1 Apr 2010 13:03
Β
Empyrean Energy PLC
('Empyrean' or the 'Company', (EME))
Β
Sugarloaf Project, Block B, onshore Texas, USA.
Β
Β
Empyrean Energy Plc is pleased to provide the market with the following update of operations on Block B at the Sugarloaf Project:
Β
Morgan -1H
Β
Operations on this well are now complete and the rig has demobilised from the location. The well was drilled to a total depth of 17,015 ft and production casing has now been run and cemented across approximately 5,000 ft of reservoir section. This well is now ready for fracture stimulation.
Β
Rancho Grande -1H
Β
This well was spudded on 25 March 2010 and the most recent operation has been to run and cement the surface casing string at a depth of 6,005 ft. Thereafter the well will be drilled vertically to the top of the reservoir before the trajectory is built to horizontal through the reservoir section.
Β
Easley -1H
Β
As previously reported this well has had a production casing string run and cemented in place and is waiting on the commencement of fracture stimulation operations. It will then be flowed to sales.
Β
The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.
Β
Contact:
Β
Tom Kelly Empyrean Energy Plc Tel: +618 93216988
Β
Nominated Adviser and Broker:
Β
Jerry Keen Astaire Securities Plc Tel: +44 (0) 20 7448 4400
Shane Gallwey Astaire Securities Plc Tel: +44 (0) 20 7448 4400
Β
Β
Follow the stocks