Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

MB Project - Significant Analytical Results

18 Dec 2014 07:00

RNS Number : 1020A
Tertiary Minerals PLC
18 December 2014
 



 

Tertiary Minerals plc ("Tertiary" or "Company")

18 December 2014

MB Fluorspar Project

Higher Grades and Multiple Thick Fluorspar Mineralised Intervals Confirmed in Deep Step-Out Hole

Tertiary Minerals plc, the AIM traded company building a strategic position in the fluorspar sector, is pleased to release analytical results from the first drill hole in its Phase 3 drilling programme at the MB fluorspar project in Nevada, USA.

Highlights (Hole 14TMBRC027):

 

· Multiple thick intersections of significant(1) fluorspar (CaF2) mineralisation intersected increasing in grade down hole.

 

· 307.85m grading 8.42% CaF2 from 59.44m depth, including:

 

Ø 141.73m grading 11.55% CaF2 of continuous mineralisation from 225.55m depth

 

Ø 70.10m grading 16.63% CaF2 from 59.44m, total of several higher grade intersections above 15% CaF2

 

· Mineralisation continuing at end of hole (516m).

 

· The results indicate the potential of the MB Project to be much larger than anticipated.

Commenting today, Managing Director, Richard Clemmey said: "We are very pleased to be reporting significant results from this important deep step-out hole. Multiple thick intersections at higher grades than previously encountered confirms our belief that we are only just starting to see the real potential of the MB Project. We look forward to reporting results from the remaining 8 drill holes in due course."

A map showing the location of the completed Phase 3 drill holes is available on the Company's website:

http://www.tertiaryminerals.com/projects/fluorspar-projects/mb-fluorspar-nevada-usa

More detailed information and a complete tabulation of significant drilling results for drill hole 14TMBRC027 are given below. Reported thicknesses are believed to be approximate true thicknesses based on flat lying mineralisation.

 

Enquiries

 

Tertiary Minerals plc

Patrick Cheetham, Executive Chairman 

Richard Clemmey, Managing Director

 

 

 

+44 (0)845 868 4580

SP Angel Corporate Finance LLP

Nominated Adviser & Joint Broker

Ewan Leggat

Katy Birkin

 

 

+44 (0) 20 3470 0470

Beaufort Securities Ltd

Joint Broker

Saif Janjua

 

 

+44 (0)20 7382 8300

Yellow Jersey PR Limited

Dominic Barretto

Kelsey Traynor

+44 (0)7768 537 739

 

Detailed Information

 

Project Background

The MB Project claims are located in an area of good infrastructure 19km southwest of the County town of Eureka in central Nevada, USA. Nevada is long recognised as one of the most attractive mining jurisdictions in the world.

Since acquiring the project in late 2012, the Company has moved quickly to progress the following project milestones completed to date:

· February 2013 - Independent Tonnage Grade Estimate

· August 2013 - Phase 1 drilling programme

· November 2013 - Phase 2 drilling programme

· April 2014 - Maiden JORC (2012 Edition) compliant Mineral Resource Estimate

· November 2014 - Phase 3 drilling programme

Full details of the completed work programmes and results from Phase 1 & 2 drilling have previously been reported by the Company.

Phase 3 Drilling, Hole 14TMBRC027

 

This vertical hole, is located more than 700m to the west of the existing Mineral Resource boundary and, at 516m, is the deepest hole the Company has drilled on the MB project to date. The hole was drilled using the reverse circulation percussion method with samples being collected for analysis at 5 foot intervals.

The key objectives for drilling this hole were to:

1. Test the lateral extent of fluorspar mineralisation to the west of the existing Mineral Resource

2. Test the depth of fluorspar mineralisation

3. Target potential higher grade fluorspar closer to the interpreted source of mineralisation

The results have confirmed that all of these objectives have been achieved and indicate that significant fluorspar mineralisation is continuing 700m to the west of the known Mineral Resource.

The grade of fluorspar encountered in this hole is increasing at depth with thick intersections grading more than 15% CaF2(2), previously unseen in the Company's Phase 1 and 2 drilling campaigns. The multiple thick intersections of significant fluorspar mineralisation from 59.44m depth to more than 367m indicate that further significant and possibly higher grade mineralisation might also underlie the current defined Mineral Resource where existing holes extend no deeper than 150m below surface and where mineralisation is open at depth and along strike.

