We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.825
Bid: 0.80
Ask: 0.85
Change: 0.00 (0.00%)
Spread: 0.05 (6.25%)
Open: 0.825
High: 0.875
Low: 0.825
Prev. Close: 0.825
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

BKM Copper Project FS Activities Update

10 Feb 2023 07:00

RNS Number : 5661P
Asiamet Resources Limited
10 February 2023
 

10 February 2023

 

Asiamet Resources - BKM Copper Project FS Activities Update

 

Asiamet Resources Limited ("Asiamet" or "the Company") is pleased to provide an update on recent works undertaken to finalise various components of the Feasibility Study Update (FS Update) for the BKM Copper Project, located in Central Kalimantan, Indonesia.

During the latter part of December 2022 and through to the current year to date these activities include:

 

1. Logistics & Site Access

The Asiamet CEO and members of BUMA's[1] Infrastructure Construction team completed a week-long visit to Central Kalimantan to undertake the following activities:

· Site assessment of the main container port facility at Bagendang on the Mentaya river and meeting with Port Management.

· A full assessment of roads for the proposed logistics route from the container port to the proposed BKM mine-site.

· Assessment of several site areas related positioning of infrastructure.

· Inspection and assessment of the main access road with representatives of the forestry contractor responsible for road corridor construction and maintenance.

· Inspection of national highway road construction on key sections that will form part of the logistics corridor to the BKM site.

These assessments have provided a strong level of confidence in the proposed approach to transport and logistics for the project.

 

2. Site Survey

KSK's survey services partner PT Enmintech have completed two key scopes of survey work.

· Unmanned Aerial Vehicle ("UAV") LIDAR survey of the Heap Leach Facility and Non-Process Infrastructure area to update the current LIDAR survey for detailed design and to confirm current topography to ensure accuracy of current earthworks designs.

· Geophysical study using non-invasive Passive Seismic Horizontal-to-Vertical Spectral Ratio ("HVSR") across the Heap Leach Facility and Non-Process Infrastructure area. This study will provide detail of subsurface geology across the entire area related to key infrastructure development. Importantly this work delivers more detailed information on the ground conditions to be encountered during earthworks on the project.

 

3. Capital Cost Estimate

This critical workstream utilised specialist service providers based in Australia, China and Indonesia for initial inputs. In early January comparative proposals were received from an additional in-country service provider capable of delivering several key packages within the BKM Processing Plant flowsheet. High-confidence estimates were received in a short space of time, and these have been very positive for the capital cost of the project relative to original inputs. Final cost information is expected shortly, and once received these will complete the BKM Copper Project capital cost update, a key requirement for completion of the Feasibility Study economics.

 

4. Power

· PLN (the Indonesian State Electricity Company) delivered an assessment of the powerline route, capital costs and possible tariff arrangements for connection of the BKM Project to the Kalimantan grid network. The proposal is currently being reviewed and a final meeting will be held to close out any outstanding items.

· Further discussions were held with the providers of a Biomass Power Station option for the supply of power to the BKM project via a dedicated transmission line. Some additional data has been requested, however overall, the study into the feasibility of this power option has provided attractive economics. Power generation via biomass is common at Palm Oil Mills across Indonesia.

 

Remaining workstreams of a technical nature have also been completed or are in the process of being completed to close out requirements in the relevant Feasibility Study chapters. Key outcomes from technical studies that could have impacted Capital or Operating Cost estimates have been completed such that these will not hold up completion of financial modelling.

The Company expects to be able to present the full outcomes of the FS Update soon upon completion and collation of these final workstreams.

 

Darryn McClelland, Chief Executive Officer commented:

"The back end of December, through the Christmas-New Year period and into 2023 has been an extremely busy period for the BKM Copper Feasibility Study update. A number of activities continued through the holiday period which has enabled earlier completion of several key inputs. Our early engagement with the bank Independent Technical Expert ("ITE") helped focus a number of work streams and the level of work performed by our engineering teams and consulting partners is delivering very robust feasibility study outcomes. We are making excellent use of new data available and generating improved information and interpretations via current work programs to deliver a high confidence level study.

The final updates and reviews of the pre-production Capital Cost for the project are expected to be finalised shortly. Engaging a new in-country group capable of supplying and installing major parts of the BKM processing plant at highly competitive pricing at this time has meant a short extension to our delivery date, however, from what we are seeing, it is clear the outcomes from this additional engagement have delivered significant benefits in terms of savings to the capital cost estimate and has helped mitigate the inflationary pressures being experienced by projects globally.

The final aspect of the operating cost inputs for the Feasibility Study economics is the Mining Operational Services scope which is being undertaken by BUMA and the first draft of these cost estimates is imminent. This final piece of the overall cost model will need to be reviewed thoroughly with BUMA prior to input into the BFS financial model. At the completion of these reviews and following board approvals, we look forward to sharing the financial outcomes of the BKM Copper FS.

