We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1025
Bid: 0.095
Ask: 0.11
Change: 0.0025 (2.56%)
Spread: 0.015 (15.789%)
Open: 0.0975
High: 0.10
Low: 0.10
Prev. Close: 0.0975
TYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

16 Feb 2016 07:00

RNS Number : 1367P
Tertiary Minerals PLC
16 February 2016
 

 

Tertiary Minerals plc ("Tertiary" or "Company")

16 February 2016

MB Fluorspar Project Update

Completion and Results for Phase 4 Drilling

Tertiary Minerals plc, the AIM traded company building a strategic position in the fluorspar sector, is pleased to announce completion and receipt of analytical results from the Phase 4 drilling programme at its MB fluorspar project in Nevada, USA.

Highlights:

· Phase 4 drilling programme completed - 4 holes for a total of 1,553 metres drilled

 

· Thick intersections of fluorspar mineralisation encountered in step-out drilling - remains open at depth and along strike

 

· Hole 15TMBRC036 located west of the Western Area:

 

Ø 89.91m grading 12.02% CaF2 from 120.40m depth (total of 8 significant(1) fluorspar intersections)

 

· Including 31.99m grading 16.74% CaF2 from 150.88m (total of 6 higher grade(2) intersections above 15% CaF2)

 

· Hole 15TMBRC038 located to the north of the Western Area:

 

Ø 22.86m grading 11.47% CaF2 from 74.68m depth

 

· Hole 15TMBRC039 located to the north of the Western Area:

 

Ø 137.16m grading 11.54% CaF2 from 53.34m depth (total of 16 significant fluorspar intersections)

 

· Including 32.00m grading 15.81% CaF2 from 185.93m (total of 5 higher grade intersections above 15% CaF2)

 

· Ore-grade molybdenum (Mo) encountered in the base of hole 15TMBRC036 provides future exploration target.

 

Commenting today, Managing Director, Richard Clemmey said: "Results from the Phase 4 drilling programme continue to grow the known size of the MB deposit, proving both lateral and depth extension of significant fluorspar mineralisation in the Western Area which still remain open in all directions. We now look forward to incorporating these results into our economic evaluation of the project and progressing with the next phases of development this year"

An updated map showing the location of the completed Phase 4 drill holes is available on the Company's website:

http://www.tertiaryminerals.com/projects/fluorspar-projects/mb-fluorspar-nevada-usa

More detailed information and a complete tabulation of significant drilling results for drill holes 15TMBRC036 to 15TMBRC039 are given below. Reported thicknesses are believed to be approximate true thicknesses based on flat-lying mineralisation.

 

 

Enquiries

 

Tertiary Minerals plc

Richard Clemmey, Managing Director

Patrick Cheetham, Executive Chairman 

 

 

 

 

 

 

+44 (0)845 868 4580

SP Angel Corporate Finance LLP

Nominated Adviser & Joint Broker

Ewan Leggat/Tercel Moore

 

+44 (0) 20 3470 0470

 

Beaufort Securities Ltd

Joint Broker

Jon Belliss/Elliot Hance

 

 

+44 (0)20 7382 8300

Yellow Jersey PR Limited

Dominic Barretto/Aidan Stanley

 

+44 (0)7768 537 739

Detailed Information

 

Project Background

The MB Project claims are located in an area of good infrastructure 19km southwest of the County town of Eureka in central Nevada, USA. Nevada is long recognised as one of the most attractive mining jurisdictions in the world.

Since acquiring the project in late 2012, the Company has reached a number of important Mineral Resource definition milestones. Full details of the results from Phase 1, 2 and 3 drilling have been reported previously by the Company and resulted in the following maiden JORC(3) (2012 Edition) Mineral Resource Estimate and subsequent upgrade:

· Maiden JORC(3) Mineral Resource Estimate: 38.4 million tonnes grading 10.4% CaF2 - April 2014

· Upgraded JORC(3) Mineral Resource Estimate : 86.4 million tonnes grading 10.7% CaF2 - June 2015

Fluorspar mineralisation at the MB Project occurs over a vertical interval of at least 300m in Ordovician age Pogonip Limestone beneath a cap rock of Eureka Quartzite. It is associated with extensive skarn-type alternation of the host limestone. The footprint of the currently defined Mineral Resource is over one square kilometre (290 acres).

