The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.525
Bid: 1.45
Ask: 1.60
Change: 0.00 (0.00%)
Spread: 0.15 (10.345%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 1.525
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

High Grade Copper Mineralisation at BKZ Deposit

30 Sep 2021 09:30

RNS Number : 5399N
Asiamet Resources Limited
30 September 2021
 

30 September 2021

 

Asiamet Extends High Grade Copper Mineralisation at BKZ Deposit

 

Asiamet Resources Limited ("Asiamet" or the "Company") is pleased to announce initial assay results from the first three holes of the 2021 resource extension and exploration drilling program in progress on its 100% owned KSK Contract of Work (KSK CoW) located in Central Kalimantan, Indonesia. Seven holes (1,482m) of a planned 3000 metre program have been completed to date with assay results pending for a further four holes. Full results have also been received for the recently completed Induced Polarisation (IP) geophysical survey undertaken to extend coverage to the north and northwest of the BKM deposit inclusive of BKZ and the link between the two deposits.

 

Highlights.

 

Drilling: Assays results have been received from the first three drill holes of the current resource expansion drill program being undertaken at the BKM and BKZ deposits. All three of the initial drill holes completed at BKZ intersected significant intervals of high grade copper and zinc mineralisation which extend the deposit. Mineralisation remains open to the east, west and at depth and further drilling is in progress to continue expanding the Resource.

 

· BKZ33550-04

· 19.3 metres @ 1.37% Zn, 0.4% Pb from 20 metres

· including 11 metres @ 1.99% Zn from 25 metres

· 27 metres @ 1.17% Cu, 0.45% Zn, from 75.5 metres,

· including 10 metres @ 2.57% Cu and 1% Zn, 9.8 ppm Ag from 89.5 metres

· BKZ33650-07

· 34.5 metres @ 1.2% Cu from 103 metres.

· BKZ33650-08

· 13 metres @ 12.9% Zn, 0.79% Cu, 4.88% Pb, 71ppm Ag from 61.5 metres.

· 34 metres @ 1.0% Cu from 88.5 metres

· including 9 metres @ 2.2% Cu from 110.5 metres

 

 

Geophysics: A recently completed Induced Polarization (IP) survey covering the northern extension of the BKM deposit and the BKZ deposit and surrounds has defined priority targets as follows.

 

· Strong IP chargeability anomaly beneath BKZ deposit supports potential for lower copper zone mineralisation to extend to +400 metres depth

· New high potential targets outlined immediately to the west of BKZ associated with a continuous near surface shallow IP chargeability high

 

Figure 1 - Beruang Kanan Project Copper in Soils showing 2019 BKM Feasibility Study Pit Outline and 2021 Drill Targets To view the image please click on the following link https://asiametresources.com/wp-content/uploads/2021/09/Figure-1-1-3.jpg

 

BKZ Drilling

 

Holes BKZ33650-07 and BKZ33650-08 were drilled to test the western and eastern extension of copper mineralisation intersected in previous drillhole BKZ33650-02 which returned 6.4 metres @ 1.57% Cu at the bottom of hole and was interpreted to have terminated in the BKZ - Lower Copper Zone (LCZ) (Figure 2). Assay results received from recent drill holes BKZ33650-07 (34.5 metres @ 1.2% Cu from 103 metres) and BKZ33650-08 (34 metres @ 1.01% Cu from 88.5 metres) have validated this interpretation and extend the lower copper zone in this area. The Upper Polymetallic zone (UPZ) was also intersected in BKZ33650-08 returning 13 metres @ 12.9% Zn, 4.9% Pb, 0.79% Cu and 70 g/t Ag from 61.5 metres and extending UPZ mineralisation to the east. High grade mineralisation in both the LCZ and the UPZ remains open to the east, west and to depth. Additional drilling to continue expanding these zones is in progress.

 

Figure 2 : BKZ 9933650N Resource Extension Drill Targets. To view the image please click on the following link https://asiametresources.com/wp-content/uploads/2021/09/Figure-2-1.jpg

 

Hole BKZ33550-04 was drilled with the objective of testing the western extension of the Lower Copper Zone (LCZ) previously intersected in hole BKZ33550-02 (35 metres @ 1.18% Cu) (Figure 3). Drilling intersected 27 metres @ 1.17% Cu and 0.45% Zn from 75.5m, including 10 metres @ 2.57% Cu and 1% Zn, extending the LCZ to the west of the current Resource envelope. The Upper Polymetallic Zone (UPZ) was also intersected, returning 19.3 metres @ 1.37% Zn, 0.4 % Pb from 20 metres. Both the UPZ and the LCZ mineralisation remain open and additional drilling is planned.

