The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.10 (8.333%)
Open: 1.25
High: 1.275
Low: 1.25
Prev. Close: 1.25
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

KSK Copper Project Update

12 Nov 2013 07:00

Kalimantan Gold Corporation Limited ("KLG") is pleased to announce that the airborne magnetic and gravity survey over the whole of the KSK CoW has been completed. The results of this survey will assist in the prioritisation and positioning of future drill holes. Field work at Mansur, Tumbang Huoi and Baroi has recommenced and field work will also be carried out at North Mansur.

Airborne Gravity and Magnetic Survey

The results of this survey have assisted in developing a better understanding of the correlation between gravity, magnetics and mineralization. At Beruang Kanan, a moderate gravity high response is present over the known mineralized zone. This response extends to the south of the two most recent drill holes, BK57 and BK58, which both intersected significant mineralization (refer Press Release dated 22 August 2013). This moderate gravity high also extends to Beruang Kanan West which will be subject to drilling next year. Several new geophysical targets have also been identified within the COW.

MAP: Beruang Kanan residual gravity map showing drill hole locations. This image shows responses to depths of < 4km below surface.

To view the map, click onto the following link: http://www.usetdas.com/maps/kalimantan/kalimantannov112013007.pdf

Field and Ground Work

Following two months of data compilation and project reviews, field work has recommenced at Mansur, Tumbang Huoi and Baroi in order to follow up and finalize drill targets for next year’s proposed drilling programs. Field teams will be deployed on the large and yet to be explored North Mansur circular magnetic anomaly and Tisoi, a well-defined magnetic anomaly where gold and magnetite are reported in the drainages.

To view the Kalimantan Gold Regional Geology, click onto the following link: http://www.usetdas.com/maps/kalimantan/kalimantannov112013002.gif

Magnetic Map North Mansur

To view the Magnetic Map North Mansur, click onto the following link: http://www.usetdas.com/maps/kalimantan/kalimantannov112013004.pdf

Aeromagnetic Map (reduced to Equator, Analytical Signal) showing the Mansur North circular magnetic anomaly and the Mansur diorite porphyry and the location of previous drill holes which were drilled to depths between 80 and 350 meters, including SMH03 42m@0.2% Cu & 0.2g/t Au and SMH04, 76.75m@0.13% Cu &0.10g/t Au. A number of deep holes to 1400m are being planned at this prospect for next year.

Baroi and Tumbang Huoi

Drilling in 2013 at Baroi and Tumbang Huoi did not produce economic intercepts but did confirm they are porphyry environments. Drill hole TH02-01 at Tambang Huoi was drilled to 253m and returned strongly anomalous copper, gold and molybdenum mineralization from 170m to 236 m (66m @ 0.16 copper equivalent)

TH02-01 @ 200m

To view TH02-01 @ 200m , click onto the following link: http://www.usetdas.com/maps/kalimantan/kalimantannov112013005.jpg

Baroi and Tumbang Huoi are both very large prospects, Baroi covers 6 by 4 kilometers. These prospects have now been broken into several sub prospect areas for immediate follow-up mapping, sampling and IP surveys, including deep hole radial IP that is expected to assist in defining deeper zones of potentially porphyry-related sulphide mineralization.

Logistics

The logging company operating in the area has reopened old roads into Tumbang Huoi, Volcano, Beruang Kanan and deeper into the central part of the COW. This will provide new access which will hugely assist our logistics and greatly reduce the cost of helicopter support for next year’s exploration program.

All data, as disclosed in this press release, has been reviewed and verified by the Company's Qualified Person for the KSK Project, Dr. Peter Pollard, who is a Member of the Australasian Institute of Mining and Metallurgy (Chartered Professional). Dr Pollard acts as a technical consultant to KLG and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person under the JORC Code.

-Ends-

For further information please contact:Faldi IsmailDeputy Chairman and CEO, Kalimantan GoldMobile: +61 (0) 423 206 324Email: faldi.ismail@kalimantan.comGerald Cheyne

Director Corporate DevelopmentTelephone: +44 (0) 2077311806Mobile: +44 (0) 7717473168Email: gerald.cheyne@kalimantan.comVSA Capital LimitedKatrina Damouni/ Peter DamouniTelephone: +44 20 3005 5005/ +44 20 3005 5007Email: pdamouni@vsacapital.comKLG's Nominated AdviserRFC Ambrian LimitedStuart LaingTelephone: +61 8 9480 2506Email: stuart.laing@rfcambrian.com

