Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

18 Apr 2007 09:51

Empyrean Energy PLC18 April 2007 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Project Margarita, Gulf Coast Texas USA --------------------------------------- • Production commenced from the shallow well program.• One well (Milagro) connected to sales line with second (Dos Dedos)being connected.• Commencement of final wells shallow drilling program - drilling expected late May. AIM quoted Empyrean Energy PLC today announces the following update with regards the drilling program at Margarita: 1. El Viejito #1 Well The well flowed gas at a rate up to 210 mscfd within a 24 hour test period,however due to the high vertical permeability of the sands (atypical for thesesands) water influx from below the gas bearing interval gradually choked off gasflow reduce, due to the increased column of water within the production string.If the gas bearing interval had a base seal separating the gas and water thenthe zone would have been a good commercial producer. It was determined thatremedial work to prevent or inhibit water inflow was deemed to be unlikely tosucceed and not cost justifiable; therefore the well was suspended and can beused as a water disposal well for other joint venture wells in the area. 2. Dos Dedos # 1 Well The well is currently being prepared to be connected to a gas sales line andthis should be completed within a few days. It is proposed that the uppermostgas bearing sand in the well will commence production at 150,000 scfd. Probablereserves pertaining to this sand are of the order of 0.35 bcf gross gas. Furtherproduction and pressure data is required to more accurately predict potentialreserves. 3. Milagro #1 well The well was connected to a gas sales line on April 3, 2007 and has beenproducing at rates up to 384,000 scfd, averaging around 375,000 scfd. The wellis currently producing at 348,000 scfd with 1.67 bbls/d of oil. The prognosisfrom log analysis and sidewall cores is that the interval is oil bearing with ahigh gas oil ratio. This is based on a nearby analogue that produced 213,000barrels of oil and 0.3 bcf of gas. Initial flow from the analogue was almostentirely gas before oil flowed. At this time further production and pressuredata is required to more accurately predict potential reserves. Prior tocommencement of production, reservoir engineering analysis calculated potentialreserves within the feature at approx. gross 150,000 bbls oil and this wouldlikely take two wells to adequately recover these volumes. FINAL WELLS SHALLOW DRILLING PROGRAM Under the terms of the farmout agreement with Sun Resources NL a commercialsuccess in the initial 3 well shallow drilling program would trigger thedrilling of a further 3 shallow wells under the same terms. Empyrean will now contribute to the funding of the next three wells, Agavero #1,Dona Carlota #1 & Climaco #1 in the shallow drilling program and earn equityfrom each of the operating USA subsidiaries of Sun Resources, Victoria PetroleumNL ("Victoria") and Wandoo Energy LLC ("Wandoo"). The terms and conditions ofthe farmout are the same as the initial 3 well program with Empyrean earning a44% interest in these wells. The next 3 shallow prospects to be drilled are analogues of Frio and Vicksburgsand production in the area at depths less than 2,000 meters. The drillingprogram is expected to commence around mid May 2007 and run until the end ofJuly 2007. The prospects have the following mean reserve outcomes and totaldepths; Prospect Name Mean Reserves Total DepthAgavero 0.7 bcf 1,340 metresDona Carlota 0.8 1,525 metresClimaco 1.6 1,980 metres DEEP