The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.10
Bid: 0.09
Ask: 0.11
Change: 0.00 (0.00%)
Spread: 0.02 (22.222%)
Open: 0.10
High: 0.10
Low: 0.10
Prev. Close: 0.10
TYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

16 Feb 2016 07:00

RNS Number : 1367P
Tertiary Minerals PLC
16 February 2016
 

 

Tertiary Minerals plc ("Tertiary" or "Company")

16 February 2016

MB Fluorspar Project Update

Completion and Results for Phase 4 Drilling

Tertiary Minerals plc, the AIM traded company building a strategic position in the fluorspar sector, is pleased to announce completion and receipt of analytical results from the Phase 4 drilling programme at its MB fluorspar project in Nevada, USA.

Highlights:

· Phase 4 drilling programme completed - 4 holes for a total of 1,553 metres drilled

 

· Thick intersections of fluorspar mineralisation encountered in step-out drilling - remains open at depth and along strike

 

· Hole 15TMBRC036 located west of the Western Area:

 

Ø 89.91m grading 12.02% CaF2 from 120.40m depth (total of 8 significant(1) fluorspar intersections)

 

· Including 31.99m grading 16.74% CaF2 from 150.88m (total of 6 higher grade(2) intersections above 15% CaF2)

 

· Hole 15TMBRC038 located to the north of the Western Area:

 

Ø 22.86m grading 11.47% CaF2 from 74.68m depth

 

· Hole 15TMBRC039 located to the north of the Western Area:

 

Ø 137.16m grading 11.54% CaF2 from 53.34m depth (total of 16 significant fluorspar intersections)

 

· Including 32.00m grading 15.81% CaF2 from 185.93m (total of 5 higher grade intersections above 15% CaF2)

 

· Ore-grade molybdenum (Mo) encountered in the base of hole 15TMBRC036 provides future exploration target.

 

Commenting today, Managing Director, Richard Clemmey said: "Results from the Phase 4 drilling programme continue to grow the known size of the MB deposit, proving both lateral and depth extension of significant fluorspar mineralisation in the Western Area which still remain open in all directions. We now look forward to incorporating these results into our economic evaluation of the project and progressing with the next phases of development this year"

An updated map showing the location of the completed Phase 4 drill holes is available on the Company's website:

http://www.tertiaryminerals.com/projects/fluorspar-projects/mb-fluorspar-nevada-usa

More detailed information and a complete tabulation of significant drilling results for drill holes 15TMBRC036 to 15TMBRC039 are given below. Reported thicknesses are believed to be approximate true thicknesses based on flat-lying mineralisation.

 

 

Enquiries

 

Tertiary Minerals plc

Richard Clemmey, Managing Director

Patrick Cheetham, Executive Chairman 

 

 

 

 

 

 

+44 (0)845 868 4580

SP Angel Corporate Finance LLP

Nominated Adviser & Joint Broker

Ewan Leggat/Tercel Moore

 

+44 (0) 20 3470 0470

 

Beaufort Securities Ltd

Joint Broker

Jon Belliss/Elliot Hance

 

 

+44 (0)20 7382 8300

Yellow Jersey PR Limited

Dominic Barretto/Aidan Stanley

 

+44 (0)7768 537 739

Detailed Information

 

Project Background

The MB Project claims are located in an area of good infrastructure 19km southwest of the County town of Eureka in central Nevada, USA. Nevada is long recognised as one of the most attractive mining jurisdictions in the world.

Since acquiring the project in late 2012, the Company has reached a number of important Mineral Resource definition milestones. Full details of the results from Phase 1, 2 and 3 drilling have been reported previously by the Company and resulted in the following maiden JORC(3) (2012 Edition) Mineral Resource Estimate and subsequent upgrade:

· Maiden JORC(3) Mineral Resource Estimate: 38.4 million tonnes grading 10.4% CaF2 - April 2014

· Upgraded JORC(3) Mineral Resource Estimate : 86.4 million tonnes grading 10.7% CaF2 - June 2015

Fluorspar mineralisation at the MB Project occurs over a vertical interval of at least 300m in Ordovician age Pogonip Limestone beneath a cap rock of Eureka Quartzite. It is associated with extensive skarn-type alternation of the host limestone. The footprint of the currently defined Mineral Resource is over one square kilometre (290 acres).