 

Figure 3 : BKZ 9933550N Resource Extension Targets. To view the image please click on the following link https://asiametresources.com/wp-content/uploads/2021/09/Figure-3-1.jpg

 

Induced Polarisation (IP) Survey

 

In July 2021, a 29.6km IP survey was completed to extend coverage to the north and northwest of the BKM project including the BKZ mineralisation and the link between the BKM and BKZ deposits which are now interpreted to be part of the same three kilometre long Volcanogenic Hosted Massive Sulphide (VHMS) mineral system. Previous IP surveys over BKM outlined a strong correlation between chargeability highs and stockwork hosted copper mineralisation, thus providing an important targeting tool for mineralisation in and around the known deposits at BKM and BKZ.

 

The on-site survey work, and the subsequent data analysis and report generation was completed by the exploration division of PT Geoservices, a well-recognised and long-standing provider of exploration, analytical and laboratory services to the Indonesian mining industry. The Geoservices final report has been reviewed in detail by PT KSK personnel and specialist consultants.

 

Results from the new survey outline three distinct chargeability highs north of BKM (Figure 4).

 

(i) Anomaly 1 - A discrete chargeability high which correlates directly to the known Zn-Cu sulphide mineralisation at BKZ. The anomaly plunges at an angle of 50 degrees to the east, to depth of +400 metres. Drilling to date has tested this anomaly to approximately 100-150 metres depth. A second drill rig has been mobilised to BKZ to test this target down to 400 metres.

(ii) Anomalies 2 & 3 - Two distinct IP chargeability anomalies were delineated 1.5 to 2 kilometres to the west of BKZ in a different volcanic package. These two anomalies are part of a continuous near surface shallow chargeability high. Geological mapping and sampling investigations are underway to evaluate potential drill targets in this area.

Figure 4 Induced Polarisation Chargeability Map showing IP anomalies . To view the image please click on the following link https://asiametresources.com/wp-content/uploads/2021/09/Figure-4-1.jpg

 

Tony Manini, Asiamet's Executive Chairman commented:

"We are very pleased with the initial results from the 2021 drilling program at BKZ. Drilling based on our updated interpretations has delivered strong copper, zinc and lead intercepts which extend the current deposit and demonstrate potential for a significantly bigger system. This growth potential is also supported by the new IP geophysics which indicates that the lower copper zone mineralisation at BKZ is plunging easterly for up to 400m below current drilling. Mineralisation at BKZ remains open in most directions and will almost certainly continue to grow. This modest drill program is already delivering outstanding results that meet our stated objective of factually demonstrating the upside potential for a larger, longer life project at KSK as we advance the project financing and development stage. Drilling is continuing at both BKZ and BKM and we look forward to reporting further results as they come to hand."

 

Qualified Persons

Data disclosed in this press release has been reviewed and verified by ARS's qualified person, Patrick Creenaune, Chief Geologist, FAIG (Fellow Australian Institute of Geoscientists), an advisor to the Company and a Qualified Person within the meaning of JORC (2012) and for the purposes of the AIM Rules for Companies.

 

ON BEHALF OF THE BOARD OF DIRECTORS

Tony Manini, Executive Chairman

For further information, please contact:-Ends-

 

Tony ManiniExecutive Chairman, Asiamet Resources LimitedEmail: tony.manini@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com / info@asiametresources.com 

Asiamet Resources Nominated AdviserRFC Ambrian Limited

Bhavesh Patel / Stephen Allen

Telephone: +44 (0)20 3440 6800

Email: Bhavesh.Patel@rfcambrian.com / Stephen.Allen@rfcambrian.com 

 

Optiva Securities LimitedChristian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

