Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

18 Apr 2007 09:51

Empyrean Energy PLC18 April 2007 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Project Margarita, Gulf Coast Texas USA --------------------------------------- • Production commenced from the shallow well program.• One well (Milagro) connected to sales line with second (Dos Dedos)being connected.• Commencement of final wells shallow drilling program - drilling expected late May. AIM quoted Empyrean Energy PLC today announces the following update with regards the drilling program at Margarita: 1. El Viejito #1 Well The well flowed gas at a rate up to 210 mscfd within a 24 hour test period,however due to the high vertical permeability of the sands (atypical for thesesands) water influx from below the gas bearing interval gradually choked off gasflow reduce, due to the increased column of water within the production string.If the gas bearing interval had a base seal separating the gas and water thenthe zone would have been a good commercial producer. It was determined thatremedial work to prevent or inhibit water inflow was deemed to be unlikely tosucceed and not cost justifiable; therefore the well was suspended and can beused as a water disposal well for other joint venture wells in the area. 2. Dos Dedos # 1 Well The well is currently being prepared to be connected to a gas sales line andthis should be completed within a few days. It is proposed that the uppermostgas bearing sand in the well will commence production at 150,000 scfd. Probablereserves pertaining to this sand are of the order of 0.35 bcf gross gas. Furtherproduction and pressure data is required to more accurately predict potentialreserves. 3. Milagro #1 well The well was connected to a gas sales line on April 3, 2007 and has beenproducing at rates up to 384,000 scfd, averaging around 375,000 scfd. The wellis currently producing at 348,000 scfd with 1.67 bbls/d of oil. The prognosisfrom log analysis and sidewall cores is that the interval is oil bearing with ahigh gas oil ratio. This is based on a nearby analogue that produced 213,000barrels of oil and 0.3 bcf of gas. Initial flow from the analogue was almostentirely gas before oil flowed. At this time further production and pressuredata is required to more accurately predict potential reserves. Prior tocommencement of production, reservoir engineering analysis calculated potentialreserves within the feature at approx. gross 150,000 bbls oil and this wouldlikely take two wells to adequately recover these volumes. FINAL WELLS SHALLOW DRILLING PROGRAM Under the terms of the farmout agreement with Sun Resources NL a commercialsuccess in the initial 3 well shallow drilling program would trigger thedrilling of a further 3 shallow wells under the same terms. Empyrean will now contribute to the funding of the next three wells, Agavero #1,Dona Carlota #1 & Climaco #1 in the shallow drilling program and earn equityfrom each of the operating USA subsidiaries of Sun Resources, Victoria PetroleumNL ("Victoria") and Wandoo Energy LLC ("Wandoo"). The terms and conditions ofthe farmout are the same as the initial 3 well program with Empyrean earning a44% interest in these wells. The next 3 shallow prospects to be drilled are analogues of Frio and Vicksburgsand production in the area at depths less than 2,000 meters. The drillingprogram is expected to commence around mid May 2007 and run until the end ofJuly 2007. The prospects have the following mean reserve outcomes and totaldepths; Prospect Name Mean Reserves Total DepthAgavero 0.7 bcf 1,340 metresDona Carlota 0.8 1,525 metresClimaco 1.6 1,980 metres DEEP WELLS PROGRAM Conditional upon Empyrean exercising its option on completion of the remaining 3shallow wells, commencement of a deep drilling program on more substantialdeeper targets at the Cook Mountain Formation and Wilcox Formation levels isexpected to commence late September 2007. These prospects have potentialrecoverable gas volumes of 30 to 200 bcf unrisked. Participants in the Margarita Project are: Empyrean Energy PLC* 44.00%Sun Resources NL# 20.00%Victoria Petroleum NL# 20.00%Wandoo Energy LLC + 16.00% 100.00% # ASX listed* AIM listed+ USA Private Interest The information contained in this announcement was completed and reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information:Laurence Read/ Ed PortmanConduit PRTel: +44 (0) 207 429 6605/ +44 (0) 7979955923 Empyrean Energy plcTel : +44(0) 207 182 1746 Rod Venables/ Cecil JordaanHB CorporateTel: +44(0) 207 510 8600 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
12th Sep 20138:00 amRNSSugarloaf: Marathon permit update
14th Aug 20132:22 pmRNSHolding(s) in Company
14th Aug 201311:45 amRNSExercise of Options
8th Aug 20138:15 amRNSAppointment of Public Relations Company
8th Aug 20137:45 amRNSSugarloaf: Marathon Update
2nd Aug 20138:30 amRNSSugarloaf: Hedging contract with Macquarie Bank
1st Aug 20138:15 amRNSSugarloaf - Production and Operational Update
26th Jul 20137:00 amRNSPrincipal Office Change
2nd Jul 20133:56 pmRNSResult of AGM and General Meeting
2nd Jul 20131:16 pmRNSAGM Presentation
2nd Jul 20137:00 amRNSFacility repayment
18th Jun 201311:02 amRNSHolding(s) in Company
14th Jun 201310:08 amRNSNotice of General Meeting
11th Jun 201312:35 pmRNSHolding(s) in Company
10th Jun 20138:35 amRNSInvestor presentation
3rd Jun 20131:13 pmRNSNotice of AGM
29th May 20138:30 amRNSOperations Update: Riverbend Project
15th May 20138:00 amRNSFinal Results
1st May 20134:52 pmRNSOperations Update
1st May 20137:30 amRNSOperational Update
30th Apr 20134:26 pmRNSOperational Update
19th Apr 20137:00 amRNSProduction and Operational Update
28th Mar 20137:02 amRNSDrawndown under Macquarie debt facility
25th Mar 20138:00 amRNSEagle Oil Pool Development Project
6th Mar 20138:30 amRNSOperational Update: Sugarloaf Project
26th Feb 20131:51 pmRNSOperational Update
19th Feb 20138:30 amRNSProduction and Operational update
4th Feb 20138:30 amRNSReplacement: Production and Operational update
1st Feb 201310:32 amRNSProduction and Operational Update
7th Jan 201310:53 amRNSConversion of Loan
21st Dec 20127:00 amRNSHalf Yearly Report
14th Dec 20127:33 amRNSIndependent Reserves Report
13th Dec 20128:02 amRNSSugarloaf Production Update
6th Dec 20122:49 pmRNSClarification: Drawdown Convertible Loan Facility
22nd Nov 20127:42 amRNSFurther re Appointment of PR
15th Nov 20127:30 amRNSSugarloaf Production Update
14th Nov 201210:43 amRNSConversion of Loan
31st Oct 20123:44 pmRNSTotal Voting Rights
24th Oct 20129:00 amRNSInvestor Presentation
22nd Oct 20127:00 amRNSAppointment of PR
17th Oct 201211:38 amRNSConversion of Loan
9th Oct 20127:00 amRNSSugarloaf Production Update
21st Sep 20127:00 amRNSSugarloaf Production Update
17th Aug 20129:00 amRNSSugarloaf Production Update
16th Aug 20127:39 amRNSFurther re: US$50m Debt Facility
30th Jul 20128:43 amRNSDirector/PDMR Shareholding
27th Jul 20128:05 amRNSSugarloaf Production Update
26th Jul 20127:56 amRNSTrading Statement
15th Jun 20127:00 amRNSFurther re: US$50m Debt Facility
31st May 20122:32 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.