 

Geophysical Survey and Phase 4 Drilling

Following the completion of the JORC(3) (2012 Edition) Mineral Resource Estimate in June 2015 the Company completed a 166 line-km ground magnetic survey in order to gain an improved geological understanding of the fluorspar deposit and its geological controls. Subsequently, the Phase 4 drill programme was carried out during December 2015 and January 2016 and consisted of 4 holes totalling 1,553 metres.

The programme was successful in achieving its key objective to extend the lateral and depth extent of higher grade mineralisation in the newly discovered Western Area.

Drill Hole 15TMBRC036 is located approximately 190 metres to the west of the existing Mineral Resource boundary in the Western Area and was drilled to a depth of 484 metres. Multiple significant(1) and higher grade(2) fluorspar intersections encountered in this hole prove the lateral continuation of the fluorspar mineralisation to the west of the existing Mineral Resource boundary. The hole ends in fluorspar mineralisation grading 11.82% CaF2 and mineralisation is open at depth.

Drill Hole 15TMBRC037 is a step out hole located approximately 425 metres northwest of the existing Mineral Resource boundary of the Western Area and was drilled to a depth of 200 metres. The hole was drilled to test the northern extent of the fluorspar mineralisation in the Western Area but was terminated due to a change in lithology from limestone to barren granite. Further work is required to understand the nature of this granite intrusive in relation to the fluorspar mineralisation. It has been observed in historic drilling data that granite was encountered 366m southeast of this hole and acted as a cap to the fluorspar mineralisation which occurred at the lower contact of the granite and the host limestone. In hole 15TMBRC037 fluorspar mineralisation was limited to 4 individual 1.52 metre intersections above 9% fluorspar (CaF2) in the limestone above the granite.

Drill Hole 15TMBRC038 is located approximately 90 metres north from the existing Mineral Resource boundary of the Western Area and was drilled to a depth of 346 metres. A single, thick significant(1) fluorspar intersection was encountered in this hole which proves the continuation of the fluorspar mineralisation to the north of the existing Mineral Resource boundary.

Drill Hole 15TMBRC039 is located approximately 240m southeast of the deep step out hole 14TMBRC027 drilled in the Phase 3 programme, and was drilled to a depth of 523m. The hole was drilled to test the continuation of fluorspar mineralisation in the southern part of the Western Area. Multiple significant(1) and higher grade(2) fluorspar intersections encountered in this hole demonstrate the lateral continuation of the fluorspar mineralisation in the southern part of the Western Area.

Future Exploration Target

The fluorine endowment of the MB Project Area is extraordinary. Low grade fluorspar mineralisation is widespread outside of the higher grade intervals that are reported by the Company. For example, the entire thickness of the limestone intersected in hole 15TMBRC036, from beneath the quartzite cap rock to the base of hole, is mineralised to a greater or lesser degree and reports 334m grading nearly 6% fluorspar. Other holes are similarly mineralised.

Large volumes of fluorine, though rarely on this scale, are most commonly associated the Climax-type porphyry molybdenum (copper) mineral deposits where fluorine tends to form a halo above and around the molybdenum (copper) mineralisation.

Two results of special interest from the Phase 4 drill programme therefore were an intersection of potentially ore-grade molybdenum (Mo), 6.10 metres grading 0.14% MoS2, encountered at the base of hole 15TMBRC036 and an intersection of copper (Cu), 1.52 metres grading 0.11% Cu, at the base of the hole 16TMBRC38.

 

The Company believes that the newly intersected molybdenum and copper mineralisation may point to an underlying porphyry molybdenum-copper deposit and an exciting target for future exploration.

The Next Step

 

Following further evaluation of Phase 4 drilling results the priority for the Company is to move onto the next phases of development for the MB Project in 2016, including:

 

· Metallurgical testwork

· Economic modelling

· Scoping Study

· Mine Permit planning

 

Foot Notes

1. Significant fluorspar (CaF2) mineralisation is defined by the Company as a minimum three metre drill intersection above 9% fluorspar (CaF2) cut-off and containing a maximum three metre drill intersection below 9% fluorspar (CaF2) cut-off. This cut off is currently applied for reporting of the drill results from MB project as this is the cut-off used for the most recent Mineral Resource estimate. However, in the context of reporting drill results it does not imply an economic cut off. An economic cut-off will depend on many factors and will not be determined until feasibility studies, if warranted, are carried out.