The results from hole 14TMBRC027 confirm the potential to increase the size of the current defined large JORC(3) (2012 Edition) compliant Mineral Resource Estimate of 38.4 million tonnes grading 10.4% fluorspar (CaF2).

The Company will report on the results of the remaining 8 holes in the Phase 3 drilling programme in due course as they become available.

Fluorine analysis

 

Samples from hole 14TMBRC027 were originally submitted to a primary ISO accredited laboratory for analysis whilst selected duplicate check samples were submitted to a number of other ISO accredited laboratory as part of the Company's QA/QC procedure in order to check analytical accuracy of the primary laboratory. The results received indicated that the fluorine analysis from the primary laboratory were not sufficiently accurate in comparison to the check laboratories.

 

As a result of this process the Company re-submitted all samples from hole 14TMBRC027 to one of the check laboratories - Bureau Veritas Minerals Pty Ltd in Australia (ISO-17025 accredited). All samples were analysed for fluorine using the fused bead X-ray fluorescence (XRF) method. The samples submitted included various known standards, blanks and field duplicates as a further QA/QC check on the results. QA/QC samples were also submitted to PANalytical Ltd in the UK (UKAS accredited) for analysis using the same method. The QA/QC checks on the results being reported today are all within acceptable limits and therefore the Company is able to release the data.

 

Foot Notes

1. Significant fluorspar (CaF2) mineralisation is defined by the Company as a minimum three metre drill intersection above 8% fluorspar (CaF2) cut-off and containing a maximum three metre drill intersection below 8% fluorspar (CaF2) cut-off. This cut off is currently applied for reporting of the drill results from MB project as this is the cut-off used for the most recent Mineral Resource estimate. However, in the context of reporting drill results it does not imply an economic cut off. An economic cut-off will depend on many factors and will not be determined until feasibility studies, if warranted, are carried out.

 

2. Mineralisation having a weighted average grade of composite sample intervals greater than 15% CaF2.

 

3. JORC is the Australian Code for the reporting of exploration results, Mineral Resources and Ore Reserves prepared by the Joint Ores Reserves Committee (JORC) of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and the Minerals Council of Australia.

 

4. The information in this release has been compiled and reviewed by Mr. Richard Clemmey (BSc, CEng, MIQ, MIMMM, ARSM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Clemmey is a Chartered Engineer and a Member of the Institute of Materials, Minerals & Mining.

 

5. Cautionary Note: Traditional analytical methods measure fluorine content and fluorite (CaF2, fluorspar) contents are calculated on the assumption that all fluorine is present as fluorite. Small amounts of fluorine can occur in mica and other minerals commonly present in skarn mineralised systems.

 

Notes to Editors

Tertiary Minerals plc (ticker symbol 'TYM') is an AIM-quoted mineral exploration and development company building a significant strategic position in the fluorspar sector. Fluorspar is an essential raw material in the chemical, steel and aluminium industries. Tertiary controls two significant Scandinavian projects (Storuman in Sweden and Lassedalen in Norway) and a large deposit of strategic significance in Nevada USA (MB Project).

 

Table of Significant(1) Drilling Results from Hole 14TMBRC027

 

Drill Hole Number

Down Hole Thickness (m)

Grade Fluorspar CaF2 (%)

From (m)

To (m)

14TMBRC027

18.29

13.39

59.44

77.73

and

6.10

10.43

97.54

103.64

and

9.14

10.09

115.82

124.96

and

3.05

10.58

128.02

131.07

and

12.19

9.30

166.12

178.31

and

4.57

10.96

192.02

196.59

and

64.01

12.68

225.55

289.56

and

4.57

10.07

310.90

315.47

and

15.24

12.99

318.52

333.76

and

24.38

18.15

342.90

367.28

and

3.05

11.05

484.63

487.68

 

Table of Higher Grade Intervals (>15% CaF2)(2)

Drill Hole Number

Down Hole Thickness (m)

Grade Fluorspar CaF2 (%)

From (m)

To (m)

