The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.10 (8.333%)
Open: 1.25
High: 1.275
Low: 1.25
Prev. Close: 1.25
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

High Grade Copper Mineralisation at BKZ Deposit

30 Sep 2021 09:30

RNS Number : 5399N
Asiamet Resources Limited
30 September 2021
 

30 September 2021

 

Asiamet Extends High Grade Copper Mineralisation at BKZ Deposit

 

Asiamet Resources Limited ("Asiamet" or the "Company") is pleased to announce initial assay results from the first three holes of the 2021 resource extension and exploration drilling program in progress on its 100% owned KSK Contract of Work (KSK CoW) located in Central Kalimantan, Indonesia. Seven holes (1,482m) of a planned 3000 metre program have been completed to date with assay results pending for a further four holes. Full results have also been received for the recently completed Induced Polarisation (IP) geophysical survey undertaken to extend coverage to the north and northwest of the BKM deposit inclusive of BKZ and the link between the two deposits.

 

Highlights.

 

Drilling: Assays results have been received from the first three drill holes of the current resource expansion drill program being undertaken at the BKM and BKZ deposits. All three of the initial drill holes completed at BKZ intersected significant intervals of high grade copper and zinc mineralisation which extend the deposit. Mineralisation remains open to the east, west and at depth and further drilling is in progress to continue expanding the Resource.

 

· BKZ33550-04

· 19.3 metres @ 1.37% Zn, 0.4% Pb from 20 metres

· including 11 metres @ 1.99% Zn from 25 metres

· 27 metres @ 1.17% Cu, 0.45% Zn, from 75.5 metres,

· including 10 metres @ 2.57% Cu and 1% Zn, 9.8 ppm Ag from 89.5 metres

· BKZ33650-07

· 34.5 metres @ 1.2% Cu from 103 metres.

· BKZ33650-08

· 13 metres @ 12.9% Zn, 0.79% Cu, 4.88% Pb, 71ppm Ag from 61.5 metres.

· 34 metres @ 1.0% Cu from 88.5 metres

· including 9 metres @ 2.2% Cu from 110.5 metres

 

 

Geophysics: A recently completed Induced Polarization (IP) survey covering the northern extension of the BKM deposit and the BKZ deposit and surrounds has defined priority targets as follows.

 

· Strong IP chargeability anomaly beneath BKZ deposit supports potential for lower copper zone mineralisation to extend to +400 metres depth

· New high potential targets outlined immediately to the west of BKZ associated with a continuous near surface shallow IP chargeability high

 

Figure 1 - Beruang Kanan Project Copper in Soils showing 2019 BKM Feasibility Study Pit Outline and 2021 Drill Targets To view the image please click on the following link https://asiametresources.com/wp-content/uploads/2021/09/Figure-1-1-3.jpg

 

BKZ Drilling

 

Holes BKZ33650-07 and BKZ33650-08 were drilled to test the western and eastern extension of copper mineralisation intersected in previous drillhole BKZ33650-02 which returned 6.4 metres @ 1.57% Cu at the bottom of hole and was interpreted to have terminated in the BKZ - Lower Copper Zone (LCZ) (Figure 2). Assay results received from recent drill holes BKZ33650-07 (34.5 metres @ 1.2% Cu from 103 metres) and BKZ33650-08 (34 metres @ 1.01% Cu from 88.5 metres) have validated this interpretation and extend the lower copper zone in this area. The Upper Polymetallic zone (UPZ) was also intersected in BKZ33650-08 returning 13 metres @ 12.9% Zn, 4.9% Pb, 0.79% Cu and 70 g/t Ag from 61.5 metres and extending UPZ mineralisation to the east. High grade mineralisation in both the LCZ and the UPZ remains open to the east, west and to depth. Additional drilling to continue expanding these zones is in progress.