About Kalimantan Gold

Kalimantan Gold Corporation Limited is a junior exploration company listed on both the TSX Venture Exchange in Canada and on AIM in London. The Company has two exploration projects in Kalimantan: the Jelai epithermal gold project in East Kalimantan and the KSK Contract of Work in Central Kalimantan with potential for multiple porphyry copper and gold prospects. For further information please visit www.kalimantan.com

To view the Kalimantan map, click onto the following link: http://www.usetdas.com/maps/kalimantan/kalimantannov112013006.jpg

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements that are based on the Company’s current expectations and estimates. Forward-looking statements are frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”, “suggest”, “indicate” and other similar words or statements that certain events or conditions “may” or “will” occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

Copyright Business Wire 2013

Date   Source Headline
9th May 202411:45 amRNS2023 Annual Report & Financial Statements
17th Apr 20247:00 amRNSBKM High Grade Copper Rock Sample Results
28th Mar 20247:00 amRNSBKM Project Engineering Design & Execution Update
27th Mar 20247:00 amRNSSustainable Power Solution for BKM Copper Project
1st Mar 20247:04 amRNSCorporate Update
28th Dec 20237:00 amRNSEnd of Year Project Status Update
20th Dec 20232:30 pmRNSShare Purchase by CEO
15th Nov 20237:00 amRNSStrategic c.US$4.0 million Financing
30th Oct 20237:05 amRNSCorporate Update
30th Oct 20237:05 amRNSBoard Changes
6th Oct 20237:00 amRNSCorporate Update
27th Sep 20238:15 amRNS2023 Interim Report & Financial Statements
22nd Sep 20237:00 amRNSBoard Changes
1st Sep 20237:00 amRNSChange of Nominated Adviser
11th Aug 20231:46 pmRNSCorrection - Director Fees and Employee Payments
8th Aug 20238:10 amRNSCorporate Update – Project Financing
13th Jul 20233:00 pmRNSDirectors Fees and Employee Incentive Payments
27th Jun 20237:45 amRNSNotification of Major Shareholding
23rd Jun 20237:10 amRNSExecutive Chairman IGTV Interview
13th Jun 20233:55 pmRNSResult of AGM
12th Jun 20237:15 amRNSCorporate Update - Advisors Appointed
19th May 20238:25 amRNSShare Purchase by CEO
12th May 20235:00 pmRNSNotice of Annual General Meeting
10th May 202310:30 amRNSUpdated BKM FS Delivers Excellent Economics
10th May 202310:30 amRNSUpdated BKM Ore Reserve
27th Apr 20233:58 pmRNS2022 Annual Report & Financial Statements
6th Apr 202311:30 amRNSCEO Podcast – Feasibility Study progress
29th Mar 202311:06 amRNS121 Conference Hong Kong Investor Presentation
20th Mar 20237:00 amRNSBKM Copper Project Update - Capital Cost Estimate
10th Feb 20237:00 amRNSBKM Copper Project FS Activities Update
13th Jan 20232:05 pmRNSSecond Price Monitoring Extn
13th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSMoU signed with BGRIMM Technology Group
30th Dec 20227:00 amRNSBusiness Update & 2022 Overview
9th Dec 202212:45 pmRNSShare Purchase by CEO
30th Nov 20222:15 pmRNSShare Purchase by CEO
25th Nov 20223:16 pmEQSAsiamet Resources CEO talks latest work on updated feasibility study for BKM copper project
18th Nov 202210:00 amRNSMines and Money Conference and Investor Evening
18th Nov 20227:00 amRNS2022 FS Update Life of Mine Production Physicals
15th Nov 20221:40 pmRNSHolding(s) in Company
14th Nov 20227:00 amRNSPositive Results for Key Inputs to 2022 FS Update
7th Nov 20229:30 amRNSPT Delta Dunia Makmur Increases Strategic Stake
20th Oct 20227:00 amRNSBKM Copper Project Power Solution Progressing
26th Sep 20229:39 amRNSCEO Video Presentation
24th Aug 202211:11 amRNSCEO Video Presentation – Feasibility Study Update
17th Aug 202210:45 amRNSInterim Report & Financial Statements
25th Jul 20222:15 pmRNS2021 Directors Fees
13th Jul 20226:00 pmRNSResult of AGM
6th Jul 20227:00 amRNSAnnual General Meeting – Update
29th Jun 20227:00 amRNSDOID Diligence for BKM Copper Project Complete

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.