Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTSG.L Regulatory News (TSG)

  • There is currently no data for TSG

Asacha Project Update

2 Mar 2011 07:00

RNS Number : 1365C
Trans-Siberian Gold PLC
02 March 2011
 

 

 

 

Trans-Siberian Gold plc

 

Asacha project update

 

 

London: 2 March 2011 - Trans-Siberian Gold plc ("TSG" or "the Company") (TSG.L)reports on the progress of construction at the Asacha site.

 

Underground mine development is continuing as planned. During January 2011 more than 130 metres and 1,500 m3 of mine development were completed. The ore stockpile at 31 January 2011 comprised more than 62,000 tonnes.

 

By mid February 2011, more than half of the plant building's internal concrete walls had been completed. The building's multi-layer roofing with thermal insulation was close to completion with 100% of the lower layer installed. Construction of ventilation and heating systems is underway. The coarse ore bin's concrete parts are also under construction. 

In spite of snowstorms and strong winds earthwork and geomembrane laying activities on the tailings storage facility have continued.

 

The thermally insulated repair shop building is ready, except for completion of its supply system, concrete floor and equipment foundations. Cold storage hangars have been completed and the sewage treatment facility awaits installation of its power supply, ventilation and heating. Construction of the site's water, heat supply and sewage networks is in progress. The powerline from the site's diesel generators to the mine has been completed. The license for cyanide storage has been granted and the facility commissioned.

 

As a result of a 30% increase in diesel fuel costs, additional soil replacement works for tailings storage and the water treatment pond and additional operating expenditure due to the extended construction period, the total capital cost of the Asacha project prior to commencement of production is now estimated at $128.5 million, net of $10.2 million VAT recoveries, compared to the September 2010 estimate of $124.5 million (net of $8.3 million VAT recoveries). The total project cost includes pre-commissioning mining and plant costs of $4 million, other pre-operating expenditure of $36.8 million, "first fill" equipment spares and consumables of $1 million and contingency of $0.6 million.

 

At a gold price of $850/oz, Life of mine ("LOM") cash costs on an all equity basis on total gold production of 590,000 oz are forecast at $218/oz, before taking account of a $17/oz credit from silver production (based on an assumed silver price of $10/oz). Cash costs including all royalties and taxes (in total $72.9 million, net of VAT recoveries), on an all equity basis are forecast at $342/oz. Total costs on the same basis, after depreciation of all capital expenditure (including $27.5 million post start up) and pre-start up mining and other operating expenditure, are forecast at $609/oz, giving a $241/oz margin at a gold price of $850/oz.

 

Actual expenditure on the project up to December 2010 amounted to $112 million, net of $7.7 million VAT recovered. The remaining costs prior to the commencement of production are estimated at $16.5 million, net of further VAT recoveries of $2.5 million, comprising:

 

 

 

$ million

Capital expenditure

Mine and mining equipment and facilities

1.1

 

Gold plant, site facilities and tailings storage (1st phase)

8.0

 

Off-site power supply and other infrastructure

2.7

 

Contingency

0.6

 

Total capital

12.4

Other costs

Pre-production mining, spares and consumables and other operating costs

6.6

 

 

19.0

Less VAT recoveries

 

2.5

 

 

16.5

 

 

A further $27.5 million of capital expenditure is expected to be incurred after the commencement of production (including $6.3 million on mine development, $5.1 million on the plant, tailings storage and solid waste landfill, $11.6 million for the completion of the external power line and $4.5 million contingency).

 

 

 

Ends

 

Contacts:

 

TSG

+44 (0) 1480 811871

Simon Olsen

 

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJBMRTMBJMBBB
Date   Source Headline
1st Feb 20123:56 pmRNSConversion of Debt & Total Voting Rights
31st Jan 20127:00 amRNSExercise of conversion options
30th Jan 20127:00 amRNSAsacha mining and production update
20th Dec 20117:00 amRNSAsacha mining and production update
1st Dec 20117:00 amRNSApproval of Rodnikova reserves and First repayment
14th Nov 20117:00 amRNSFirst sale of Asacha gold
2nd Nov 20117:00 amRNSFurther shipments of Asacha gold
19th Oct 20117:00 amRNSFirst shipment of Asacha gold
14th Oct 20117:00 amRNSProposed exercise of conv. option re. debt & GM
12th Oct 20117:00 amRNSProposed exercise of conversion option re. debt
12th Oct 20117:00 amRNSProposed exercise of conversion option re. debt
3rd Oct 20117:00 amRNSProposed exercise of conversion option re. debt
29th Sep 20117:00 amRNSNew Shareholder Loan Facilities
29th Sep 20117:00 amRNSHalf Yearly Report
30th Aug 20118:45 amRNSAsacha Project Update
8th Aug 20117:00 amRNSAsacha Project Update
28th Jun 201112:33 pmRNSAsacha Project Update
28th Jun 20117:00 amRNSAGM Presentation
10th Jun 20117:00 amRNSAsacha Project update
3rd Jun 20111:14 pmRNSNotice of AGM
31st May 20117:00 amRNSFinal Results for the year ended 31 December 2010
19th Apr 20117:00 amRNSAsacha Project Update and Shareholder Loans
2nd Mar 20117:00 amRNSAsacha Project Update
26th Jan 20117:00 amRNSAsacha Project Update
15th Dec 20107:00 amRNSAsacha project update
15th Nov 20107:00 amRNSFirst drawdown of US$18 million Asacha loan
11th Nov 20101:01 pmRNSHolding(s) in Company
1st Nov 20109:00 amRNSNew loan facilities and project update
29th Sep 20107:00 amRNSHalf Yearly Report
13th Aug 20108:09 amRNSPurchase of minority interest in Asacha project
29th Jun 20104:49 pmRNSResult of AGM
26th May 20107:00 amRNSNotice of AGM
25th May 20107:00 amRNSFinal Results
23rd Mar 201011:31 amRNSResult of GM/Conversion and Placing of Shares
1st Mar 20107:00 amRNSIssue of Equity
16th Nov 20097:00 amRNSAppointment of Chairman
19th Oct 20097:00 amRNSDirectorate Change
30th Sep 20097:00 amRNSHalf Yearly Report
28th Jul 200912:10 pmRNSResult of AGM
27th Jul 20097:00 amRNSDirectorate Change and Grant of Options
30th Jun 20097:00 amRNSAnnual Report & Accounts
23rd Jun 20098:27 amRNSFinal Results
29th May 20099:05 amRNSFunding Update
7th May 20097:00 amRNSAsacha project and funding update
27th Apr 200912:05 pmRNSDirectorate Change
16th Dec 200811:32 amRNSTrading Statement
24th Nov 200812:22 pmRNSDirectorate Change
29th Sep 20087:00 amRNSInterim Results
18th Aug 20084:00 pmRNSEGM Statement
28th Jul 20087:00 amRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.