 

2. Mineralisation having a weighted average grade of composite sample intervals greater than 15% CaF2.

 

3. JORC is the Australian Code for the reporting of exploration results, Mineral Resources and Ore Reserves prepared by the Joint Ores Reserves Committee (JORC) of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and the Minerals Council of Australia.

 

4. The information in this release has been compiled and reviewed by Mr. Richard Clemmey (BSc, CEng, MIQ, MIMMM, ARSM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Clemmey is a Chartered Engineer and a Member of the Institute of Materials, Minerals & Mining.

 

5. Cautionary Note: Traditional analytical methods measure fluorine content and the reported fluorite (CaF2, fluorspar) contents are calculated on the assumption that all fluorine is present as fluorite. However small amounts of fluorine can occur in mica and other minerals commonly present in skarn mineralised systems.

 

6. Fluorine analysis - Samples from all holes were submitted to Bureau Veritas Minerals Pty Ltd in Australia (ISO-17025 accredited) for analysis. All samples were analysed for fluorine using the fused bead X-ray fluorescence (XRF) method. The samples submitted included various known standards, blanks and field duplicates as a further QA/QC check on the results. The QA/QC checks on the results being reported today are all within acceptable limits and therefore the Company is able to release the data.

 

Notes to Editors

Tertiary Minerals plc (ticker symbol 'TYM') is an AIM-quoted mineral exploration and development company building a significant strategic position in the fluorspar sector. Fluorspar is an essential raw material in the chemical, steel and aluminium industries. Tertiary controls two significant Scandinavian projects (Storuman in Sweden and Lassedalen in Norway) and a large deposit of strategic significance in Nevada USA (MB Project).

 

Table of Significant(1) Drilling Results from Holes 15TMBRC036 to 15TMBRC039

Drill Hole Number

Down Hole Thickness (m)

Grade Fluorspar CaF2%

From (m)

To (m)

15TMBRC036

19.81

9.56

120.40

140.21

15TMBRC036

9.14

12.79

150.88

160.02

15TMBRC036

6.10

13.23

202.69

208.79

15TMBRC036

3.05

15.36

259.08

262.13

15TMBRC036

3.05

11.82

307.85

310.90

15TMBRC036

4.57

9.11

320.04

324.61

15TMBRC036

32.00

12.78

387.10

419.10

15TMBRC036

12.19

13.14

432.82

445.01

15TMBRC038

22.86

11.47

74.68

97.54

15TMBRC039

9.14

10.31

53.34

62.48

15TMBRC039

4.57

10.48

74.68

79.25

15TMBRC039

15.24

10.32

92.96

108.20

15TMBRC039

10.67

10.64

126.49

137.16

15TMBRC039

3.05

13.77

176.78

179.83

15TMBRC039

6.09

16.49

185.93

192.02

15TMBRC039

3.05

10.33

205.74

208.79

15TMBRC039

35.05

12.26

224.03

259.08

15TMBRC039

16.76

12.68

277.37

294.13

15TMBRC039

3.05

11.46

297.18

300.23

15TMBRC039

9.14

9.23

303.28

312.42

15TMBRC039

7.62

11.08

342.90

350.52

15TMBRC039

4.58

12.98

352.04

356.62

15TMBRC039

3.05

10.69

367.28

370.33

15TMBRC039

3.05

9.76

379.48

382.52

15TMBRC039

3.05

9.40

458.72

461.77

 

 

 

Table of Higher Grade Intervals (>15% CaF2)(2)

 

Drill Hole Number

Down Hole Thickness (m)

Grade Fluorspar CaF2%

From (m)

To (m)