 

Figure 2 : BKZ 9933650N Resource Extension Drill Targets. To view the image please click on the following link https://asiametresources.com/wp-content/uploads/2021/09/Figure-2-1.jpg

 

Hole BKZ33550-04 was drilled with the objective of testing the western extension of the Lower Copper Zone (LCZ) previously intersected in hole BKZ33550-02 (35 metres @ 1.18% Cu) (Figure 3). Drilling intersected 27 metres @ 1.17% Cu and 0.45% Zn from 75.5m, including 10 metres @ 2.57% Cu and 1% Zn, extending the LCZ to the west of the current Resource envelope. The Upper Polymetallic Zone (UPZ) was also intersected, returning 19.3 metres @ 1.37% Zn, 0.4 % Pb from 20 metres. Both the UPZ and the LCZ mineralisation remain open and additional drilling is planned.

 

Figure 3 : BKZ 9933550N Resource Extension Targets. To view the image please click on the following link https://asiametresources.com/wp-content/uploads/2021/09/Figure-3-1.jpg

 

Induced Polarisation (IP) Survey

 

In July 2021, a 29.6km IP survey was completed to extend coverage to the north and northwest of the BKM project including the BKZ mineralisation and the link between the BKM and BKZ deposits which are now interpreted to be part of the same three kilometre long Volcanogenic Hosted Massive Sulphide (VHMS) mineral system. Previous IP surveys over BKM outlined a strong correlation between chargeability highs and stockwork hosted copper mineralisation, thus providing an important targeting tool for mineralisation in and around the known deposits at BKM and BKZ.

 

The on-site survey work, and the subsequent data analysis and report generation was completed by the exploration division of PT Geoservices, a well-recognised and long-standing provider of exploration, analytical and laboratory services to the Indonesian mining industry. The Geoservices final report has been reviewed in detail by PT KSK personnel and specialist consultants.

 

Results from the new survey outline three distinct chargeability highs north of BKM (Figure 4).

 

(i) Anomaly 1 - A discrete chargeability high which correlates directly to the known Zn-Cu sulphide mineralisation at BKZ. The anomaly plunges at an angle of 50 degrees to the east, to depth of +400 metres. Drilling to date has tested this anomaly to approximately 100-150 metres depth. A second drill rig has been mobilised to BKZ to test this target down to 400 metres.

(ii) Anomalies 2 & 3 - Two distinct IP chargeability anomalies were delineated 1.5 to 2 kilometres to the west of BKZ in a different volcanic package. These two anomalies are part of a continuous near surface shallow chargeability high. Geological mapping and sampling investigations are underway to evaluate potential drill targets in this area.

Figure 4 Induced Polarisation Chargeability Map showing IP anomalies . To view the image please click on the following link https://asiametresources.com/wp-content/uploads/2021/09/Figure-4-1.jpg

 

Tony Manini, Asiamet's Executive Chairman commented:

"We are very pleased with the initial results from the 2021 drilling program at BKZ. Drilling based on our updated interpretations has delivered strong copper, zinc and lead intercepts which extend the current deposit and demonstrate potential for a significantly bigger system. This growth potential is also supported by the new IP geophysics which indicates that the lower copper zone mineralisation at BKZ is plunging easterly for up to 400m below current drilling. Mineralisation at BKZ remains open in most directions and will almost certainly continue to grow. This modest drill program is already delivering outstanding results that meet our stated objective of factually demonstrating the upside potential for a larger, longer life project at KSK as we advance the project financing and development stage. Drilling is continuing at both BKZ and BKM and we look forward to reporting further results as they come to hand."

 

Qualified Persons

Data disclosed in this press release has been reviewed and verified by ARS's qualified person, Patrick Creenaune, Chief Geologist, FAIG (Fellow Australian Institute of Geoscientists), an advisor to the Company and a Qualified Person within the meaning of JORC (2012) and for the purposes of the AIM Rules for Companies.

