Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

18 Apr 2007 09:51

Empyrean Energy PLC18 April 2007 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Project Margarita, Gulf Coast Texas USA --------------------------------------- • Production commenced from the shallow well program.• One well (Milagro) connected to sales line with second (Dos Dedos)being connected.• Commencement of final wells shallow drilling program - drilling expected late May. AIM quoted Empyrean Energy PLC today announces the following update with regards the drilling program at Margarita: 1. El Viejito #1 Well The well flowed gas at a rate up to 210 mscfd within a 24 hour test period,however due to the high vertical permeability of the sands (atypical for thesesands) water influx from below the gas bearing interval gradually choked off gasflow reduce, due to the increased column of water within the production string.If the gas bearing interval had a base seal separating the gas and water thenthe zone would have been a good commercial producer. It was determined thatremedial work to prevent or inhibit water inflow was deemed to be unlikely tosucceed and not cost justifiable; therefore the well was suspended and can beused as a water disposal well for other joint venture wells in the area. 2. Dos Dedos # 1 Well The well is currently being prepared to be connected to a gas sales line andthis should be completed within a few days. It is proposed that the uppermostgas bearing sand in the well will commence production at 150,000 scfd. Probablereserves pertaining to this sand are of the order of 0.35 bcf gross gas. Furtherproduction and pressure data is required to more accurately predict potentialreserves. 3. Milagro #1 well The well was connected to a gas sales line on April 3, 2007 and has beenproducing at rates up to 384,000 scfd, averaging around 375,000 scfd. The wellis currently producing at 348,000 scfd with 1.67 bbls/d of oil. The prognosisfrom log analysis and sidewall cores is that the interval is oil bearing with ahigh gas oil ratio. This is based on a nearby analogue that produced 213,000barrels of oil and 0.3 bcf of gas. Initial flow from the analogue was almostentirely gas before oil flowed. At this time further production and pressuredata is required to more accurately predict potential reserves. Prior tocommencement of production, reservoir engineering analysis calculated potentialreserves within the feature at approx. gross 150,000 bbls oil and this wouldlikely take two wells to adequately recover these volumes. FINAL WELLS SHALLOW DRILLING PROGRAM Under the terms of the farmout agreement with Sun Resources NL a commercialsuccess in the initial 3 well shallow drilling program would trigger thedrilling of a further 3 shallow wells under the same terms. Empyrean will now contribute to the funding of the next three wells, Agavero #1,Dona Carlota #1 & Climaco #1 in the shallow drilling program and earn equityfrom each of the operating USA subsidiaries of Sun Resources, Victoria PetroleumNL ("Victoria") and Wandoo Energy LLC ("Wandoo"). The terms and conditions ofthe farmout are the same as the initial 3 well program with Empyrean earning a44% interest in these wells. The next 3 shallow prospects to be drilled are analogues of Frio and Vicksburgsand production in the area at depths less than 2,000 meters. The drillingprogram is expected to commence around mid May 2007 and run until the end ofJuly 2007. The prospects have the following mean reserve outcomes and totaldepths; Prospect Name Mean Reserves Total DepthAgavero 0.7 bcf 1,340 metresDona Carlota 0.8 1,525 metresClimaco 1.6 1,980 metres DEEP WELLS PROGRAM Conditional upon Empyrean exercising its option on completion of the remaining 3shallow wells, commencement of a deep drilling program on more substantialdeeper targets at the Cook Mountain Formation and Wilcox Formation levels isexpected to commence late September 2007. These prospects have potentialrecoverable gas volumes of 30 to 200 bcf unrisked. Participants in the Margarita Project are: Empyrean Energy PLC* 44.00%Sun Resources NL# 20.00%Victoria Petroleum NL# 20.00%Wandoo Energy LLC + 16.00% 100.00% # ASX listed* AIM listed+ USA Private Interest The information contained in this announcement was completed and reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information:Laurence Read/ Ed PortmanConduit PRTel: +44 (0) 207 429 6605/ +44 (0) 7979955923 Empyrean Energy plcTel : +44(0) 207 182 1746 Rod Venables/ Cecil JordaanHB CorporateTel: +44(0) 207 510 8600 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Dec 20107:00 amRNSHalf Yearly Report
20th Dec 20107:25 amRNSSugarloaf Project Operations Update
10th Dec 201011:01 amRNSSugarloaf Project Operations and Production Update
29th Nov 20107:00 amRNSSugarloaf Project, ("Sugarloaf"), Block B, Texas
23rd Nov 20107:27 amRNSSugarloaf Project ("Sugarloaf") Block B, Texas USA
18th Nov 20109:01 amRNSDraw down of Convertible Loan Facility
18th Nov 20107:00 amRNSChange of Adviser
9th Nov 20107:39 amRNSHercules Prospect, onshore Texas
5th Nov 20107:30 amRNSRiverbend Project, onshore Texas
3rd Nov 20107:00 amRNSNominated adviser and broker change of name
28th Oct 20101:09 pmRNSHolding(s) in Company
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
14th Oct 20107:41 amRNSSugarloaf Project Block B Update
23rd Sep 20107:24 amRNSSugarloaf Project Block B Update
13th Sep 20109:16 amRNSHolding(s) in Company
13th Sep 20107:29 amRNSRiverbend Project Update
8th Sep 20107:00 amRNSSugarloaf Project Block B Update
6th Sep 20107:05 amRNSHercules Prospect, BP America Well Update
20th Aug 20107:15 amRNSRiverbend Project Update
13th Aug 20107:45 amRNSSugarloaf Project Block B Update
13th Aug 20107:41 amRNSBulletin Board investigation
5th Aug 20107:41 amRNSSugarloaf Project Block B Update
15th Jul 20107:43 amRNSSugarloaf Project Block B Update
6th Jul 20107:58 amRNSSugarloaf Project Block B Update
2nd Jul 20107:55 amRNSSugarloaf Project Block B Update
28th Jun 201012:11 pmRNSDirector/PDMR Shareholding
23rd Jun 201010:16 amRNSResult of AGM
17th Jun 20107:58 amRNSHercules Prospect Update
8th Jun 20107:37 amRNSSugarloaf Project Block B Update
4th Jun 20107:00 amRNSSugarloaf Project Block B Update
1st Jun 20107:52 amRNSCartwright No.1 well spuds
28th May 201011:30 amRNSGrant of Options
28th May 20107:00 amRNSNotice of AGM
28th May 20107:00 amRNSFinal Results
21st May 20107:21 amRNSSugarloaf Project Block B Update
5th May 20107:20 amRNSSugarloaf Project Block B Update
4th May 20108:08 amRNSSugarloaf Project Block B Update
4th May 20108:05 amRNSGlantal Project
22nd Apr 20107:38 amRNSSugarloaf Project Block B Update
19th Apr 20107:58 amRNSSugarloaf Project Block B Update
14th Apr 20108:45 amRNSFurther Placing brings total raise to ?3.6 million
13th Apr 20107:42 amRNSSugarloaf Project Block B Update
9th Apr 201011:44 amRNSPlacing to raise ?1.5m announcement replacement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.