14TMBRC027

and

12.19

15.45

59.44

71.63

and

3.05

17.98

230.12

233.17

and

4.57

16.61

237.74

242.32

and

19.81

15.03

265.18

284.99

and

7.62

15.29

326.14

333.76

and

10.67

19.98

342.90

353.57

and

12.19

17.96

355.09

367.28

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCTRBRTMBMBBFI
Date   Source Headline
4th Jun 20267:00 amRNSPlacing and Proposed Subscription for £1,000,000
15th May 20268:37 amRNSCorrection to Grant of Warrants RNS
5th May 20267:34 amRNSOperations Update, Zambia
20th Apr 20267:00 amRNS-RInvestor Presentation via Investor Meet Company
17th Apr 20261:50 pmRNSGrant of Warrants
17th Apr 202612:00 pmRNSHolding(s) in Company
30th Mar 20267:00 amRNSJORC Compliant Exploration Target - Mushima North
20th Mar 202611:46 amRNSResults of Annual General Meeting
19th Mar 202612:30 pmRNSResult of AGM
20th Feb 20263:32 pmRNSHolding(s) in Company
20th Feb 20267:00 amRNSAnnual Report for the Year Ended 30 September 2025
17th Feb 20267:00 amRNSAudited Results for Year Ended 30 September 2025
4th Feb 20267:00 amRNSHighest Grade Ag-Cu at Target A1, Mushima North
2nd Feb 202612:19 pmRNSHolding(s) in Company
6th Jan 20269:03 amRNSHolding(s) in Company
17th Dec 20257:00 amRNSBoard Change
16th Dec 20257:00 amRNSIntent to Produce Target for Cu-Ag, Mushima North
28th Nov 202510:08 amRNSTotal Voting Rights
13th Nov 20253:42 pmRNSDirector/PDMR Shareholding
13th Nov 20257:00 amRNSDrilling Update at Target A1, Mushima North
7th Nov 20252:11 pmRNSCLN Facility to Expand Exploration Programme
5th Nov 20259:37 amRNSDrilling Commences at Target A1
31st Oct 202511:04 amRNSTotal Voting Rights
31st Oct 20257:00 amRNSUpcoming Phase 3 Drill Programme at Target A1
30th Oct 20257:00 amRNSKobold to advance Konkola West Project Agreement
28th Oct 20257:00 amRNSAppointment of Corporate Broker
20th Oct 20257:00 amRNSPlacing to raise £100,000
9th Oct 20257:00 amRNS-RProject Focus: Target A1, Mushima North, Zambia
3rd Oct 20253:47 pmRNSHolding(s) in Company
2nd Oct 20254:07 pmRNSHolding(s) in Company
1st Oct 20257:21 amRNSHighest grade Ag-Cu at Target A1, Mushima North
24th Sep 20257:00 amRNSDrill holes show silver - Target A1, Mushima North
10th Sep 202512:29 pmRNSHolding(s) in Company
3rd Sep 20253:42 pmRNSHolding(s) in Company
2nd Sep 20257:00 amRNSPhase 2 Drilling Results: Target A1, Mushima North
11th Aug 20257:00 amRNSCompletion of Phase 2 at Target A1 - Mushima North
31st Jul 20251:42 pmRNSTotal Voting Rights
25th Jul 202510:09 amRNSHolding(s) in Company
25th Jul 20258:30 amRNSHolding(s) in Company
21st Jul 20257:00 amRNSDrilling Commences at Target A1 - Mushima North
8th Jul 20257:00 amRNSUpcoming Drill Programme - Mushima North, Zambia
4th Jul 20259:45 amRNSHolding(s) in Company
1st Jul 202511:31 amRNSDirectors’ Subscriptions
30th Jun 202510:13 amRNSTotal Voting Rights
27th Jun 20252:00 pmRNSHalf-Yearly Report 2025
25th Jun 20257:00 amRNSUpdate: Konkola West Copper Project, Zambia
23rd Jun 20258:53 amRNSHolding(s) in Company
19th Jun 20257:00 amRNS-RProject Focus: Jacks Copper Project, Zambia
17th Jun 20259:27 amRNSHolding(s) in Company
16th Jun 20253:07 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.