Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.35    0.05 (0.68%)
Bid:
7.00
Ask:
7.70
Spread: 0.70 (10.00%)
Market Cap: £30.08m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Update on Mexico Lithium Project

14 Aug 2013 10:51

RNS Number : 6758L
Rare Earth Minerals PLC
14 August 2013
 



 

 

14 August 2013

 

Rare Earth minerals plc

("Rare Earth Minerals", "REM" or "the Company")

 

Update on Mexico Lithium Project

 

 

Rare Earth Minerals (AIM: REM) is providing the following update on its Fleur-El Sauz Lithium Project in northern Mexico, where the drilling programme has now been completed and assay results are providing firm evidence that Fleur-El Sauz has the potential to be part of a major high grade Lithium discovery.

 

In addition to the assay results shown below, the Fleur - El Sauz deposits identified to date remain open at strike and depth.

 

Highlights:

 

· REM intersects significant lithium values in both Upper Clay and Lower Clay Units in drill hole ES-02, ES-03 & ES-04 at its Fleur - El Sauz Lithium Project.

 

· All ten planned diamond drill holes ES-01 to ES -10 have now been completed showing a 4 kilometre strike length of the high grade Lithium clay units.

 

· The combined clay units average 63.67 metres in thickness in the area drilled, with the Upper Clay Unit averaging 28.64 metres and the Lower Clay Unit averaging 34 metres.

 

· Results from all the drill holes will be reported by the end of September.

 

 

· These lithium-bearing clays also have possible applications in the petroleum industry, specifically for high temperature - high pressure ("HTHP") tolerant drilling muds.

 

 

David Lenigas, The Company's Chairman commented:

 

"REM is pleased to report that the extension of mineralisation through the Fleur - El Sauz licences has increased the potential of outlining a new and substantial lithium deposit.

 

"The total known world resource of lithium metal is estimated to be only just over 30 million tonnes, with total world annual production expected to rise from the current 150,000 tonnes of Lithiun Carbonate Equivalent ("LCE") to 300,000 tonnes by 2020. The majority of current world production is based on brine pumping from Salars in South America, and deposits in China and Australia.

 

 

 

 

 

"Lithium is an important metal in today's quest for energy and energy storage solutions, for example in the fast-growing electric car market. To be part of this discovery is a very exciting prospect for the Company. The substantial amount of lithium-bearing clays present also represents an interesting opportunity for supply to the oil industry since these clays are becoming increasingly necessary for HTHP drilling muds now being used in deep oil and gas wells and for fracking.

 

"We are very pleased with the lithium grades obtained to date and widths of intercepts of the clay units in the holes. These results again demonstrate the continuity and persistence of the lithium-bearing clay units onto the joint venture lands and highlight the potential for a significant lithium resource to be outlined. Theresults from drilling are consistent with the mineralisation in the adjoining La Ventana deposit to the north-west. REM's management expects to provide an initial resource estimate, once all of the drilling results are available."

 

Update:

Drill hole locations can be found on the Company's website (www.rareearthmineralsplc,com)

 

Table 1. Significant Lithium Intercepts

From

To

Interval

Lithology

Li ppm

LCE* %

Li2O %

K2O %

Drill Hole ES-02

193.55

197.21

3.66

Upper Clay

3,114

1.65

0.67

1.25

203.55

233.78

30.23

Lower Clay

3,968

2.11

0.85

1.73

Drill Hole ES-03

186.39

199.85

13.46

Upper Clay

3,073

1.64

0.66

0.72

210.31

239.65

29.34

Lower Clay

3,877

2.06

0.83

1.05

Drill Hole ES-04

120.70

131.37

10.67

Upper Clay

2,547

1.36

0.55

0.65

140.39

171.75

31.37

Lower Clay

3,594

1.91

0.77

0.89

 

*LCE = lithium carbonate (Li2CO3) Equivalent: determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3 value in percent. Use of LCE assumes 100% recovery and no process losses in conversion of Li to Li2CO3.

Li2O = lithium oxide and is determined by multiplying Li value in percent by 2.153 to get an equivalent Li2O value in percent.