WELLS PROGRAM Conditional upon Empyrean exercising its option on completion of the remaining 3shallow wells, commencement of a deep drilling program on more substantialdeeper targets at the Cook Mountain Formation and Wilcox Formation levels isexpected to commence late September 2007. These prospects have potentialrecoverable gas volumes of 30 to 200 bcf unrisked. Participants in the Margarita Project are: Empyrean Energy PLC* 44.00%Sun Resources NL# 20.00%Victoria Petroleum NL# 20.00%Wandoo Energy LLC + 16.00% 100.00% # ASX listed* AIM listed+ USA Private Interest The information contained in this announcement was completed and reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information:Laurence Read/ Ed PortmanConduit PRTel: +44 (0) 207 429 6605/ +44 (0) 7979955923 Empyrean Energy plcTel : +44(0) 207 182 1746 Rod Venables/ Cecil JordaanHB CorporateTel: +44(0) 207 510 8600 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Apr 20107:00 amRNSPlacing to raise ?1.5m
1st Apr 20101:03 pmRNSSugarloaf Project Block B Update
1st Apr 20107:35 amRNSConvertible Loan Facility
30th Mar 20107:40 amRNSRiverbend Project Quinn-3H Well Update
26th Mar 20107:37 amRNSHercules Prospect Update
25th Mar 20107:39 amRNSSugarloaf Project Block B Update
17th Mar 20107:42 amRNSAquarius Prospect, McMillan Well Update
17th Mar 20107:38 amRNSSugarloaf Project Block B Update
16th Mar 20102:33 pmRNSExercise of Options and Director Shareholdings
9th Mar 20107:41 amRNSBP America well reaches total depth on Hercules
9th Mar 20107:38 amRNSMcMillan Well spuds on the Aquarius Prospect
3rd Mar 20107:38 amRNSSugarloaf Project, Block B Update
24th Feb 20107:36 amRNSSugarloaf Project, Block B Update
23rd Feb 20107:42 amRNSHercules Prospect Update
19th Feb 20107:37 amRNSSugarloaf Project, Block B, Update
5th Feb 20108:08 amRNSSugarloaf Project Block B Update
4th Feb 20107:52 amRNSRiverbend Project, onshore Texas, USA
1st Feb 20107:38 amRNSSugarloaf Project Update
28th Jan 20107:34 amRNSSugarloaf Project Update
22nd Jan 20107:41 amRNSSugarloaf Project Update
15th Jan 20107:21 amRNSSugarloaf Project, Block B, Update
13th Jan 20109:00 amRNSRiverbend Project, onshore Texas, USA
7th Jan 20108:05 amRNSKowalik-1H update and new well preparations
30th Dec 20097:00 amRNSKowalik-1H Fracture Stimulation Program
23rd Dec 20098:23 amRNSSugarloaf Project, Block B, Texas USA
15th Dec 20097:39 amRNSParticipation in 10% of Aquarius Prject, Texas
10th Dec 20097:41 amRNSParticipation in 10% of Hercules Prospect, Texas
4th Dec 20093:21 pmRNSInterim Results
19th Nov 20097:00 amRNSSugarloaf Block B Update
16th Nov 20097:00 amRNSDrilling Report
10th Nov 20097:00 amRNSDrilling Report
30th Oct 20099:44 amRNSHolding(s) in Company
28th Oct 200910:01 amRNSHolding(s) in Company
6th Oct 20097:17 amRNSSugarloaf Block B Work Program
1st Oct 20099:01 amRNSHolding(s) in Company
21st Sep 20097:51 amRNSFarm-out of Block B Sugarloaf
18th Sep 20097:53 amRNSUpdate Eagle Oil Pool Development Project
10th Sep 200910:22 amRNSHolding(s) in Company
3rd Sep 20097:47 amRNSRiverbend Project commencement of operations
1st Sep 200910:43 amRNSHolding(s) in Company
17th Aug 20098:14 amRNSRiverbend Project update
13th Jul 200910:32 amRNSExercise of Options
8th Jul 200911:30 amRNSHolding(s) in Company
3rd Jul 20092:16 pmRNSResult of AGM
15th Jun 20097:00 amRNSChange of Name of Nominated Adviser and Broker
9th Jun 20099:59 amRNSHolding(s) in Company
8th Jun 20093:57 pmRNSNotice of AGM
4th Jun 20097:00 amRNSIssue of Equity
1st Jun 20098:19 amRNSPlacing of ?816,000, Farm-in to Riverbend Project
26th May 200912:20 pmRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.