Asacha Project Update

2 Mar 2011 07:00

RNS Number : 1365C
Trans-Siberian Gold PLC
02 March 2011
 

 

 

 

Trans-Siberian Gold plc

 

Asacha project update

 

 

London: 2 March 2011 - Trans-Siberian Gold plc ("TSG" or "the Company") (TSG.L)reports on the progress of construction at the Asacha site.

 

Underground mine development is continuing as planned. During January 2011 more than 130 metres and 1,500 m3 of mine development were completed. The ore stockpile at 31 January 2011 comprised more than 62,000 tonnes.

 

By mid February 2011, more than half of the plant building's internal concrete walls had been completed. The building's multi-layer roofing with thermal insulation was close to completion with 100% of the lower layer installed. Construction of ventilation and heating systems is underway. The coarse ore bin's concrete parts are also under construction. 

In spite of snowstorms and strong winds earthwork and geomembrane laying activities on the tailings storage facility have continued.

 

The thermally insulated repair shop building is ready, except for completion of its supply system, concrete floor and equipment foundations. Cold storage hangars have been completed and the sewage treatment facility awaits installation of its power supply, ventilation and heating. Construction of the site's water, heat supply and sewage networks is in progress. The powerline from the site's diesel generators to the mine has been completed. The license for cyanide storage has been granted and the facility commissioned.

 

As a result of a 30% increase in diesel fuel costs, additional soil replacement works for tailings storage and the water treatment pond and additional operating expenditure due to the extended construction period, the total capital cost of the Asacha project prior to commencement of production is now estimated at $128.5 million, net of $10.2 million VAT recoveries, compared to the September 2010 estimate of $124.5 million (net of $8.3 million VAT recoveries). The total project cost includes pre-commissioning mining and plant costs of $4 million, other pre-operating expenditure of $36.8 million, "first fill" equipment spares and consumables of $1 million and contingency of $0.6 million.

 

At a gold price of $850/oz, Life of mine ("LOM") cash costs on an all equity basis on total gold production of 590,000 oz are forecast at $218/oz, before taking account of a $17/oz credit from silver production (based on an assumed silver price of $10/oz). Cash costs including all royalties and taxes (in total $72.9 million, net of VAT recoveries), on an all equity basis are forecast at $342/oz. Total costs on the same basis, after depreciation of all capital expenditure (including $27.5 million post start up) and pre-start up mining and other operating expenditure, are forecast at $609/oz, giving a $241/oz margin at a gold price of $850/oz.

 

Actual expenditure on the project up to December 2010 amounted to $112 million, net of $7.7 million VAT recovered. The remaining costs prior to the commencement of production are estimated at $16.5 million, net of further VAT recoveries of $2.5 million, comprising:

 

 

 

$ million

Capital expenditure

Mine and mining equipment and facilities

1.1

 

Gold plant, site facilities and tailings storage (1st phase)

8.0

 

Off-site power supply and other infrastructure

2.7

 

Contingency

0.6

 

Total capital

12.4

Other costs

Pre-production mining, spares and consumables and other operating costs

6.6

 

 

19.0

Less VAT recoveries

 

2.5

 

 

16.5

 

 

A further $27.5 million of capital expenditure is expected to be incurred after the commencement of production (including $6.3 million on mine development, $5.1 million on the plant, tailings storage and solid waste landfill, $11.6 million for the completion of the external power line and $4.5 million contingency).

 

 

 

Ends

 

Contacts:

 

TSG

+44 (0) 1480 811871

Simon Olsen

 

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJBMRTMBJMBBB
Date   Source Headline
16th Mar 20217:00 amRNSMineral Resource Estimate
15th Mar 20217:00 amRNSTransaction in Own Shares
9th Mar 20217:00 amRNSTransaction in Own Shares
8th Mar 20217:00 amRNSTransaction in Own Shares
5th Mar 20217:00 amRNSTransaction in Own Shares
5th Mar 20217:00 amRNSAsacha Gold Mine Update
3rd Mar 20217:00 amRNSTransaction in Own Shares
2nd Mar 20217:00 amRNSInterim Results - EBITDA Correction
1st Mar 20217:00 amRNSTransaction in Own Shares
26th Feb 202110:04 amRNSReorganisation of TSG shareholding
26th Feb 20217:00 amRNSShare Buyback Programme
19th Feb 20217:00 amRNSRodnikova Project Scoping Study
3rd Feb 20217:00 amRNSChange of Advisers
19th Jan 20217:00 amRNSQ4 & FY20 Production Update
6th Jan 20213:22 pmRNSStatement on Fatalities at the Asacha mine
6th Jan 20212:06 pmRNSSecond Price Monitoring Extn
6th Jan 20212:01 pmRNSPrice Monitoring Extension
31st Dec 20207:00 amRNSSignificant Shareholders' Holdings
15th Dec 20207:00 amRNSIncreased Production Guidance for 2020
14th Dec 20204:41 pmRNSSecond Price Monitoring Extn
14th Dec 20204:36 pmRNSPrice Monitoring Extension
14th Dec 202011:00 amRNSPrice Monitoring Extension
30th Nov 20204:41 pmRNSHolding(s) in Company
30th Nov 20204:17 pmRNSHolding(s) in Company
30th Nov 20204:16 pmRNSHolding(s) in Company
30th Nov 20204:15 pmRNSHolding(s) in Company
10th Nov 20207:00 amRNSHolding(s) in Company
28th Oct 20207:00 amRNSDrilling & Exploration Update
22nd Oct 20207:00 amRNSQ3 Production and Operations Update
21st Oct 20207:00 amRNSInterim Dividend Currency Exchange Rate
29th Sep 20207:00 amRNSInterim Results
24th Sep 20207:00 amRNSNotice of Results and Investor Presentation
1st Sep 20207:01 amRNSHolding(s) in Company
1st Sep 20207:00 amRNSHolding(s) in Company
28th Aug 20207:00 amRNSLong Term Incentive Plan
24th Jul 20207:00 amRNSQ2 Production & Operations Update
20th Jul 20207:00 amRNSFinal Dividend Currency Exchange Rate
15th Jul 20207:00 amRNSExploration Presentation
14th Jul 20207:00 amRNSDrilling Results & Exploration Update
10th Jul 20207:00 amRNSVein 25 Development Update
30th Jun 20202:06 pmRNSResult of AGM
16th Jun 20207:00 amRNSMineral Resource Update
8th Jun 20207:00 amRNSNotice of AGM and Dividend Timeable
8th Jun 20207:00 amRNSLong Term Incentive Plan
8th Jun 20207:00 amRNSFinal Results
5th Jun 20207:00 amRNSNotice of Results
5th Jun 20207:00 amRNSDebt Re-Financing
19th May 20209:30 amRNSHolding(s) in Company
29th Apr 20205:36 pmRNSHolding(s) in Company
29th Apr 20205:35 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.