Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.30    -0.35 (-4.58%)
Bid:
7.10
Ask:
7.50
Spread: 0.40 (5.634%)
Market Cap: £29.88m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Drilling Update

7 Jun 2013 07:00

RNS Number : 5177G
Rare Earth Minerals PLC
07 June 2013
 



7 June 2013 

 

Rare Earth minerals plc

("Rare Earth Minerals" or "the Company")

Drilling Update - Hole 2 Completed

Mexican Lithium Joint Venture

 

Rare Earth Minerals PLC (AIM: REM) is pleased to provide a further update on the diamond drill program that is underway at the El Sauz - Fleur lithium concessions in Northern Mexico, and under joint venture with Bacanora Minerals Ltd. (BCN: TSX-V). As previously reported (June 4, 2013) the first diamond drill hole (ES-01) has been completed. The second hole (ES-02) has also been completed.

The second hole was drilled 1,000 metres southeast of and on strike from the La Ventana lithium deposit The preliminary log for ES-02 show intersections of 9 metres length for the Upper Clay and 24 metres for the Lower Clay (Table 1), these are estimated to be equivalent to true thicknesses of 6.5 metres and 40.9 metres for the Upper and Lower Clay units respectively. The top part of the Upper Clay in this hole was offset by a fault, consequently it appears thinner than in hole ES-01. However the Lower Clay sequence in ES-02 is thicker than ES-01, which is positive. The nature of the clay units in these intervals correlate well with the clay units found on La Ventana.

Table 1. El Sauz - Fleur Hole ES-02 Preliminary Log

Hole: ES-02

0

3

3

Overburden

3

188

185

Basalt

188

197

9

Upper Clay

197

204

7

Ignimbrite

204

247

43

Lower Clay

247

260

13

Basal Volcanics

The results of the first two holes successfully demonstrate continuity of the clay units from the La Ventana lithium deposit onto the Fleur concession. The two holes extend the strike length of the clay-bearing sedimentary succession on La Ventana by one kilometre to the southeast, for a total drill indicated strike length on both the La Ventana and Fleur concessions of approximately 6 kilometres.

Analytical results from drill core samples taken across the clay units of hole ES-01 are expected within the next 3 to 4 weeks.

Drilling has commenced on the third hole (ES-03) of the 10 hole program. The third hole is situated 700 metres southeast of ES-02. Hole ES-03 will test continuity onto the El Sauz concession where the clay units become exposed at surface at the southern part of the concession. Estimated depth to top of Upper Clay in ES-03 is 100 to 150 metres.

 

David Lenigas, The Company's Chairman commented:

"REM is pleased to report that the same clay sequences have been identified along strike from the 60 million tonne La Ventana lithium deposit, which averages 1.6% Lithium Carbonate Equivalent. We look forward to reporting the grades of the drilling in due course."

About the Sonora Lithium Project:

The Company's optioned concessions cover 3,411 hectares out of a total of 5,786 contiguous hectares that make up the Sonora Lithium Project owned by Bacanora.

Lithium is the lightest of the alkali metals and has unique electrochemical properties that make it the element of choice for batteries of high energy storage capacity and other energy applications as well as a host of industrial and health applications." 

____________________________

*LCE = lithium carbonate (Li2CO3)Equivalent: determined by multiplying Li value in percent by 5.324 to get an equivalent Li2CO3 value in percent. Use of LCE assumes 100% recovery and no process losses in conversion of Li to Li2CO3.

 

 

Qualified Person's Statement:

 

Information in this announcement relates to information compiled by Carl G Verley, P.Geo, a consultant to the Company, who is a member of the Association of Professional Engineers and Geoscientists of British Columbia and is a Qualified Person with respect to the information disclosed herein.

 

For further information please contact:

 

Rare Earth Minerals Plc www.rareearthmineralsplc.com 

David Lenigas, Non-Executive Director

+44 (0) 207 440 0640

 

NOMAD - WH Ireland

James Joyce

Nick Field

+44 (0) 207 220 1666

 

PR - Pelham Bell Pottinger

Charlie Vivian

+44 (0)20 7861 3232

 

Weston Macklem

+44 (0)20 7861 3232

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFLLRVIRIIV
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.