 

Geophysical Survey and Phase 4 Drilling

Following the completion of the JORC(3) (2012 Edition) Mineral Resource Estimate in June 2015 the Company completed a 166 line-km ground magnetic survey in order to gain an improved geological understanding of the fluorspar deposit and its geological controls. Subsequently, the Phase 4 drill programme was carried out during December 2015 and January 2016 and consisted of 4 holes totalling 1,553 metres.

The programme was successful in achieving its key objective to extend the lateral and depth extent of higher grade mineralisation in the newly discovered Western Area.

Drill Hole 15TMBRC036 is located approximately 190 metres to the west of the existing Mineral Resource boundary in the Western Area and was drilled to a depth of 484 metres. Multiple significant(1) and higher grade(2) fluorspar intersections encountered in this hole prove the lateral continuation of the fluorspar mineralisation to the west of the existing Mineral Resource boundary. The hole ends in fluorspar mineralisation grading 11.82% CaF2 and mineralisation is open at depth.

Drill Hole 15TMBRC037 is a step out hole located approximately 425 metres northwest of the existing Mineral Resource boundary of the Western Area and was drilled to a depth of 200 metres. The hole was drilled to test the northern extent of the fluorspar mineralisation in the Western Area but was terminated due to a change in lithology from limestone to barren granite. Further work is required to understand the nature of this granite intrusive in relation to the fluorspar mineralisation. It has been observed in historic drilling data that granite was encountered 366m southeast of this hole and acted as a cap to the fluorspar mineralisation which occurred at the lower contact of the granite and the host limestone. In hole 15TMBRC037 fluorspar mineralisation was limited to 4 individual 1.52 metre intersections above 9% fluorspar (CaF2) in the limestone above the granite.

Drill Hole 15TMBRC038 is located approximately 90 metres north from the existing Mineral Resource boundary of the Western Area and was drilled to a depth of 346 metres. A single, thick significant(1) fluorspar intersection was encountered in this hole which proves the continuation of the fluorspar mineralisation to the north of the existing Mineral Resource boundary.

Drill Hole 15TMBRC039 is located approximately 240m southeast of the deep step out hole 14TMBRC027 drilled in the Phase 3 programme, and was drilled to a depth of 523m. The hole was drilled to test the continuation of fluorspar mineralisation in the southern part of the Western Area. Multiple significant(1) and higher grade(2) fluorspar intersections encountered in this hole demonstrate the lateral continuation of the fluorspar mineralisation in the southern part of the Western Area.

Future Exploration Target

The fluorine endowment of the MB Project Area is extraordinary. Low grade fluorspar mineralisation is widespread outside of the higher grade intervals that are reported by the Company. For example, the entire thickness of the limestone intersected in hole 15TMBRC036, from beneath the quartzite cap rock to the base of hole, is mineralised to a greater or lesser degree and reports 334m grading nearly 6% fluorspar. Other holes are similarly mineralised.

Large volumes of fluorine, though rarely on this scale, are most commonly associated the Climax-type porphyry molybdenum (copper) mineral deposits where fluorine tends to form a halo above and around the molybdenum (copper) mineralisation.

Two results of special interest from the Phase 4 drill programme therefore were an intersection of potentially ore-grade molybdenum (Mo), 6.10 metres grading 0.14% MoS2, encountered at the base of hole 15TMBRC036 and an intersection of copper (Cu), 1.52 metres grading 0.11% Cu, at the base of the hole 16TMBRC38.

 

The Company believes that the newly intersected molybdenum and copper mineralisation may point to an underlying porphyry molybdenum-copper deposit and an exciting target for future exploration.

The Next Step

 

Following further evaluation of Phase 4 drilling results the priority for the Company is to move onto the next phases of development for the MB Project in 2016, including:

 

· Metallurgical testwork

· Economic modelling

· Scoping Study

· Mine Permit planning

 

Foot Notes

1. Significant fluorspar (CaF2) mineralisation is defined by the Company as a minimum three metre drill intersection above 9% fluorspar (CaF2) cut-off and containing a maximum three metre drill intersection below 9% fluorspar (CaF2) cut-off. This cut off is currently applied for reporting of the drill results from MB project as this is the cut-off used for the most recent Mineral Resource estimate. However, in the context of reporting drill results it does not imply an economic cut off. An economic cut-off will depend on many factors and will not be determined until feasibility studies, if warranted, are carried out.

