Blencowe Resources: Aspiring to become one of the largest graphite producers in the world. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.10 (8.333%)
Open: 1.25
High: 1.275
Low: 1.25
Prev. Close: 1.25
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

BKM Copper Project Feasibility Study Advancing

6 Oct 2017 11:16

Asiamet Resources Ltd. (ARS) BKM Copper Project Feasibility Study Advancing 06-Oct-2017 / 11:15 GMT/BST Dissemination of a Regulatory Announcement, transmitted by EQS Group. The issuer is solely responsible for the content of this announcement.


 

 

For Immediate Release London AIM

 

6 October 2017 Symbol: ARS

 

 

 

Asiamet BKM Copper Project Feasibility Study Advancing

 

Excellent progress continues to be made on the Beruang Kanan Main ("BKM") Feasibility Study, encompassing all technical, commercial, environmental and community disciplines.

Focus in the period since our recent successful capital raising has been as follows:

Mining and metallurgical engineering activity has been advancing through design and analytical work, utilising the recently updated BKM Resource information The metallurgical test-work program has significantly advanced through the column leaching phase and complementary laboratory work including physical (hydrodynamic) leach pad modelling to support leach pad optimisation has been initiated Shortlisted service providers covering the process engineering, power supply, and water management components of the BFS are being evaluated. Preferred vendors will be engaged shortly to accelerate these aspects of the study

Mine Engineering

Mine engineering activities ramping-up: Australian Mine Design and Development ("AMDAD") were engaged in 2016 to undertake the mining engineering components of the Feasibility Study. AMDAD has extensive and relevant experience working in Indonesia and in early 2017 completed a Project Definition Study ("PDS") for the BKM project (see RNS dated 22 March 2017) which built upon the planning from the Preliminary Economic Assessment ("PEA") to provide better definition for the Feasibility Study scope of work. The results of the AMDAD PDS provided a high level of confidence in advancing to a Bankable Feasibility Study ("BFS").

AMDAD are now developing new mining cost models and re-running a series of pit optimisations based on the updated BKM Resource (see RNS dated 28 June 2017) and utilising more refined metallurgical and project planning information.

Metallurgical Engineering

Metallurgical test-work program continuing optimisation activities: David Readett from MWorx, the lead metallurgical consultant for the BKM Feasibility Study, has continued to oversee the leach column program being undertaken at CORE laboratories in Brisbane. Column tests have been running since January 2017 and the short (2 metre) columns are currently progressing through the scheduled closure process. Results in relation to this work are anticipated before the end of October. The longer columns (6 metre) will continue operating as planned, through to the 4th quarter of 2017.

The study team have also recently initiated a hydrodynamic testing program which is being conducted at the world-leading HydroGeoSense ("HGS") facility in Arizona. The hydrodynamic testing is a critical input to the heap-leach design and focuses heavily on the physical behaviour of fluid-flow within the heap.

Key data generated from these programs will allow the project team to develop a robust and optimised set of design criteria for the heap-leach pads and overall process engineering work.

Geochemistry

Kinetic test-work focused on the behaviour of the proposed waste dump materials to environmental conditions overtime is underway and will support the geochemical analysis being completed by our environmental team at PT Lorax.

Vendor Selection

Additional contractors and consultants continue to be engaged to support ramp-up of activities.

The selection of a process engineering service provider is well advanced, with proposals having been submitted to the Company from seven international engineering consultancies. Engagement of the preferred process engineering contractor will be made shortly along with service providers covering the following key study components:

Power supply: Based upon the PEA it is anticipated that approximately 20MW of electricity will be required to support operations at BKM. The study will determine the most appropriate technical and commercial approach to supply power to the BKM operation.

 

Water Management: Asiamet, supported by PT Lorax's Indonesian and international experts, is developing site-wide water and load balances using custom-built water management models. This is a key area for the BKM Project to be initiated early this month.

 

Site Infrastructure layout: Asiamet will shortly commence a limited drilling program to confirm the suitability of key areas for locating mine-site infrastructure from a mineralisation and geotechnical perspective. This work is planned to be completed in the 4th quarter of 2017.

 

Peter Bird, Asiamet's Chief Executive Officer commented:

"Following on from an intensive Resource evaluation drilling programme and subsequent significant upgrade in the BKM copper Resource estimate, we are pleased to report a significant ramp up of activity relating to the engineering and design aspects of the BKM Bankable Feasibility Study.

The Bankable Feasibility Study is very focused on fine tuning the outcomes of the PEA. We are really pleased with the positive results generated from the early phase engineering and design studies, coupled with the excellent results from our exploration and metallurgical test-work programs. Work to date reaffirms the potential for developing a high-quality copper mine at BKM. The detailed engineering and design is a large package of work which will significantly advance the progress and robustness of the BKM BFS and we look forward to progressively reporting results as they become available."

