Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Sugarloaf Project Block B Update

14 Oct 2010 07:41

RNS Number : 3769U
Empyrean Energy PLC
14 October 2010
Β 

ο»Ώ

Β 

14 October 2010

Β 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

Β 

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

Β 

Β 

Empyrean is pleased to provide the following update on operations at the Sugarloaf Project within the Sugarkane Gas & Condensate Field, Texas.

Β 

Luna-1H

As reported previously, this well was drilled to a depth of 17,370 ft, providing approximately 5,000 ft of horizontal section within the reservoir. The well will be fracture stimulated in due course, in a similar fashion to the other wells within the Eagle Ford Shale trend. This is the second post farmout well within the Sugarloaf Project in which Empyrean has participated.

Β 

May -1H

This well has now been drilled and cemented at a final depth of 17,550 ft, providing approximately 5,000 ft of horizontal section within the reservoir. The well will be fracture stimulated in due course, in a similar fashion to the other wells within the Eagle Ford Shale trend. This is the third post farmout well within the Sugarloaf Project in which Empyrean has participated.

Β 

Urrutia-1H

The fourth post farmout well within the Sugarloaf Project, Urrutia-1H, has now been drilled to a final depth of 17,411 ft. Preparations are presently underway to run and cement casing which will secure approximately 5,000 ft of horizontal section within the reservoir. Again this well will be fracture stimulated in a similar fashion to the other wells within the Eagle Ford Shale trend.

Β 

Direct Assets-1H

The fifth post farmout well within the Sugarloaf Project, Direct Assets -1H, was spudded on the 30th September 2010 and is presently starting to drill the horizontal section of the well.

Β 

Kowalik-1R

The fracture stimulation of the Kowalik-1R well was suspended having completed 14 fracture stimulation stages following difficulties in gaining access into the well at a depth of approximately 7,500 ft. Further investigation has revealed damage to the casing although pressure integrity has been maintained. A remedial repair is planned for the damaged casing and then the well will be produced to sales from the existing 14 stages. Empyrean will provide the market with an update when the well has cleaned up.

Β 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

Β 

Β 

Β 

Contact:

Β 

Tom Kelly Empyrean Energy plc Tel: (+61) 8 9321 6988Β 

Β 

Nominated Adviser and Broker:

Β 

Shane Gallwey Astaire Securities Plc Tel: (+44) 207 492 4750

Β 

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLUSONRRKARARA
Date   Source Headline
5th Jun 20268:47 amRNSExecution of Mako Offshore Drilling Rig Contract
8th May 202610:07 amRNSMako Gas Project Update
30th Apr 20268:43 amRNSMako Gas Project Update
14th Apr 20261:51 pmRNSConvertible Note Amendment
3rd Mar 20267:00 amRNSFinal Investment Decision Approved
27th Feb 20267:00 amRNSCEO Appointment and Board Composition Review
23rd Feb 20268:10 amRNSCash Call dispute Settlement Finalised
13th Feb 20267:00 amRNSChange of Registered Office Address
30th Jan 20267:00 amRNSDuyung PSC Update
11th Dec 20258:59 amRNSInterim Results
19th Nov 20258:00 amRNSConrad Secures Farm Down and Funding for Mako
18th Nov 20258:06 amRNSDuyung PSC Update
13th Nov 20259:26 amRNSHolding(s) in Company
11th Nov 202511:42 amRNSDuyung PSC Update
30th Oct 202510:42 amRNSHolding(s) in Company
30th Sep 20252:19 pmRNSResults of Annual General Meeting
22nd Sep 20257:00 amRNSHolding(s) in Company
3rd Sep 20252:11 pmRNSPosting of Notice of Annual General Meeting
2nd Sep 20251:39 pmRNSHolding(s) in Company
1st Sep 20251:30 pmRNSFinal Results
1st Sep 20251:26 pmRNSHolding(s) in Company
29th Aug 20258:22 amRNSHolding(s) in Company
27th Aug 20259:54 amRNSHolding(s) in Company
26th Aug 20257:00 amRNSPassing Of Tom Kelly, Managing Director/CEO
29th Jul 202512:08 pmRNSHolding(s) in Company
21st Jul 20259:12 amRNSFundraising
21st Jul 20257:00 amRNSHolding(s) in Company
21st Jul 20257:00 amRNSFundraising
17th Jul 20258:47 amRNSGas Sale Agreement Signed with PLN EPI
4th Jun 20253:40 pmRNSHolding(s) in Company
21st May 20254:47 pmRNSHolding(s) in Company
14th May 20258:28 amRNSWilson River-1 DST Operations Results
1st May 20259:27 amRNSResult of Retail Offer
28th Apr 20259:20 amRNSRetail Offer
28th Apr 20259:14 amRNSFundraising
25th Apr 20259:29 amRNSDST operations to commence early May
10th Apr 20257:00 amRNSHolding(s) in Company
2nd Apr 20257:00 amRNSDST to be conducted over potential oil zone
31st Mar 20259:30 amRNSHolding(s) in Company
25th Mar 20257:04 amRNSWilson River-1 Drilling Update
17th Mar 20257:00 amRNSHolding(s) in Company
14th Mar 20257:14 amRNSDrilling of Wilson River-1 well commences
12th Mar 20257:00 amRNSMako PSC Revised Gas Sales Arrangements
11th Mar 20257:00 amRNSWilson River-1 drill preparations update
10th Mar 202510:44 amRNSResults of General Meeting
7th Mar 20257:00 amRNSWilson River-1 Farm in Agreement signed
18th Feb 20257:00 amRNSPosting of Notice of General Meeting
17th Feb 20259:51 amRNSWilson River-1 well update
11th Feb 20257:00 amRNS£625,000 Placing
6th Feb 20251:49 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.