Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.12
Bid: 0.11
Ask: 0.13
Change: 0.00 (0.00%)
Spread: 0.02 (18.182%)
Open: 0.12
High: 0.12
Low: 0.12
Prev. Close: 0.12
TYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

MB Fluorspar Project - Drill Results

18 Dec 2013 07:00

RNS Number : 8072V
Tertiary Minerals PLC
18 December 2013
 



Tertiary Minerals PLC

www.tertiaryminerals.com

("the Company")

18 December 2013

 

MB Project Resource Drilling

 

First results confirm potential for definition of open-pit mineable fluorspar resource

 

Tertiary Minerals plc, the AIM traded company building a strategic position in the fluorspar sector, is pleased to release significant analytical results from the first 13 of 22 holes drilled in Phase 2 of its first drill programme at the MB fluorspar project in Nevada USA where the Company aims to define a 1JORC compliant Mineral Resource.

 

Highlights:

 

v Southern Area:

 

· Results from first 10 holes drilled in Southern Area confirm potential for definition of open-pit mineable fluorspar resource.

 

· Thick zones of mineralisation intersected between surface and the maximum depth of drilling (125m) - all holes end in mineralisation.

 

· Mineralisation remains open in all directions so far (over 300m x 400m area).

 

v Central Area:

 

· Results from 5 wide spaced holes are awaited.

 

· Significant results expected based on sample logging.

 

v Drill permit modified to allow further drilling between Southern and Central areas which may connect in undrilled areas.

 

 

Commenting on the results being released today Managing Director Richard Clemmey said: "These early results are highly encouraging, particularly the regular occurrence of thick intervals containing more than 10% fluorspar. We eagerly await further results"

 

A map showing the location of Company drill holes is available on the Company's website and more detailed information and a complete tabulation of significant drilling results are given below.

ENQUIRIES:

 

For further information please contact:

 

Tertiary Minerals plc

Tel: +44 (0)845 868 4580

Patrick Cheetham, Executive Chairman

Richard Clemmey, Managing Director

 

Cantor Fitzgerald Europe

 

Tel: +44 (0)20 7894 7000

Stewart Dickson/Julian Erleigh (Corporate Finance)

Jeremy Stephenson (Corporate Broking)

Beaufort Securities Limited

Tel: +44 (0)20 7382 8300

Christopher Rourke (Corporate Finance)

Guy Wheatley (Corporate Broking)

Yellow Jersey PR Limited

Tel: +44 (0)20 3664 4087

Dominic Barretto/Kelsey Traynor

 

 

Detailed Information

 

The MB Project claims are located in an area of good infrastructure 19km southwest of the County town of Eureka in central Nevada, USA. Nevada is long recognised as one of the most attractive mining jurisdictions in the world.

 

The Company acquired the MB project in late 2011 and has moved quickly to evaluate the project defining a large exploration target based on limited drilling during the 1960-70s which showed that flat-lying fluorspar mineralisation occurs as a skarn-type replacement of limestone beneath a quartzite cap.

 

The Company's first drill programme has been completed in two phases. The objective of Phase 1 of the drilling programme was to evaluate the most cost-effective drilling technique for the MB Project, test suitable analytical techniques for fluorine, and to collect diamond drill core for use in preliminary metallurgical testing. Phase 1 comprised two holes in the Southern Area and two holes in the Central Area. Results were announced on 11 September 2013.

 

Phase 2 drilling comprised 22 holes (13TMBRC005-26) and was completed in November 2013. It was designed to define an initial JORC Code compliant Mineral Resource in the Southern Area as well as to test for mineralisation in the poorly drilled Central Area and a more speculative target on the north side of the known mineralisation.

 

Results are now being presented for the first 13 holes drilled in Phase 2. 2Significant drill results are shown in the accompanying table. For the purposes of this reporting "significant" is taken to be a minimum three metre drill intersected thickness above a 6% CaF2 (fluorspar) cut-off. Values above a 10% cut off within these significant results are also shown in bold. Historical drill results were reported on the same basis.

 

All holes were drilled vertically and reported drill-intersected thicknesses are believed to approximate true thicknesses of mineralisation. Drill samples were prepared by American Assay Laboratories in Nevada (ISO-17025 accredited) and fluorine analysis has been carried out by PANalytical Ltd in the UK (UKAS accredited). Check samples were analysed by Labtium Oy in Finland (FINAS accredited to ISO/IEC 17025:2005) as part of the rigorous QA/QC sampling programme required for a JORC compliant Mineral Resource estimate.

 

Southern Area

 

The results being reported today are from 10 of the 14 Phase 2 holes drilled on the north, north-west and east side of the Southern Area drill grid (Holes 13TMBRC008-017). Holes were drilled at 80-100m spacing over an area approximately 300mx400m. All holes intersected thick intervals of fluorspar mineralisation between surface and the maximum depth of drilling which was limited to 125m from surface. The results indicate that mineralisation has not been closed off in any of these directions - or at depth. Hole 13TMBRC010 was ended prematurely, in significant fluorspar mineralisation, after the drill rods became stuck down-hole. Results are only available for the first 29m of hole 13TMBRC017 so far.

