Preparation of Site for Drilling...24 Nov 2025 10:39
Some good posts this morning, particularly Twenty-Four 7 ifiknow, with regards to a realistic timeline for drill turning i agree with the post this morning at 07:12 by Twenty-Four. To mobilise all the contractors to complete the repair of roads, airport, construction of the well-pad, and source a rig will take a few months and I can see it taking a few months and expect the drill to turn around Easter time.
I actually interpreted the 50 day preparation for drill as the time taken to inspect the casing, install new bop, and drill the extra depth from 2400m through the domed subsalt layer at 3,200m.
It could of course be quicker than this, irrespective we should know comfortably by end of May / early summer.
An awful lot of updates before then, each one underpinning the sp at a higher base level each time.
If ewe do hit Helium, Hydrogen and Nat Gas anywhere near the volumes that have been quoted we will re-rate to several ££'s, there is absolutely no way we can't if the Off-Taker signs on the dotted line and and we go in to production with revenue streams.
atb.