Asacha Project Update

2 Mar 2011 07:00

RNS Number : 1365C
Trans-Siberian Gold PLC
02 March 2011
 

 

 

 

Trans-Siberian Gold plc

 

Asacha project update

 

 

London: 2 March 2011 - Trans-Siberian Gold plc ("TSG" or "the Company") (TSG.L)reports on the progress of construction at the Asacha site.

 

Underground mine development is continuing as planned. During January 2011 more than 130 metres and 1,500 m3 of mine development were completed. The ore stockpile at 31 January 2011 comprised more than 62,000 tonnes.

 

By mid February 2011, more than half of the plant building's internal concrete walls had been completed. The building's multi-layer roofing with thermal insulation was close to completion with 100% of the lower layer installed. Construction of ventilation and heating systems is underway. The coarse ore bin's concrete parts are also under construction. 

In spite of snowstorms and strong winds earthwork and geomembrane laying activities on the tailings storage facility have continued.

 

The thermally insulated repair shop building is ready, except for completion of its supply system, concrete floor and equipment foundations. Cold storage hangars have been completed and the sewage treatment facility awaits installation of its power supply, ventilation and heating. Construction of the site's water, heat supply and sewage networks is in progress. The powerline from the site's diesel generators to the mine has been completed. The license for cyanide storage has been granted and the facility commissioned.

 

As a result of a 30% increase in diesel fuel costs, additional soil replacement works for tailings storage and the water treatment pond and additional operating expenditure due to the extended construction period, the total capital cost of the Asacha project prior to commencement of production is now estimated at $128.5 million, net of $10.2 million VAT recoveries, compared to the September 2010 estimate of $124.5 million (net of $8.3 million VAT recoveries). The total project cost includes pre-commissioning mining and plant costs of $4 million, other pre-operating expenditure of $36.8 million, "first fill" equipment spares and consumables of $1 million and contingency of $0.6 million.

 

At a gold price of $850/oz, Life of mine ("LOM") cash costs on an all equity basis on total gold production of 590,000 oz are forecast at $218/oz, before taking account of a $17/oz credit from silver production (based on an assumed silver price of $10/oz). Cash costs including all royalties and taxes (in total $72.9 million, net of VAT recoveries), on an all equity basis are forecast at $342/oz. Total costs on the same basis, after depreciation of all capital expenditure (including $27.5 million post start up) and pre-start up mining and other operating expenditure, are forecast at $609/oz, giving a $241/oz margin at a gold price of $850/oz.

 

Actual expenditure on the project up to December 2010 amounted to $112 million, net of $7.7 million VAT recovered. The remaining costs prior to the commencement of production are estimated at $16.5 million, net of further VAT recoveries of $2.5 million, comprising:

 

 

 

$ million

Capital expenditure

Mine and mining equipment and facilities

1.1

 

Gold plant, site facilities and tailings storage (1st phase)

8.0

 

Off-site power supply and other infrastructure

2.7

 

Contingency

0.6

 

Total capital

12.4

Other costs

Pre-production mining, spares and consumables and other operating costs

6.6

 

 

19.0

Less VAT recoveries

 

2.5

 

 

16.5

 

 

A further $27.5 million of capital expenditure is expected to be incurred after the commencement of production (including $6.3 million on mine development, $5.1 million on the plant, tailings storage and solid waste landfill, $11.6 million for the completion of the external power line and $4.5 million contingency).

 

 

 

Ends

 

Contacts:

 

TSG

+44 (0) 1480 811871

Simon Olsen

 

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJBMRTMBJMBBB
Date   Source Headline
29th Sep 201612:16 pmRNSResult of General Meeting
5th Sep 20167:00 amRNSProposed capital reduction and Notice of GM
29th Jul 20161:27 pmRNSDirector/PDMR Shareholding
29th Jul 20161:26 pmRNSDirector/PDMR Shareholding
28th Jul 20164:23 pmRNSHolding(s) in Company
28th Jul 20163:47 pmRNSHolding(s) in Company
18th Jul 20167:00 amRNSAsacha mining and production update
30th Jun 20163:11 pmRNSResult of AGM
30th Jun 20167:00 amRNSHolding(s) in Company
30th Jun 20167:00 amRNSAsacha Mining and Production Update
9th Jun 20167:00 amRNSFinal Results
18th Apr 20167:00 amRNSAsacha mining and production update
9th Feb 20162:09 pmRNSStmnt re Share Price Movement
20th Jan 20167:00 amRNS4th Quarter Production Update
14th Oct 20157:00 amRNSAsacha mining and production update
28th Sep 20157:00 amRNSResults for the half year ended 30 Jun 2015
13th Jul 20157:00 amRNSAsacha production update
29th Jun 201512:47 pmRNSResult of Annual General Meeting
29th Jun 20159:10 amRNSAsacha mining and production update
8th Jun 20157:00 amRNS2014 Final Results and Notice of AGM
17th Apr 20157:00 amRNSAsacha mining and production update
26th Jan 20157:00 amRNSAsacha mining and production update
20th Oct 20147:00 amRNSAsacha mining and production update
30th Sep 20147:00 amRNSInterim Results for the half year ended 30/6/2014
11th Sep 20147:00 amRNSProduction Update & Rodnikova Licence Termination
17th Jul 20147:00 amRNSAsacha mining and production update
30th Jun 20143:00 pmRNSResult of AGM & Directorate Change
30th Jun 20147:00 amRNSAsacha mining and production update
9th Jun 20147:00 amRNSAnnual Financial Results & Notice of AGM
24th Apr 20147:00 amRNSAsacha mining and production update
21st Jan 20147:00 amRNSAsacha Mining and Production Update
17th Oct 20137:00 amRNSAsacha Mining & Production Update
30th Sep 20137:00 amRNSInterim results for the period ended 30 June 2013
19th Jul 20137:00 amRNSAsacha mining and production update
26th Jun 201311:24 amRNSResult of AGM
26th Jun 20137:00 amRNSAsacha mining and production update
19th Jun 20139:00 amRNSDirectorate Changes
5th Jun 20137:00 amRNSFinal Results for the year ended 31 December 2012
16th Apr 20137:00 amRNSAsacha mining and production update
22nd Feb 201310:12 amRNSChange of Adviser
23rd Jan 20137:00 amRNSAsacha Mining and Production Update
29th Oct 20127:00 amRNSAsacha Mining and Production Update
27th Sep 20127:00 amRNSHalf Yearly Report
16th Jul 20127:00 amRNSAsacha Mining & Production Update & New Loans
22nd Jun 201212:49 pmRNSAGM Statement
22nd Jun 20127:00 amRNSAGM Asacha Production Update
29th May 20127:00 amRNSPosting of Final Results and Notice of AGM
28th May 20127:00 amRNSFinal Results for the year ended 31 December 2011
24th Apr 20127:00 amRNSAsacha Mining and Production Update
3rd Feb 201212:33 pmRNSConversion of debt and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.