Clay units also exhibited elevated values in other alkali metals, including K, Na, Cs, and Rb, as well as alkali earth metals: Mg, Ca and Sr.

Analyses of the drill core were performed by ALS Chemex, in Vancouver, BC, an internationally recognized assay service provider. The Company followed industry standard procedures for the work carried out during the drill program, with a quality assurance/quality control (QA/QC) program. Internal standard samples were inserted into each drill core sample sequence sent to the laboratory for analysis. No significant QA/QC issues were detected during review of the data.

 

 

 

 

 

In terms of the lithologies intersected in the remaining holes that have not been previously reported, these intercepts are tabulated below in Table 2 and illustrated in Figure 1. The combined clay units average 63.67 metres in thickness in the area drilled, with the Upper Clay Unit averaging 28.64 metres and the Lower Clay Unit averaging 34 metres.

The drilling tested 4 kilometres of strike length of the clay units, which at the northern part of the concession area is capped by basalt, but is exposed in the southern part.

 

Table 2. Summary of Lithologies intersected Holes ES-03 to ES-10

ES-03

ES-04

ES-05

ES-06

Lithology

From

-

To

LI*

From

-

To

LI*

From

-

To

LI*

From

-

To

LI*

Basalt

0.0

146.9

0.0

86.1

0.0

11.3

0.0

6.1

Sandstone

146.9

158.5

86.1

96.4

11.3

23.2

6.1

17.16

Upper clay

158.5

201.5

42.9

96.4

132.5

36.0

23.2

55.5

32.3

17.2

32.2

22.4

Ignimbrite

201.5

210.9

132.5

140.4

55.5

59.8

32.2

33.5

Lower clay

210.9

239.6

28.7

140.4

163.4

22.9

59.8

92.1

32.2

33.5

78.3

44.8

Basement

239.6

256.0

163.4

195.1

92.1

123.8

78.3

92.6

ES-07

ES-08

ES-09

ES-10

Lithology

From

-

To

LI*

From

-

To

LI

From

-

To

LI

From

-

To

LI

Basalt

0.0

8.3

0.0

3.6

Sandstone

0.0

3.4

8.3

19.2

3.6

14.9

Upper clay

3.4

32.0

28.6

19.2

45.1

25.9

14.9

46.8

31.9

Ignimbrite

32.0

36.0

45.1

49.4

46.8

51.2

0.0

4.0

Lower clay

36.0

69.5

33.5

49.4

73.8

24.2

51.2

82.0

30.0

4.0

28.4

24.4

Basement

69.5

96.3

73.8

85.4

82.0

97.5

28.4

59.7

 

LI* = length of interval intersected in drill hole, rounded to nearest tenth of a metre. All holes were drilled vertically (-90o); clay units dip approximately 20o to the north east; consequently true thickness is estimated to be 94% of intervals intersected.

About the Sonora Lithium Project:

The Company's optioned concessions cover 3,411 hectares out of a total of 5,786 contiguous hectares that make up the Sonora Lithium Project owned by Bacanora.

Lithium is the lightest of the alkali metals and has unique electrochemical properties that make it the element of choice for batteries of high energy storage capacity and other energy applications as well as a host of industrial and health applications. Lithium-bearing clays also have application in the petroleum industry for high temperature - high pressure tolerant drilling muds.

 

 

 

 

 

 

Qualified Person's Statement:

 

Information in this announcement relates to information compiled by Carl G Verley, P.Geo, a consultant to the Company, who is a member of the Association of Professional Engineers and Geoscientists of British Columbia and is a Qualified Person with respect to the information disclosed herein.

 

For further information please contact:

 

Rare Earth Minerals Plc www.rareearthmineralsplc.com 

David Lenigas, Chairman

+44 (0) 207 440 0640

 NOMAD - WH Ireland

James Joyce/Nick Field

+44 (0) 207 220 1666

PR - Pelham Bell Pottinger

Charlie Vivian/ Weston Macklem

+44 (0)20 7861 3232

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUSVKRORAWARR
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.