 

2. Mineralisation having a weighted average grade of composite sample intervals greater than 15% CaF2.

 

3. JORC is the Australian Code for the reporting of exploration results, Mineral Resources and Ore Reserves prepared by the Joint Ores Reserves Committee (JORC) of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and the Minerals Council of Australia.

 

4. The information in this release has been compiled and reviewed by Mr. Richard Clemmey (BSc, CEng, MIQ, MIMMM, ARSM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Clemmey is a Chartered Engineer and a Member of the Institute of Materials, Minerals & Mining.

 

5. Cautionary Note: Traditional analytical methods measure fluorine content and the reported fluorite (CaF2, fluorspar) contents are calculated on the assumption that all fluorine is present as fluorite. However small amounts of fluorine can occur in mica and other minerals commonly present in skarn mineralised systems.

 

6. Fluorine analysis - Samples from all holes were submitted to Bureau Veritas Minerals Pty Ltd in Australia (ISO-17025 accredited) for analysis. All samples were analysed for fluorine using the fused bead X-ray fluorescence (XRF) method. The samples submitted included various known standards, blanks and field duplicates as a further QA/QC check on the results. The QA/QC checks on the results being reported today are all within acceptable limits and therefore the Company is able to release the data.

 

Notes to Editors

Tertiary Minerals plc (ticker symbol 'TYM') is an AIM-quoted mineral exploration and development company building a significant strategic position in the fluorspar sector. Fluorspar is an essential raw material in the chemical, steel and aluminium industries. Tertiary controls two significant Scandinavian projects (Storuman in Sweden and Lassedalen in Norway) and a large deposit of strategic significance in Nevada USA (MB Project).

 

Table of Significant(1) Drilling Results from Holes 15TMBRC036 to 15TMBRC039

Drill Hole Number

Down Hole Thickness (m)

Grade Fluorspar CaF2%

From (m)

To (m)

15TMBRC036

19.81

9.56

120.40

140.21

15TMBRC036

9.14

12.79

150.88

160.02

15TMBRC036

6.10

13.23

202.69

208.79

15TMBRC036

3.05

15.36

259.08

262.13

15TMBRC036

3.05

11.82

307.85

310.90

15TMBRC036

4.57

9.11

320.04

324.61

15TMBRC036

32.00

12.78

387.10

419.10

15TMBRC036

12.19

13.14

432.82

445.01

15TMBRC038

22.86

11.47

74.68

97.54

15TMBRC039

9.14

10.31

53.34

62.48

15TMBRC039

4.57

10.48

74.68

79.25

15TMBRC039

15.24

10.32

92.96

108.20

15TMBRC039

10.67

10.64

126.49

137.16

15TMBRC039

3.05

13.77

176.78

179.83

15TMBRC039

6.09

16.49

185.93

192.02

15TMBRC039

3.05

10.33

205.74

208.79

15TMBRC039

35.05

12.26

224.03

259.08

15TMBRC039

16.76

12.68

277.37

294.13

15TMBRC039

3.05

11.46

297.18

300.23

15TMBRC039

9.14

9.23

303.28

312.42

15TMBRC039

7.62

11.08

342.90

350.52

15TMBRC039

4.58

12.98

352.04

356.62

15TMBRC039

3.05

10.69

367.28

370.33

15TMBRC039

3.05

9.76

379.48

382.52

15TMBRC039

3.05

9.40

458.72

461.77

 

 

 

Table of Higher Grade Intervals (>15% CaF2)(2)

 

Drill Hole Number

Down Hole Thickness (m)

Grade Fluorspar CaF2%

From (m)

To (m)

