Highest grade silver-copper intersection to date4 Feb 2026 07:19
Big news from TYM confirming today that its Exploration Target is planned to be released in the coming weeks. CEO quote below from RNS:
"We are delighted to report these results from the four holes of our Phase 3 drilling programme conducted at the start of the rainy season late last year. These results include our best intersection of silver-copper mineralisation to date on this project, with 97m at 85 g/t silver equivalent (1.42% copper equivalent) from only 6m depth. In addition, this also includes our best higher-grade copper intersection to date: 13m at 77 g/t silver and 1.46% copper (2.80% copper equivalent) from 84m downhole. These results have also further tested the depth extension of mineralisation, with our longest silver mineralisation intersect to date from 6m below surface to 103m depth (vertically).
"These results further support our bulk tonnage, open pit silver exploration model and the target area remains open to the northwest, south/southwest and at depth. These results will now be incorporated into the on-going JORC Exploration Target work to provide an estimation of the range of tonnages and grades for Target A1.
"The Exploration Target is planned to be released in the coming weeks and will form the basis of future planned programmes to commence at the start of the dry season this year and will support our aim of producing a Maiden Mineral Resource Estimate by the end of 2026.
Highlights from the RNS:
The laboratory analytical results indicate further high-grade silver and copper mineralisation in the north of Target A1, which has a mineralisation footprint of 450m by up to 400m wide area, and remains open to the northwest, south/southeast and at depth.
Mushima North is located in the prospective Iron-Oxide-Copper-Gold region of Zambia. Target A1 is a polymetallic, silver-copper-zinc prospect located 28km to the east of the historic Kalengwa copper-silver mine which is currently under redevelopment and is one of several targets to be evaluated at the Project.
Ø Drill intersections include (downhole widths, true widths unknown):
o 97m at 56 g/t Ag, 0.43% Cu and 0.19% Zn (85 g/t Ag equivalent or 1.42% Cu equivalent) from 6m downhole (hole 25TMNRC-043). Including:
§ 42m at 81 g/t Ag, 0.70% Cu and 0.24% Zn from 55m downhole, and
§ 27m at 98 g/t Ag, 0.91% Cu and 0.25% Zn from 70m downhole, and
§ 13m at 77 g/t Ag, 1.46% Cu and 0.23% Zn (168 g/t Ag equivalent or 2.80% Cu equivalent) from 84m downhole.
o 11m at 18 g/t Ag, 0.18% Cu and 0.20% Zn (32 g/t Ag equivalent or 0.54% Cu equivalent) from 20m downhole (hole 25TMNRC-044).
o 17m at 14 g/t Ag, 0.25% Cu and 0.41% Zn (36 g/t Ag equivalent or 0.60% Cu equivalent) from 51m downhole (hole 25TMNRC-044).
Ø Best copper drill intersection to date: 13m at 1.46% Cu (2.80% Cu equivalent) from 84m, with individual metre samples of up to 3.17% Cu (hole 25TMNRC-043).