Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAjax Resources Plc Regulatory News (AJAX.PL)

Share Price Information for Ajax Resources Plc (AJAX.PL)

Share Price is delayed by 15 minutes
Get Live Data
5.625    0.125 (2.27%)
Bid:
5.25
Ask:
6.00
Spread: 0.75 (14.286%)
Market Cap: £6.76m
AJAX.PL Live PriceLast checked at - Aquis Stock Exchange

Intraday Ajax Resources Plc Share Chart

Approval of EIS for Eureka Project

8 Dec 2025 07:00

RNS Number : 6208K
Ajax Resources PLC
08 December 2025
 

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF REGULATION 11 OF THE MARKET ABUSE (AMENDMENT) (EU EXIT) REGULATIONS 2019/310.

 

8 December 2025

AJAX RESOURCES PLC 

("Ajax" or the "Company")

Approval of EIS for Eureka Project & Commencement of Mobilisation

Ajax Resources Plc (AQSE: AJAX) the natural resources investment company, is pleased to announce that the Environmental Impact Study ("EIS") for its 100% owned Eureka Project in Jujuy Province, northern Argentina, ("Eureka") has been formally approved by the Director of Mines and Energy Resources for the Province of Jujuy.

The approval of the EIS represents a key permitting milestone for the Company, and it now allows the commencement of on-ground exploration activities. Mobilisation of personnel, contractors, and equipment to Eureka will now begin.

With the EIS approved, Ajax, through its wholly owned Argentine subsidiary Puna Metals S.A. ("Puna"), will initiate its planned exploration programme. Eureka is drill ready, and various highly prospective anomalies have already been identified by previous operators. High grade copper oxides have been verified at surface, with grades reported up to 6.1% Cu and numerous samples returning more than 0.5% Cu across multiple historical programmes.

Ajax's drilling programme will commence with an initial 1,500 metre diamond drilling campaign, benefiting from and building upon the extensive historical mapping and pitting completed across Eureka by previous owner. This initial programme will be followed by a further 4,000 metres of drilling, guided by these initial results, designed to expand coverage across priority copper and gold targets and advance Eureka toward a maiden Mineral Resource Estimate. Drilling will target shallow geochemical and IP anomalies, as well as a deeper IP chargeability anomaly outlined in a 2014 report authored by SRK Consulting, possibly representing the transition to a sulphide-rich level of the system. Drilling will take place in the immediate vicinity of Mina Eureka, the historic copper and gold mine within Eureka, which has a 400-year history of production and has never been drilled. 

Layered Mineral System: Multiple Target Horizons

Eureka contains a layered copper and gold mineral system, with mineralisation controlled by both stratigraphy and structure:

• Eureka Formation (Miocene):Hosts oxide copper beds developed within fluvial gravels, along with placer style gold at the basal contact. This horizon forms the focus of trenching, geophysics, and shallow drilling.

 

• Acoite Formation (Ordovician basement):Lies below and may host sulphide rich feeder systems, to be tested by deeper phases of diamond drilling.

 

 

 

Excellent Heap Leach Amenability

Mineralisation is hosted in weakly consolidated fluvial gravels with low carbonate content, reducing acid consumption and providing favourable characteristics for low-cost copper recovery.

Underexplored Gold Potential

A historic, non-JORC compliant estimate indicates approximately 52,000 ounces of gold within basal conglomerates, with a 2007 NI 43-101 report suggesting placer potential may be several times greater, associated with a broader paleo channel. Ordovician quartz veins present a separate hard rock gold target. Codelco did not evaluate gold during previous work, leaving this upside untested across the district.

Red Bed Analogues: Additional Scale Potential

Eureka shares key geological traits with the Corocoro red bed copper system in Bolivia, which hosts approximately 80 million tonnes at 0.6% Cu. While no assurance is given that Eureka hosts similar size or grade, the geological parallels indicate potential for a larger stratabound system. These concepts will be further evaluated in the upcoming drilling programme.

Historic Resource Indications (Non-JORC)

Historic, non-JORC compliant estimates indicate up to 62 million tonnes at 1% copper and approximately 52,000 ounces of gold within the copper oxide horizon. These figures are conceptual in nature, not JORC 2012 compliant, and must not be treated as current resources or reserves. The drilling programme is designed to test these indications and provide data for a maiden JORC 2012 compliant Mineral Resource Estimate, with publication expected during the first half of 2026.

As previously reported, Ajax's exploration budget for Eureka to 30 June 2026 is approximately £1.4 million, and the Company confirms it is fully funded for this programme. This work represents the first phase of the Company's five-year strategy to advance Eureka toward potential commercial production, subject to a positive independent feasibility study.

Ippolito Ingo Cattaneo, Chief Executive of Ajax, commented:

"The approval of the EIS marks a major step forward for Ajax as we move from preparation into active exploration at Eureka. This is an exceptional opportunity for the Company, with multiple high-quality copper and gold targets that have never been drill tested despite centuries of historic mining activity. Our initial 1,500 metres of drilling, followed by a further 4,000 metres guided by these initial results, will allow us to test both the near surface oxide potential and the deeper sulphide feeder systems that have been highlighted in previous technical work.

