Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Sugarloaf Project Operations Update

20 Dec 2010 07:25

RNS Number : 2564Y
Empyrean Energy PLC
20 December 2010
 

 

20 December 2010

 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

 

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

 

 

Empyrean is pleased to provide the following update on operations at the Sugarloaf Project within the Sugarkane Gas & Condensate Field, Texas.

 

Luna-1H (3% WI)

 

The Luna-1H well has been on production for a period of 30 days and Empyrean is pleased to provide the market with an update on the produced volumes during that period

 

Total Gas Production (mmscf)

Total Condensate Production (bbls)

Average Daily Equivalent Gas Rate (mscfe/d)*

Average Daily Equivalent Oil Rate (boe/d)*

Luna-1H

61

21,570

11.17

931

·; The equivalent rates have been calculated to reflect value using a 12:1 conversion ratio for condensate and a 25% uplift on gas equivalent volumes due to the high calorific value of the produced gas.

This well continues to be produced on a small choke setting with limited tubing head pressure and production declines being observed. This has led to increases in production each time the choke is incrementally opened. The average production rate over the last 15 days of the reported 30 day period was 1,070 boe/d

 

Kowalik-1R (10.2% WI)

This well is presently cleaning up to sales following the recent workover. Consistent with other Sugarloaf wells the Kowalik-1R well is being produced on a restricted choke setting in order to minimise decline rates and maximise recoverable volumes for each well. The well commenced flowing to sales on 11th December and the following early production data is based on the last 24 hours and provides an indication of recent flowrates from the well.

Gas Production Rate (mscf/d)

Condensate Production Rate (bbls/d)

Average Daily Equivalent Gas Rate (mscfe/d)*

Average Daily Equivalent Oil Rate (boe/d)*

Kowalik -1R

1,895

537

8,810

735

 

Urrutia-1H (3% WI)

Following a fracture stimulation of 19 stages across approximately 4,400 ft of horizontal section this well has been cleaned up to sales since the 12th December. Consistent with other recent wells the Urrutia-1H well has been produced on a restricted choke setting in order to minimise decline rates and maximise recoverable volumes for each well. The following early production data is based on the last 24 hours and provides an indication of early flowrates from the well.

Gas Production Rate (mscf/d)

Condensate Production Rate (bbls/d)

Average Daily Equivalent Gas Rate (mscfe/d)*

Average Daily Equivalent Oil Rate (boe/d)*

Urrutia #1H

1,940

752

11,450

954

 

Direct Assets-1H (3% WI)

Whilst running the isolation plug after the 10th stimulation stage on this well the assembly became stuck and remedial operations are presently underway to remove this and allow the remaining 3 stages to be stimulated. Once complete the well will be cleaned up to sales.

 

Gilley-1H (3% WI)

Drilling operations are now complete with TD being reached at a depth of 16,969 ft. Casing is presently being run and cemented in place to secure 4,200 ft of horizontal reservoir section. Empyrean will provide further updates on this well once stimulation activity has commenced.

 

 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

 

 

 

Contact:

 

Empyrean Energy Plc

Tom Kelly Tel: +618 9388 8041

 

Shore Capital & Corporate Limited

Anita Ghanekar Tel: +44 (0) 20 7408 4090

Edward Mansfield

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLIFFDFFLIFII
Date   Source Headline
5th Jun 20268:47 amRNSExecution of Mako Offshore Drilling Rig Contract
8th May 202610:07 amRNSMako Gas Project Update
30th Apr 20268:43 amRNSMako Gas Project Update
14th Apr 20261:51 pmRNSConvertible Note Amendment
3rd Mar 20267:00 amRNSFinal Investment Decision Approved
27th Feb 20267:00 amRNSCEO Appointment and Board Composition Review
23rd Feb 20268:10 amRNSCash Call dispute Settlement Finalised
13th Feb 20267:00 amRNSChange of Registered Office Address
30th Jan 20267:00 amRNSDuyung PSC Update
11th Dec 20258:59 amRNSInterim Results
19th Nov 20258:00 amRNSConrad Secures Farm Down and Funding for Mako
18th Nov 20258:06 amRNSDuyung PSC Update
13th Nov 20259:26 amRNSHolding(s) in Company
11th Nov 202511:42 amRNSDuyung PSC Update
30th Oct 202510:42 amRNSHolding(s) in Company
30th Sep 20252:19 pmRNSResults of Annual General Meeting
22nd Sep 20257:00 amRNSHolding(s) in Company
3rd Sep 20252:11 pmRNSPosting of Notice of Annual General Meeting
2nd Sep 20251:39 pmRNSHolding(s) in Company
1st Sep 20251:30 pmRNSFinal Results
1st Sep 20251:26 pmRNSHolding(s) in Company
29th Aug 20258:22 amRNSHolding(s) in Company
27th Aug 20259:54 amRNSHolding(s) in Company
26th Aug 20257:00 amRNSPassing Of Tom Kelly, Managing Director/CEO
29th Jul 202512:08 pmRNSHolding(s) in Company
21st Jul 20259:12 amRNSFundraising
21st Jul 20257:00 amRNSHolding(s) in Company
21st Jul 20257:00 amRNSFundraising
17th Jul 20258:47 amRNSGas Sale Agreement Signed with PLN EPI
4th Jun 20253:40 pmRNSHolding(s) in Company
21st May 20254:47 pmRNSHolding(s) in Company
14th May 20258:28 amRNSWilson River-1 DST Operations Results
1st May 20259:27 amRNSResult of Retail Offer
28th Apr 20259:20 amRNSRetail Offer
28th Apr 20259:14 amRNSFundraising
25th Apr 20259:29 amRNSDST operations to commence early May
10th Apr 20257:00 amRNSHolding(s) in Company
2nd Apr 20257:00 amRNSDST to be conducted over potential oil zone
31st Mar 20259:30 amRNSHolding(s) in Company
25th Mar 20257:04 amRNSWilson River-1 Drilling Update
17th Mar 20257:00 amRNSHolding(s) in Company
14th Mar 20257:14 amRNSDrilling of Wilson River-1 well commences
12th Mar 20257:00 amRNSMako PSC Revised Gas Sales Arrangements
11th Mar 20257:00 amRNSWilson River-1 drill preparations update
10th Mar 202510:44 amRNSResults of General Meeting
7th Mar 20257:00 amRNSWilson River-1 Farm in Agreement signed
18th Feb 20257:00 amRNSPosting of Notice of General Meeting
17th Feb 20259:51 amRNSWilson River-1 well update
11th Feb 20257:00 amRNS£625,000 Placing
6th Feb 20251:49 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.