We are very pleased with the way the BKM Copper Project FS update has progressed over the last 6 months and are looking forward to presenting the outcomes and forward plans for the project on release of the FS Executive Summary, which will be accompanied by a Webinar with a Q&A session."

 

ON BEHALF OF THE BOARD OF DIRECTORS

Darryn McClelland, Chief Executive Officer

For further information, please contact:-Ends-

Darryn McClelland Chief Executive Officer, Asiamet Resources LimitedEmail: darryn.mcclelland@asiametresources.com

 

Tony Manini Executive Chairman, Asiamet Resources LimitedEmail: tony.manini@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com / info@asiametresources.com

Asiamet Resources Nominated Adviser RFC Ambrian Limited

Bhavesh Patel / Stephen Allen

Telephone: +44 (0)20 3440 6800

Email: Bhavesh.Patel@rfcambrian.com / Stephen.Allen@rfcambrian.com

 

Optiva Securities Limited Christian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

 

Follow us on twitter @AsiametTweets

 

FORWARD-LOOKING STATEMENT

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

 

 

 


[1] BUMA ("PT Bukit Makmur Mandiri Utama") is an operating subsidiary of publicly-listed Indonesian company, PT Delta Dunia Makmur Tbk ("DOID")

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDQBLBFXLLEBBQ
Date   Source Headline
17th Apr 20247:00 amRNSBKM High Grade Copper Rock Sample Results
28th Mar 20247:00 amRNSBKM Project Engineering Design & Execution Update
27th Mar 20247:00 amRNSSustainable Power Solution for BKM Copper Project
1st Mar 20247:04 amRNSCorporate Update
28th Dec 20237:00 amRNSEnd of Year Project Status Update
20th Dec 20232:30 pmRNSShare Purchase by CEO
15th Nov 20237:00 amRNSStrategic c.US$4.0 million Financing
30th Oct 20237:05 amRNSCorporate Update
30th Oct 20237:05 amRNSBoard Changes
6th Oct 20237:00 amRNSCorporate Update
27th Sep 20238:15 amRNS2023 Interim Report & Financial Statements
22nd Sep 20237:00 amRNSBoard Changes
1st Sep 20237:00 amRNSChange of Nominated Adviser
11th Aug 20231:46 pmRNSCorrection - Director Fees and Employee Payments
8th Aug 20238:10 amRNSCorporate Update – Project Financing
13th Jul 20233:00 pmRNSDirectors Fees and Employee Incentive Payments
27th Jun 20237:45 amRNSNotification of Major Shareholding
23rd Jun 20237:10 amRNSExecutive Chairman IGTV Interview
13th Jun 20233:55 pmRNSResult of AGM
12th Jun 20237:15 amRNSCorporate Update - Advisors Appointed
19th May 20238:25 amRNSShare Purchase by CEO
12th May 20235:00 pmRNSNotice of Annual General Meeting
10th May 202310:30 amRNSUpdated BKM FS Delivers Excellent Economics
10th May 202310:30 amRNSUpdated BKM Ore Reserve
27th Apr 20233:58 pmRNS2022 Annual Report & Financial Statements
6th Apr 202311:30 amRNSCEO Podcast – Feasibility Study progress
29th Mar 202311:06 amRNS121 Conference Hong Kong Investor Presentation
20th Mar 20237:00 amRNSBKM Copper Project Update - Capital Cost Estimate
10th Feb 20237:00 amRNSBKM Copper Project FS Activities Update
13th Jan 20232:05 pmRNSSecond Price Monitoring Extn
13th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSMoU signed with BGRIMM Technology Group
30th Dec 20227:00 amRNSBusiness Update & 2022 Overview
9th Dec 202212:45 pmRNSShare Purchase by CEO
30th Nov 20222:15 pmRNSShare Purchase by CEO
25th Nov 20223:16 pmEQSAsiamet Resources CEO talks latest work on updated feasibility study for BKM copper project
18th Nov 202210:00 amRNSMines and Money Conference and Investor Evening
18th Nov 20227:00 amRNS2022 FS Update Life of Mine Production Physicals
15th Nov 20221:40 pmRNSHolding(s) in Company
14th Nov 20227:00 amRNSPositive Results for Key Inputs to 2022 FS Update
7th Nov 20229:30 amRNSPT Delta Dunia Makmur Increases Strategic Stake
20th Oct 20227:00 amRNSBKM Copper Project Power Solution Progressing
26th Sep 20229:39 amRNSCEO Video Presentation
24th Aug 202211:11 amRNSCEO Video Presentation – Feasibility Study Update
17th Aug 202210:45 amRNSInterim Report & Financial Statements
25th Jul 20222:15 pmRNS2021 Directors Fees
13th Jul 20226:00 pmRNSResult of AGM
6th Jul 20227:00 amRNSAnnual General Meeting – Update
29th Jun 20227:00 amRNSDOID Diligence for BKM Copper Project Complete
31st May 20223:30 pmRNSNotice of Annual General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.