The timing of the commencement of activities could not be more favourable as both copper and gold are trading near record pricing, which further enhances the potential strategic value of Eureka.

We are fully funded for the upcoming work, and we intend to engage as many local community resources as possible so that all stakeholders stand to benefit from our operational activities from the very outset.

In anticipation of mobilisation, we have recently fully refurbished the Eureka camp, ensuring that the site is ready to support the commencement of drilling and associated field activities.

We are grateful to the local authorities for their collaboration and support, and we are greatly excited by our work in the Province of Jujuy.

We shall look forward to updating shareholders as we enter the execution phase and begin delivering tangible value through potentially highly material resource definition at Eureka."

- ENDS -

 

 

For further information: 

 

Ajax Resources Plc

Ippolito Cattaneo, Chief Executive Officer

Tel: + 44 (0) 208 146 6345

info@ajaxresources.com

Allenby Capital Limited (AQSE Corporate Adviser)

Nick Harriss / Nick Athanas

Tel: + 44 (0) 203 328 5656

n.harriss@allenbycapital.com

n.athanas@allenbycapital.com

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NEXPKFBNABDKPBK
12
Date   Source Headline
18th Jun 20267:30 amRNSUpdate on Macacha and Application for Licences
1st Jun 20267:00 amRNSGrant of Options
15th May 20267:00 amRNSUpdate on the acquisition of the Paguanta Project
13th May 20267:00 amRNS-RPublication of Research
30th Apr 20267:00 amRNSAjax makes strategic uranium investments in Italy
28th Apr 20267:00 amRNSApplication to list on Euronext Growth Oslo
27th Apr 202612:15 pmRNSTungsten and Antimony Project in Sardinia, Italy
21st Apr 20267:00 amRNSUpdate on the acquisition of the Paguanta Project
20th Apr 20263:30 pmRNSHolding in Company
20th Apr 202612:00 pmRNSHoldings in Company
16th Apr 20267:00 amRNSUpdate on Potential Divestment of Eureka
14th Apr 20267:00 amRNSSubmission of EIA: Macacha Copper & Silver Project
1st Apr 20267:00 amRNSTotal Voting Rights & Holdings in the Company
24th Mar 202612:30 pmRNSDirector/PDMR Shareholding
16th Mar 20267:00 amRNSDirectors' Dealings and Holdings
16th Mar 20267:00 amRNSDirectors' Dealings and Holdings
11th Mar 20267:00 amRNSIssue of Shares for Macacha Project
11th Mar 20267:00 amRNSIssue of Shares for Macacha Project
10th Mar 20267:00 amRNSDirector/PDMR Shareholding
9th Mar 20267:00 amRNSPereira Velho Acquisition & Appian Investment
4th Mar 20267:00 amRNSPotential Divestment of Eureka Project+Ops Update
2nd Mar 20267:00 amRNSExecution of Option-to-Purchase Agreement, Macacha
9th Feb 20267:00 amRNSUpdate on the Acquisition of Pereira Velho Project
30th Jan 20264:30 pmRNSHoldings in the Company & Total Voting Rights
27th Jan 20267:00 amRNSEquity Subscription to raise £1,000,000
23rd Jan 20267:00 amRNSAppointment of Geological Consultant, Brazil
21st Jan 20264:30 pmRNSHolding(s) in Company
21st Jan 20267:00 amRNSHolding(s) in Company
19th Jan 20267:00 amRNSNew conditional acquisition of Paguanta Project
12th Jan 20267:00 amRNSStart of Drilling at Eureka Gold & Copper Project
6th Jan 20267:00 amRNSMobilisation of Drilling Rig to Eureka Project
31st Dec 20251:00 pmRNSHoldings in the Company & Total Voting Rights
31st Dec 20251:00 pmRNSHoldings in the Company & Total Voting Rights
22nd Dec 20257:00 amRNSConditional Acquisition of the Rachaite Prospect
22nd Dec 20257:00 amRNSConditional Acquisition of the Rachaite Prospect
16th Dec 202512:00 pmRNS-RPublication of Research
16th Dec 20257:00 amRNSCompletion of Fundraise
12th Dec 20257:00 amRNSUpdate on Fundraise
11th Dec 20255:15 pmRNSDirector/PDMR Shareholding
11th Dec 202510:30 amRNSDirector/PDMR Shareholding
11th Dec 20257:00 amRNSProposed Acquisition & Fundraise of up to £1 m
10th Dec 20257:00 amRNSConditional Acquisition of the Leon Project
8th Dec 20257:00 amRNSApproval of EIS for Eureka Project
28th Nov 20256:28 pmRNSHalf Yearly Report for the 6 months to 31 Aug 2025
19th Nov 20257:00 amRNSUpdate on the Acquisition of the Paguanta Project
28th Aug 20257:00 amRNSConditional Acquisition of the Paguanta Project
27th Aug 20257:00 amRNSCompany Update & Completion of Licence Acquisition
26th Aug 20251:00 pmRNSResult of AGM
21st Aug 20256:15 pmRNSDirector/PDMR Shareholding
31st Jul 20255:00 pmRNSTotal Voting Rights & Holdings in the Company
12

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.