15TMBRC036

3.05

17.01

150.88

153.92

15TMBRC036

3.05

17.78

156.97

160.02

15TMBRC036

3.05

16.29

202.69

205.74

15TMBRC036

3.05

15.36

259.08

262.13

15TMBRC036

16.76

16.81

387.10

403.86

15TMBRC036

3.04

16.85

432.82

435.86

15TMBRC039

6.09

16.49

185.93

192.02

15TMBRC039

4.57

15.45

225.55

230.12

15TMBRC039

7.62

15.86

251.46

259.08

15TMBRC039

10.67

15.25

277.37

288.04

15TMBRC039

3.05

16.80

353.57

356.62

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLAKPDQOBKDNBD
Date   Source Headline
15th Jul 20197:00 amRNSPaymaster Polymetallic Project Update
30th May 20191:30 pmRNSHalf-Yearly Report 2019
28th May 20197:00 amRNSNew Project Acquisition
28th Feb 20197:00 amRNSTotal Voting Rights
22nd Feb 20192:50 pmRNSDirector Dealing,Issue of Equity,TVR and Warrants
21st Feb 20194:29 pmRNSResult of AGM
21st Feb 20197:00 amRNSNew Project Acquisition and MB Project Update
25th Jan 20197:00 amRNSPlacing to Raise £250,000
14th Jan 20194:22 pmRNSStoruman Project Mine Permit Update
21st Dec 201810:00 amRNSPublication of Report & Accounts / Notice of GM
12th Dec 201810:15 amRNSAudited Results for the year to 30 September 2018
22nd Oct 20184:40 pmRNSSecond Price Monitoring Extn
22nd Oct 20184:35 pmRNSPrice Monitoring Extension
31st Aug 20187:00 amRNSTotal Voting Rights
20th Aug 201810:53 amRNSDirector Dealing, Issue of Equity and TVR
13th Jul 20182:29 pmRNSStoruman Project Mine Permit Update
22nd May 20189:21 amRNSHalf-Yearly Report 2018
17th Apr 20187:00 amRNSStoruman Project Mine Permit Update
2nd Mar 201812:47 pmRNSChange of Adviser
28th Feb 20187:00 amRNSTotal Voting Rights
1st Feb 20181:00 pmRNSDirector Dealing, Issue of Equity,TVR and Warrants
31st Jan 20184:23 pmRNSResult of AGM
25th Jan 20183:41 pmRNSHolding(s) in Company
29th Dec 20171:30 pmRNSTotal Voting Rights
22nd Dec 20177:00 amRNSPublication of Report and Accounts / Notice of AGM
13th Dec 20174:25 pmRNSAudited Results for the year to 30 September 2017
6th Dec 201710:41 amRNSPlacing raises £500,000
1st Dec 20174:18 pmRNSShare Price Movement
29th Nov 201710:51 amRNSDavid Whitehead
29th Nov 20177:00 amRNSTYM Partners with Global Commodities Trading Group
7th Nov 20177:00 amRNSTertiary Minerals Wins National Award in the USA
19th Oct 20177:00 amRNSCorporate and Operational Update
30th Jun 20177:00 amRNSTotal Voting Rights
26th May 20173:21 pmRNSHalf-Yearly Report 2017
26th May 20173:20 pmRNSPlacing to Raise £300,000
13th Apr 201710:14 amRNSResult of General Meeting / Share Division
28th Mar 20172:00 pmRNSProposed Subdivision of Share Capital and GM
22nd Mar 201712:13 pmRNSDirectors Dealings
21st Mar 20171:40 pmRNSHolding(s) in Company
21st Mar 201710:28 amRNSCompletion of Sale of Gold Assets
8th Feb 201711:12 amRNSHolding(s) in Company
1st Feb 20175:00 pmRNSShare and Warrant Issue & Total Voting Rights
1st Feb 20175:00 pmRNSIssue of Shares by Sunrise Resources PLC
1st Feb 20172:22 pmRNSDirector Dealing, Issue of Equity, TVR
31st Jan 20174:30 pmRNSResult of AGM
20th Jan 20171:02 pmRNSDirector/PDMR Shareholding
12th Jan 20177:00 amRNSAcquisition Opportunities
23rd Dec 20169:26 amRNSPublication of Report and Accounts / Notice of AGM
22nd Dec 20167:00 amRNSDirector's Dealing
15th Dec 201611:47 amRNSStoruman Mine Permit Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.