 

Qualified Person

Data disclosed in this press release have been reviewed and verified by Asiamet's qualified person, Stephen Hughes, P. Geo, Vice President Exploration of the Company and a Qualified Person within the meaning of NI 43-101 and for the purposes of the AIM Rules

 

ON BEHALF OF THE BOARD OF DIRECTORS

Peter Bird, Deputy Chairman and CEO

-Ends-

For further information, please contact:

Peter BirdDeputy Chairman and CEO, Asiamet Resources LimitedTelephone: +61 3 8644 1300Email: peter.bird@asiametresources.com

 

Tony ManiniExecutive Chairman, Asiamet Resources LimitedTelephone: +61 3 8644 1300Email: tony.manini@asiametresources.com

 

FlowComms Limited

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com 

Asiamet Resources Nominated AdviserRFC Ambrian Limited

Andrew Thomson / Stephen Allen

Telephone: +61 8 9480 2500

Email: Andrew.Thomson@rfcambrian.com / Stephen.Allen@rfcambrian.com

 

Optiva Securities LimitedChristian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

 

 

 

Forward looking statements

This announcement includes "forward-looking statements" which include all statements other than statements of historical facts, including, without limitation, those regarding the Company's business strategy, plans and objectives of management for future operations, or any statements proceeded by, followed by or that include the words "targets", "believes", "expects", "aims", "intends", "will", "may", "anticipates", "would", "could" or similar expressions or negatives thereof. Such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the Company's control that could cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding the Company's present and future business strategies and the environment in which the Company will operate in the future. These forward-looking statements speak only as at the date of this announcement. The Company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements contained herein to reflect any change in the Company's expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based, unless required to do so by applicable law or the AIM Rules.

 


ISIN:BM04521V1038
Category Code:DRL
TIDM:ARS
LEI Code:213800PWJMT1NG28TA88
Sequence No.:4704
 
End of AnnouncementEQS News Service

616517 06-Oct-2017 

UK Regulatory announcement transmitted by DGAP - a service of EQS Group AG. The issuer is solely responsible for the content of this announcement.

Date   Source Headline
9th May 202411:45 amRNS2023 Annual Report & Financial Statements
17th Apr 20247:00 amRNSBKM High Grade Copper Rock Sample Results
28th Mar 20247:00 amRNSBKM Project Engineering Design & Execution Update
27th Mar 20247:00 amRNSSustainable Power Solution for BKM Copper Project
1st Mar 20247:04 amRNSCorporate Update
28th Dec 20237:00 amRNSEnd of Year Project Status Update
20th Dec 20232:30 pmRNSShare Purchase by CEO
15th Nov 20237:00 amRNSStrategic c.US$4.0 million Financing
30th Oct 20237:05 amRNSCorporate Update
30th Oct 20237:05 amRNSBoard Changes
6th Oct 20237:00 amRNSCorporate Update
27th Sep 20238:15 amRNS2023 Interim Report & Financial Statements
22nd Sep 20237:00 amRNSBoard Changes
1st Sep 20237:00 amRNSChange of Nominated Adviser
11th Aug 20231:46 pmRNSCorrection - Director Fees and Employee Payments
8th Aug 20238:10 amRNSCorporate Update – Project Financing
13th Jul 20233:00 pmRNSDirectors Fees and Employee Incentive Payments
27th Jun 20237:45 amRNSNotification of Major Shareholding
23rd Jun 20237:10 amRNSExecutive Chairman IGTV Interview
13th Jun 20233:55 pmRNSResult of AGM
12th Jun 20237:15 amRNSCorporate Update - Advisors Appointed
19th May 20238:25 amRNSShare Purchase by CEO
12th May 20235:00 pmRNSNotice of Annual General Meeting
10th May 202310:30 amRNSUpdated BKM FS Delivers Excellent Economics
10th May 202310:30 amRNSUpdated BKM Ore Reserve
27th Apr 20233:58 pmRNS2022 Annual Report & Financial Statements
6th Apr 202311:30 amRNSCEO Podcast – Feasibility Study progress
29th Mar 202311:06 amRNS121 Conference Hong Kong Investor Presentation
20th Mar 20237:00 amRNSBKM Copper Project Update - Capital Cost Estimate
10th Feb 20237:00 amRNSBKM Copper Project FS Activities Update
13th Jan 20232:05 pmRNSSecond Price Monitoring Extn
13th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSMoU signed with BGRIMM Technology Group
30th Dec 20227:00 amRNSBusiness Update & 2022 Overview
9th Dec 202212:45 pmRNSShare Purchase by CEO
30th Nov 20222:15 pmRNSShare Purchase by CEO
25th Nov 20223:16 pmEQSAsiamet Resources CEO talks latest work on updated feasibility study for BKM copper project
18th Nov 202210:00 amRNSMines and Money Conference and Investor Evening
18th Nov 20227:00 amRNS2022 FS Update Life of Mine Production Physicals
15th Nov 20221:40 pmRNSHolding(s) in Company
14th Nov 20227:00 amRNSPositive Results for Key Inputs to 2022 FS Update
7th Nov 20229:30 amRNSPT Delta Dunia Makmur Increases Strategic Stake
20th Oct 20227:00 amRNSBKM Copper Project Power Solution Progressing
26th Sep 20229:39 amRNSCEO Video Presentation
24th Aug 202211:11 amRNSCEO Video Presentation – Feasibility Study Update
17th Aug 202210:45 amRNSInterim Report & Financial Statements
25th Jul 20222:15 pmRNS2021 Directors Fees
13th Jul 20226:00 pmRNSResult of AGM
6th Jul 20227:00 amRNSAnnual General Meeting – Update
29th Jun 20227:00 amRNSDOID Diligence for BKM Copper Project Complete

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.