithium surface showings.

·; Drilling is expected to commence in late April or early May in conjunction with geological mapping and rock sampling at the adjacent Fleur concession.

 

About the Sonora Lithium Project:

The Concessions cover 3,411 hectares out of a total of 5,786 contiguous hectares that make up the Sonora Lithium Project owned by Bacanora.

Initial rock sampling and mapping of the Project by Bacanora located the lithium-bearing clay units. Drilling by Bacanora in 2010 and 2011 located two lithium-bearing clay units (upper and lower) that average 41 and 22 m in thickness, respectively, and that are separated by an ignimbrite unit varying from 1 to 45 m in thickness. The sedimentary-volcanic sequence dips at approximately 20o to the east and crops out along 3.5 km of strike length. The exposures are in erosional windows looking through overlying basalt that covers much of the area. The lithium-bearing clay minerals have been identified as hectorite and polylithionite.

The Concessions border the La Ventana concession that is 100% owned by Bacanora in which Rare Earth Minerals has no interest.. NI 43-101 compliant inferred resources have been estimated for two clay units (referred to as the "La Ventana Lithium Deposit") on the La Ventana concession. The inferred resources for the two clay units total 60 million tonnes averaging 3,000 ppm Li (equivalent to 1.6% lithium carbonate assuming 100% recovery and no process losses). Bacanora has used the inferred resources on La Ventana for a Preliminary Economic Assessment ("PEA") of the La Ventana concession (refer to Bacanora news release dated January 25, 2013). Highlights of the PEA for a potential lithium mining and production operation with an output of 35,000 tonnes battery grade lithium carbonate per annum over a 20 year open pit mine life suggest annual revenue of $US210 million for an Internal Rate of Return ("IRR") of 138%, with a 1.9 year pay back. Capital costs are estimated at $US114 million and average operating costs at $US1,958/tonne. Net present value ("NPV") of the Project, discounted at 8%, is $US848 million, assuming an average lithium carbonate price of $US6,000/tonne.

 

David Lenigas, Rare Earth Minerals Chairman commented:

 

"The Company is very pleased to be starting work on this exciting project which has similar lithium values in clay units that are believed may be correlative to those found on the adjoining La Ventana concession. It is a tremendous opportunity to be able to begin exploring beside a property with reported resources. We are very optimistic that continued exploration of the Sonora Lithium Project may yield positive results on the Concessions."

 

Lithium is the lightest of the alkali metals and has unique electrochemical properties that make it the element of choice for batteries of high energy storage capacity and other energy applications as well as a host of industrial and health applications." 

____________________________

*LCE = lithium carbonate (Li2CO3)Equivalent: determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3 value in percent. Use of LCE assumes 100% recovery and no process losses in conversion of Li to Li2CO3.

 

Qualified Person's Statement:

 

Information in this announcement relates to information compiled by Carl G Verley, P.Geo, a consultant to the Company, who is a member of the Association of Professional Engineers and Geoscientists of British Columbia and is a Qualified Person with respect to the information disclosed herein.

 

For further information please contact:

 

Rare Earth Minerals Plc .

David Lenigas, Non-Executive Director

+44 (0) 207 440 0640

 

NOMAD - WH Ireland

James Joyce

+44 (0) 207 220 1666

 

PR - Pelham Bell Pottinger

Charlie Vivian

+44 (0)20 7861 3232

 

Weston Macklem

+44 (0)20 7861 3232

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDLLFLXXFXBBD
Date   Source Headline
30th May 20249:10 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
7th May 20248:24 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
18th Apr 20247:00 amRNSFurther Progress at the Amapa Iron Ore Project
11th Apr 202410:01 amRNSEuropean Metals Holdings - Cinovec Lithium Project
9th Apr 20248:59 amRNSCorporate Update - Evergreen Lithium
5th Apr 20241:23 pmRNSPlacing to raise £500,000 & Issue of Warrants
28th Mar 20249:59 amRNSUpdate on Amapá Project investment & Equity Stake
27th Mar 202410:25 amRNSEuropean Metals Holdings - Cinovec Project Update
22nd Mar 20247:00 amRNSOptimisation Study Delivers Savings at Amapá
14th Mar 20249:18 amRNSCorporate Update - Evergreen Lithium
7th Mar 20247:00 amRNSProgress at the Amapá Project & Corporate Update
29th Jan 202410:05 amRNSCorporate Update
29th Jan 20249:53 amRNSEMH - Cinovec Exploration Licenses
22nd Jan 20248:56 amRNSCorporate Update - Evergreen Lithium (ASX: EG1)
22nd Dec 20238:15 amRNSCorporate Update – European Metals Holdings
30th Nov 20239:06 amRNSCorporate Update - Evergreen Lithium
22nd Nov 202311:39 amRNSCorporate Update - Hastings Technology Metals
16th Nov 20237:00 amRNSSonora Lithium Investment Update
9th Nov 20239:12 amRNSCorporate Update - European Metals Holdings
31st Oct 20237:00 amRNSDirector Share Purchases
30th Oct 20237:00 amRNSStrategic Development and Financing
29th Sep 20239:53 amRNSInterim Results
18th Sep 20238:43 amRNSCorporate Update - Evergreen Lithium
12th Sep 20239:10 amRNSCorporate Update - Hastings Technology Metals
11th Sep 20239:44 amRNSAmapá Iron Ore Project Update
31st Aug 20237:52 amRNSSonora Lithium Investment Update
16th Aug 202311:52 amRNSResult of AGM
4th Aug 20238:55 amRNSCorporate Update - Hastings Technology Metals
25th Jul 202312:25 pmRNSNotice of AGM
21st Jul 202310:12 amRNSCorporate Update – European Metals Holdings
28th Jun 20239:11 amRNSCorporate Update - Evergreen Lithium ANT Analysis
27th Jun 20237:00 amRNSAnnual Results for the year ended 31 December 2022
13th Jun 20239:49 amRNSCorporate Update - Hastings Technology Metals
9th Jun 202311:46 amRNSUpdate EMH Land secured for Cinovec lithium plant
1st Jun 20239:01 amRNSCorporate Update - Evergreen Lithium
31st May 202312:52 pmRNSCorporate Update - Hastings Technology Metals
26th May 20232:48 pmRNSAmapa Project Update & Loan Financing
25th May 20231:43 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
25th May 20238:42 amRNSEMH Announcement: Outstanding Lithium Recoveries
10th May 202312:12 pmRNSCorporate Update - Evergreen Lithium (ASX: EG1)
3rd May 20235:17 pmRNSCorporate Update - Hastings Technology Metals
13th Apr 20238:56 amRNSNotice of Substantial Shareholder in Evergreen
1st Mar 20237:00 amRNSCorporate Update
30th Jan 202311:47 amRNSEuropean Metals Announcement: Just Transition Fund
26th Jan 20238:26 amRNSListing of Evergreen Lithium on the ASX
25th Jan 20238:35 amRNSCompletion of Sale of Yangibana JV Interest
10th Jan 20232:05 pmRNSSecond Price Monitoring Extn
10th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSDirector Share Purchases
3rd Jan 20237:00 amRNSCompletion of PFS on Amapá Iron Ore Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.