 

ON BEHALF OF THE BOARD OF DIRECTORS

Tony Manini, Executive Chairman

For further information, please contact:-Ends-

 

Tony ManiniExecutive Chairman, Asiamet Resources LimitedEmail: tony.manini@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com / info@asiametresources.com 

Asiamet Resources Nominated AdviserRFC Ambrian Limited

Bhavesh Patel / Stephen Allen

Telephone: +44 (0)20 3440 6800

Email: Bhavesh.Patel@rfcambrian.com / Stephen.Allen@rfcambrian.com 

 

Optiva Securities LimitedChristian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

Follow us on twitter @AsiametTweets

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSDESASEFSEEU
Date   Source Headline
9th May 202411:45 amRNS2023 Annual Report & Financial Statements
17th Apr 20247:00 amRNSBKM High Grade Copper Rock Sample Results
28th Mar 20247:00 amRNSBKM Project Engineering Design & Execution Update
27th Mar 20247:00 amRNSSustainable Power Solution for BKM Copper Project
1st Mar 20247:04 amRNSCorporate Update
28th Dec 20237:00 amRNSEnd of Year Project Status Update
20th Dec 20232:30 pmRNSShare Purchase by CEO
15th Nov 20237:00 amRNSStrategic c.US$4.0 million Financing
30th Oct 20237:05 amRNSCorporate Update
30th Oct 20237:05 amRNSBoard Changes
6th Oct 20237:00 amRNSCorporate Update
27th Sep 20238:15 amRNS2023 Interim Report & Financial Statements
22nd Sep 20237:00 amRNSBoard Changes
1st Sep 20237:00 amRNSChange of Nominated Adviser
11th Aug 20231:46 pmRNSCorrection - Director Fees and Employee Payments
8th Aug 20238:10 amRNSCorporate Update – Project Financing
13th Jul 20233:00 pmRNSDirectors Fees and Employee Incentive Payments
27th Jun 20237:45 amRNSNotification of Major Shareholding
23rd Jun 20237:10 amRNSExecutive Chairman IGTV Interview
13th Jun 20233:55 pmRNSResult of AGM
12th Jun 20237:15 amRNSCorporate Update - Advisors Appointed
19th May 20238:25 amRNSShare Purchase by CEO
12th May 20235:00 pmRNSNotice of Annual General Meeting
10th May 202310:30 amRNSUpdated BKM FS Delivers Excellent Economics
10th May 202310:30 amRNSUpdated BKM Ore Reserve
27th Apr 20233:58 pmRNS2022 Annual Report & Financial Statements
6th Apr 202311:30 amRNSCEO Podcast – Feasibility Study progress
29th Mar 202311:06 amRNS121 Conference Hong Kong Investor Presentation
20th Mar 20237:00 amRNSBKM Copper Project Update - Capital Cost Estimate
10th Feb 20237:00 amRNSBKM Copper Project FS Activities Update
13th Jan 20232:05 pmRNSSecond Price Monitoring Extn
13th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSMoU signed with BGRIMM Technology Group
30th Dec 20227:00 amRNSBusiness Update & 2022 Overview
9th Dec 202212:45 pmRNSShare Purchase by CEO
30th Nov 20222:15 pmRNSShare Purchase by CEO
25th Nov 20223:16 pmEQSAsiamet Resources CEO talks latest work on updated feasibility study for BKM copper project
18th Nov 202210:00 amRNSMines and Money Conference and Investor Evening
18th Nov 20227:00 amRNS2022 FS Update Life of Mine Production Physicals
15th Nov 20221:40 pmRNSHolding(s) in Company
14th Nov 20227:00 amRNSPositive Results for Key Inputs to 2022 FS Update
7th Nov 20229:30 amRNSPT Delta Dunia Makmur Increases Strategic Stake
20th Oct 20227:00 amRNSBKM Copper Project Power Solution Progressing
26th Sep 20229:39 amRNSCEO Video Presentation
24th Aug 202211:11 amRNSCEO Video Presentation – Feasibility Study Update
17th Aug 202210:45 amRNSInterim Report & Financial Statements
25th Jul 20222:15 pmRNS2021 Directors Fees
13th Jul 20226:00 pmRNSResult of AGM
6th Jul 20227:00 amRNSAnnual General Meeting – Update
29th Jun 20227:00 amRNSDOID Diligence for BKM Copper Project Complete

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.