 

Central Area

 

Positive drill results for Phase 1 Hole 13TMBRC003, on the south-east side of the Central Area, have already been reported. In Phase 2 a further 5 holes were drilled at a spacing of 200-400m over an area of approximately 600m by 400m. Logging of the drill chips from these holes suggests fluorspar mineralisation is continuous throughout this area although high and low grade mineralisation is very difficult to differentiate visually in small drill chips. Analytical results are not yet available.

 

Northern Area

 

Three holes (Holes 13TMBRC005-007) were drilled in the speculative Northern target area where shallow drilling in the 1960's by Union Carbide suggested the potential for fluorspar mineralisation in a different geological environment to that now known in the Southern and Central Areas. These holes failed to intersect significant mineralisation. It is considered that this area may be a down faulted block and that there remains potential mineralisation at deeper levels in this area.

 

The Company has applied for and been granted a modification to its existing drill permit to allow further drilling between the Southern and Central Areas as it is believed that mineralisation is most likely continuous between these two areas.

 

 

Foot Notes

 

1JORC is the Australian Code for the reporting of exploration results, Mineral Resources and Ore Reserves prepared by the Joint Ores Reserves Committee (JORC) of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and the Minerals Council of Australia.

 

2Significant, as applied to a cut-off grade for reporting drill result, does not imply an economic cut off. An economic cut-off will depend on many factors and will not be determined until feasibility studies, if warranted, are carried out.

 

The information in this release has been compiled and reviewed by Mr. Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

 

Cautionary Note: Traditional analytical methods measure fluorine content and fluorite (CaF2, fluorspar) contents are calculated on the assumption that all fluorine is present as fluorite. Metallurgical testwork reviewed by the Company suggest this is likely although small amounts of fluorine can occur in mica and other minerals commonly present in skarn mineralised systems.

 

 

 

Notes to Editors

 

Tertiary Minerals plc (ticker symbol 'TYM') is an AIM-quoted mineral exploration and development company building a significant strategic position in the fluorspar sector. Fluorspar is an essential raw material in the chemical, steel and aluminium industries. Tertiary controls two significant Scandinavian projects (Storuman in Sweden and Lassedalen in Norway) and, now, a large deposit of strategic significance in Nevada USA (MB Project).

 

 

 

 

Table of significant drill result from Phase 2 drilling at MB Fluorspar Project to 17 Dec. 2013

 

Drill Hole

Number

Down Hole

Thickness (m)

Grade

Fluorspar

CaF2 (%)

From (m)

To

 (m)

Hole

Depth (m)

Comment

13TMBRC008

83.82

8.1%

39.62

123.44

124.97

Hole ended in mineralisation

inc.

15.24

12.0%

54.86

70.10

inc.

6.10

10.9%

91.44

97.54

Inc.

3.05

13.1%

120.40

123.44

13TMBRC009

4.57

7.5%

35.05

39.62

124.97

Significant mineralisation at *EOH

and

68.58

9.9%

42.67

111.25

inc.

18.29

11.1%

53.34

71.63

inc.

3.05

10.5%

74.68

77.72

inc.

10.67

14.3%

80.77

91.44

inc.

3.05

11.6%

102.11

105.16

and

4.57

8.8%

120.40

124.97

13TMBRC010

54.86

9.9%

44.20

99.06

99.06

Hole abandoned at 99m (stuck)

inc.

3.05

11.2%

44.20

47.24

Significant mineralisation at EOH

inc.

30.48

11.8%

67.06

97.54

13TMBRC011

27.43

10.5%

16.76

44.20

124.97

inc.

12.19

13.8%

30.48

42.67

and

25.91

8.3%

50.29

76.20

and

10.67

7.25%

80.77

91.44

13TMBRC012

9.14

8.8%

18.29

27.43

124.97

Hole ended in mineralisation

inc.

6.10

10.1%

21.34

27.43

and

36.58

8.4%

39.62

76.20

inc.

7.62

11.0%

42.67

50.29

and

3.05

6.6%

80.77

83.82

and

7.62

6.6%

99.06

106.68

13TMBRC013

65.53

8.5%

27.43

92.96

124.97

Hole ended in mineralisation

inc.

7.62

12.0%

33.53

41.15

inc.

6.10

10.2%

56.39

62.48

inc.

6.10

14.1%

85.34

91.44

13TMBR014

22.86

10.1%

15.24

38.10

124.97

Hole ended in mineralisation

inc.

10.67

14.1%

24.38

35.05

and

16.76

8.6%

44.20

60.96

and

9.14

9.7%

76.20

85.34

inc.