Follow us on twitter @AsiametTweets

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSDESASEFSEEU
Date   Source Headline
13th Nov 20178:40 amEQSAsiamet Extends High Grade Copper Mineralisation Beneath BKZ Zn-Pb-Cu-Ag-Au Deposit
1st Nov 201711:32 amEQSAsiamet Intersects High Grade Copper Below BKZ Polymetallic Deposit
25th Oct 20177:02 amEQSAsiamet Appoints Ausenco
20th Oct 20179:02 amEQSAsiamet Resources Ltd.: Broker Warrants Exercised
18th Oct 20177:02 amEQS30m of 8.3% Zinc at BKZ and Extends High Grade Polymetallic Discovery
11th Oct 20177:02 amEQSExceptional Zn-Pb-Ag-Au Drill Results Upgrade Potential of BKZ Discovery
9th Oct 201712:26 pmEQSAsiamet Resources Ltd.: Grant of Options
6th Oct 201711:16 amEQSBKM Copper Project Feasibility Study Advancing
3rd Oct 20177:02 amEQSAsiamet Resources Ltd.: Asiamet Drilling Expands High Grade Zinc Rich Polymetallic Mineralisation at BKZ
15th Sep 20178:57 amRNSHalf-Year Results 2017 with Management Comments
12th Oct 20167:00 amPRNDirector/PDMR Shareholding
12th Oct 20167:00 amPRNDrilling/Production Report
1st Apr 20157:00 amBUSAGM Statement
15th Jan 20157:00 amBUSAcquisition
29th Dec 20147:00 amBUSIssue of Equity
28th Nov 20147:00 amBUS3rd Quarter Results
26th Nov 20147:00 amBUSKalimantan Gold Positions for Growth
5th Nov 20147:00 amBUSKalimantan Gold Files Technical Report for the Beruang Kanan Prospect, KSK CoW, Indonesia
8th Oct 20147:00 amBUSKalimantan Gold Options Granted
3rd Oct 20145:24 pmBUSTransaction in Own Shares
1st Oct 20147:00 amBUSTransaction in Own Shares
26th Sep 20147:00 amBUSKalimantan Gold Announces Maiden Inferred Mineral Resource Estimate for Beruang Kanan Prospect, KSK CoW, Indonesia
1st Sep 20147:00 amBUSHalf-yearly Report
31st Jul 20147:00 amBUSKSK Copper Project Update
4th Jul 20146:24 pmBUSAGM Statement
3rd Jul 20147:00 amBUSAGM Statement
2nd Jun 20147:00 amBUS1st Quarter Results
16th May 20147:00 amBUSNotice of AGM
30th Apr 20147:00 amBUSAnnual Financial Report
16th Apr 20147:00 amBUSKalimantan Gold Board Changes
26th Mar 20147:00 amBUSKalimantan Gold - Jelai Gold Project
2nd Jan 20147:00 amBUSKalimantan Gold to Regain 100% Control of KSK CoW, Indonesia
10th Dec 20137:00 amBUSKalimantan Gold Clarifies Previous Disclosure Following a Preliminary Technical Disclosure Review By BCSC
29th Nov 20137:00 amBUS3rd Quarter Results
27th Nov 20137:00 amBUSKalimantan Gold Files NI43-101 Report for Jelai Project
12th Nov 20137:00 amBUSKSK Copper Project Update
8th Oct 20137:00 amBUSKalimantan Gold Appoints New CFO
6th Sep 20137:00 amBUSKalimantan’s Chairman, Peter Pollard, increases share position
29th Aug 20137:00 amBUSHalf-yearly Report
22nd Aug 20137:00 amBUSKalimantan Gold - KSK Copper Project Update
4th Jul 20137:00 amBUSKalimantan Gold Board Changes and Option Grant
10th Jun 20137:00 amBUSKSK Copper Project Update
29th May 20137:00 amBUS1st Quarter Results
24th May 20137:00 amBUSNotice of AGM
9th May 20137:00 amBUSKalimantan Gold – New Permit Extends Drilling to All Targeted Areas on the KSK Contract of Work; Progress Made at Jelai
29th Apr 20137:00 amBUSAnnual Financial Report
15th Apr 20137:00 amBUSKalimantan Gold Board Changes and Advance Notice Policy Adopted
19th Feb 20137:00 amBUSKSK Copper Project - High Grade Drilling Results and Major 2013 Drill Program Underway
15th Nov 20127:00 amBUS3rd Quarter Results
14th Nov 20127:00 amBUSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.