15TMBRC036

3.05

17.01

150.88

153.92

15TMBRC036

3.05

17.78

156.97

160.02

15TMBRC036

3.05

16.29

202.69

205.74

15TMBRC036

3.05

15.36

259.08

262.13

15TMBRC036

16.76

16.81

387.10

403.86

15TMBRC036

3.04

16.85

432.82

435.86

15TMBRC039

6.09

16.49

185.93

192.02

15TMBRC039

4.57

15.45

225.55

230.12

15TMBRC039

7.62

15.86

251.46

259.08

15TMBRC039

10.67

15.25

277.37

288.04

15TMBRC039

3.05

16.80

353.57

356.62

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLAKPDQOBKDNBD
Date   Source Headline
16th Apr 20242:00 pmRNSDrilling - Konkola West Copper Project, Zambia
9th Apr 20249:48 amRNSDrill Start - Konkola West Copper Project, Zambia
29th Feb 20247:00 amRNSTotal Voting Rights
26th Feb 20247:00 amRNSAgreement with Mwashia Resources
15th Feb 20242:31 pmRNSGrant of Warrants
15th Feb 20249:41 amRNSComplete Results of AGM
14th Feb 20242:19 pmRNSResult of AGM
6th Feb 20241:58 pmRNSUpdate: KoBold's New Mingomba Copper Discovery
18th Jan 202410:00 amRNSAnnual Report & Notice of Annual General Meeting
15th Jan 202410:15 amRNSAudited Results for Year Ended 30 September 2023
19th Dec 20239:20 amRNSCompany Presentation via Investor Meet Company
19th Dec 20237:00 amRNSEarn-In Agreement - Konkola West Project, Zambia
30th Nov 20237:00 amRNSKonkola West Copper Project, Zambia
6th Nov 20237:00 amRNSProject Update, Zambia
1st Nov 20237:00 amRNSPlacing to raise £150,000
16th Oct 20237:00 amRNSNew Soil Sampling Results - Mushima North, Zambia
5th Oct 20237:00 amRNSFirst Soil Sampling Results - Mushima North
25th Sep 20237:00 amRNSTerm Sheet for Agreement - Konkola West, Zambia
12th Sep 202310:04 amRNSProvisional Soil Sampling Results - Mukai Project
7th Sep 20237:00 amRNSGovernment Decision - Storuman Project, Sweden
6th Sep 20237:00 amRNSGovernment Decision - Storuman Project, Sweden
24th Aug 20237:00 amRNSUpdated Company Presentation
10th Aug 20237:00 amRNSExploration Update – Zambia
3rd Aug 20233:09 pmRNSUK Government Press Release Supports Zambia Growth
31st Jul 20237:00 amRNSForest Permits Received - Mukai & Mushima North
13th Jun 20237:00 amRNSNew Exploration Licence – Zambia
6th Jun 20237:00 amRNSExploration Update - Konkola West, Zambia
1st Jun 20237:00 amRNSProject Focus – Mushima North Project, Zambia
30th May 20232:40 pmRNSHALF-YEARLY REPORT 2023
17th May 20232:02 pmRNSExploration Update – Lubuila Copper Project
28th Apr 20237:00 amRNSAnalytical Results - Mushima North Copper Project
20th Apr 202310:00 amRNSExploration Update – Lubuila Copper Project
13th Apr 20232:45 pmRNSPlacing to raise £250,000
5th Apr 202310:30 amRNSProject Focus - Mukai Project, Zambia
9th Mar 202311:05 amRNSSecond Price Monitoring Extn
9th Mar 202311:00 amRNSPrice Monitoring Extension
17th Feb 20233:52 pmRNSGrant of Warrants
16th Feb 202311:39 amRNSResult of AGM
16th Feb 20237:00 amRNSChairman’s AGM Statement
14th Feb 20233:46 pmRNSHolding(s) in Company
3rd Feb 20238:20 amRNSPlacing to raise £300,000
18th Jan 20237:00 amRNSPositive Lab Results, Jacks Copper Project, Zambia
16th Jan 20237:00 amRNSEPB Approved Mushima North Copper Project, Zambia
12th Jan 20237:00 amRNSProject Focus - Konkola West, Zambia
22nd Dec 20227:00 amRNSAnnual Report & Notice of Annual General Meeting
12th Dec 20227:00 amRNSAudited Results for Year Ended 30 September 2022
25th Nov 20227:00 amRNSUpdate - Copper Projects, Zambia
8th Nov 20227:00 amRNSExploration Update - Jacks Copper Project, Zambia
4th Nov 202210:52 amRNSJacks Copper Project Zambia - JV Agreement
1st Nov 20227:00 amRNSExploration Update – Brunton Pass Project, Nevada

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.