3.05

14.2%

77.72

80.77

 

Drill Hole

Number

Down Hole

Thickness (m)

Grade

Fluorspar

CaF2 (%)

From (m)

To

 (m)

Hole

Depth (m)

Comment

13TMBRC15

24.38

8.7%

6.10

30.48

124.97

Hole ended in mineralisation

inc.

3.05

15.0%

19.81

22.86

and

16.76

8.6%

38.10

54.86

inc.

3.05

11.6%

38.10

41.15

and

4.57

8.48%

65.53

70.10

13TMBR16

53.34

10.3%

15.24

 

 

68.58

124.97

Hole ended in mineralisation

inc.

15.24

12.1%

39.62

54.86

Inc.

4.57

14.1%

60.96

65.53

and

6.10

8.0%

83.82

89.92

and

6.10

10.3%

108.20

114.30

13TMBR17

*16.76

12.8%

12.19

28.96

Assays available to 28.96m depth at date of report. Significant mineralisation to depth limit of available assays

All holes drilled vertically.

*Significant Mineralisation to EOH:  means reported interval extends to end of hole or hole ended in mineralisation grading in excess of cut-off.

Hole ended in mineralisation: means lower grade mineralisation extends to end of hole.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFFDFUWFDSEFE
Date   Source Headline
15th Dec 201611:47 amRNSStoruman Mine Permit Update
13th Dec 20167:00 amRNSAudited Results for the year to 30 September 2016
7th Dec 20167:00 amRNSLassedalen Project Land Purchase
5th Dec 20167:00 amRNSSale of Non-Core Gold Assets
16th Nov 201610:31 amRNSHolding(s) in Company
31st Aug 201610:31 amRNSTotal Voting Rights
3rd Aug 201611:11 amRNSDirector Dealing, Issue of Equity and TVR
11th Jul 20167:00 amRNSDirectorate Change
14th Jun 201611:34 amRNSHolding(s) in Company
31st May 20167:00 amRNSTotal Voting Rights
26th May 20167:01 amRNSPlacing, Issue of Equity & Total Voting Rights
26th May 20167:00 amRNSHalf-Yearly Report 2016
12th Apr 201611:48 amRNSHolding(s) in Company
31st Mar 201610:43 amRNSTotal Voting Rights
29th Mar 20162:20 pmRNSStoruman Mine Permit Appeals
14th Mar 20167:00 amRNSIssue of Equity, Warrants and Director Dealing
8th Mar 201611:00 amRNSIssue of Equity by Sunrise Resources PLC
8th Mar 201611:00 amRNSIssue of New Ordinary Shares & Total Voting Rights
2nd Mar 20167:00 amRNSStoruman Mining Permit Update
19th Feb 201610:26 amRNSResult of AGM
18th Feb 20161:48 pmRNSApproval of Mining Permit Storuman
16th Feb 20167:00 amRNSDrilling Report
26th Jan 20162:26 pmRNSDirector Dealing
12th Jan 20167:00 amRNSPublication of Report and Accounts / Notice of AGM
31st Dec 20157:00 amRNSDirector's dealings
14th Dec 20157:00 amRNSAudited Results for the year to 30 September 2015
4th Dec 20157:00 amRNSMB Drilling and Storuman Fluorspar Project Update
30th Oct 20157:00 amRNSTotal Voting Rights
6th Oct 201511:00 amRNSPlacing, Issue of Equity & Total Voting Rights
27th Aug 20153:03 pmRNSDirector Dealing, Issue of Equity and TVR
30th Jul 201512:25 pmRNSDirector Dealing, Issue of Equity,TVR & Correction
17th Jun 20157:00 amRNSMB Project JORC Mineral Resource Estimate Increase
4th Jun 20154:58 pmRNSDirector Dealing
20th May 20157:00 amRNSHalf Yearly Report
31st Mar 20154:14 pmRNSPlacing, Issue of Equity & Total Voting rights
19th Mar 20153:09 pmRNSDirector's Dealing
12th Mar 20157:00 amRNSDirector Dealing
9th Mar 201510:40 amRNSExercise of Warrants, Issue of Equity and TVR
27th Feb 20154:30 pmRNSTotal Voting Rights
23rd Feb 20153:05 pmRNSDirector's Dealings, Warrants, TVR & Correction
23rd Feb 20153:04 pmRNSDirector's Dealings, Warrants, TVR & Correction
23rd Feb 20157:00 amRNSTertiary Minerals Presenting
19th Feb 20157:00 amRNSMB Project - Final Results for Phase 3 Drilling
11th Feb 20157:00 amRNSMB Project - Further Significant Drilling Results
5th Feb 20154:30 pmRNSResult of AGM
5th Feb 20157:00 amRNSAGM Presentation
22nd Jan 20157:00 amRNSMB Project-Further Significant Analytical Results
9th Jan 20152:40 pmRNSAnnual Report and AGM
18th Dec 20147:00 amRNSMB Project - Significant Analytical Results
12th Dec 20147:00 amRNSAudited Results for the year to 30 September 2014

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.