Trans-Siberian Gold plc

 

Asacha project update

 

 

London: 2 March 2011 - Trans-Siberian Gold plc ("TSG" or "the Company") (TSG.L)reports on the progress of construction at the Asacha site.

 

Underground mine development is continuing as planned. During January 2011 more than 130 metres and 1,500 m3 of mine development were completed. The ore stockpile at 31 January 2011 comprised more than 62,000 tonnes.

 

By mid February 2011, more than half of the plant building's internal concrete walls had been completed. The building's multi-layer roofing with thermal insulation was close to completion with 100% of the lower layer installed. Construction of ventilation and heating systems is underway. The coarse ore bin's concrete parts are also under construction. 

In spite of snowstorms and strong winds earthwork and geomembrane laying activities on the tailings storage facility have continued.

 

The thermally insulated repair shop building is ready, except for completion of its supply system, concrete floor and equipment foundations. Cold storage hangars have been completed and the sewage treatment facility awaits installation of its power supply, ventilation and heating. Construction of the site's water, heat supply and sewage networks is in progress. The powerline from the site's diesel generators to the mine has been completed. The license for cyanide storage has been granted and the facility commissioned.

 

As a result of a 30% increase in diesel fuel costs, additional soil replacement works for tailings storage and the water treatment pond and additional operating expenditure due to the extended construction period, the total capital cost of the Asacha project prior to commencement of production is now estimated at $128.5 million, net of $10.2 million VAT recoveries, compared to the September 2010 estimate of $124.5 million (net of $8.3 million VAT recoveries). The total project cost includes pre-commissioning mining and plant costs of $4 million, other pre-operating expenditure of $36.8 million, "first fill" equipment spares and consumables of $1 million and contingency of $0.6 million.

 

At a gold price of $850/oz, Life of mine ("LOM") cash costs on an all equity basis on total gold production of 590,000 oz are forecast at $218/oz, before taking account of a $17/oz credit from silver production (based on an assumed silver price of $10/oz). Cash costs including all royalties and taxes (in total $72.9 million, net of VAT recoveries), on an all equity basis are forecast at $342/oz. Total costs on the same basis, after depreciation of all capital expenditure (including $27.5 million post start up) and pre-start up mining and other operating expenditure, are forecast at $609/oz, giving a $241/oz margin at a gold price of $850/oz.

 

Actual expenditure on the project up to December 2010 amounted to $112 million, net of $7.7 million VAT recovered. The remaining costs prior to the commencement of production are estimated at $16.5 million, net of further VAT recoveries of $2.5 million, comprising:

 

 

 

$ million

Capital expenditure

Mine and mining equipment and facilities

1.1

 

Gold plant, site facilities and tailings storage (1st phase)

8.0

 

Off-site power supply and other infrastructure

2.7

 

Contingency

0.6

 

Total capital

12.4

Other costs

Pre-production mining, spares and consumables and other operating costs

6.6

 

 

19.0

Less VAT recoveries

 

2.5

 

 

16.5

 

 

A further $27.5 million of capital expenditure is expected to be incurred after the commencement of production (including $6.3 million on mine development, $5.1 million on the plant, tailings storage and solid waste landfill, $11.6 million for the completion of the external power line and $4.5 million contingency).

 

 

 

Ends

 

Contacts:

 

TSG

+44 (0) 1480 811871

Simon Olsen

 

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJBMRTMBJMBBB
Date   Source Headline
29th Apr 202010:37 amRNSHolding(s) in Company
27th Apr 20207:00 amRNSDrilling Results & Exploration Update
23rd Apr 20207:00 amRNSQ1 2020 Production Update
14th Apr 20207:00 amRNSUpdated Corporate Presentation
24th Mar 20202:05 pmRNSSecond Price Monitoring Extn
24th Mar 20202:01 pmRNSPrice Monitoring Extension
20th Mar 20207:00 amRNSCompany & Operations Update
12th Mar 20204:42 pmRNSSecond Price Monitoring Extn
12th Mar 20204:40 pmRNSPrice Monitoring Extension
26th Feb 202011:05 amRNSSecond Price Monitoring Extn
26th Feb 202011:00 amRNSPrice Monitoring Extension
10th Feb 20207:00 amRNSMineral Resource Update
29th Jan 20207:00 amRNS2020 Guidance
28th Jan 20209:00 amRNSPrice Monitoring Extension
28th Jan 20207:00 amRNSQ4 & FY19 Production Update
15th Jan 20207:00 amRNSDrilling & Exploration Update
8th Jan 202011:06 amRNSSecond Price Monitoring Extn
8th Jan 202011:00 amRNSPrice Monitoring Extension
8th Jan 20207:00 amRNSMineral Resource Update
7th Jan 20202:32 pmRNSHolding(s) in Company
3rd Jan 20207:00 amRNSEnergy Subsidy Agreement
16th Dec 20197:00 amRNSAdmission to Advanced Special Economic Zone
2nd Dec 20197:00 amRNSRelationship Agreement
2nd Dec 20197:00 amRNSSignificant Shareholders' Holdings
22nd Oct 20197:00 amRNSQ3 2019 Production Update
18th Oct 20197:00 amRNSInterim Dividend Currency Exchange
2nd Oct 20197:00 amRNSSenior Management Appointment
19th Sep 20197:00 amRNSInterim Results
11th Sep 201911:05 amRNSSecond Price Monitoring Extn
11th Sep 201911:00 amRNSPrice Monitoring Extension
20th Aug 20197:00 amRNSReport on Tailings Management Facilities
1st Aug 20197:00 amRNSQ2 2019 Production Update
12th Jul 20197:19 amRNSSenior Management Appointment
12th Jul 20197:17 amRNSTransaction in Own Shares (Completion of Buyback)
12th Jul 20197:11 amRNSFinal Dividend Currency Exchange Rate
1st Jul 20197:00 amRNSNew Corporate Presentation
27th Jun 20192:21 pmRNSResult of AGM
17th Jun 20192:07 pmRNSResult of General Meeting
17th Jun 20197:01 amRNSSenior Management Appointment
14th Jun 20197:00 amRNSNotice of AGM and Dividend Timetable
5th Jun 20197:00 amRNSFinal Results
31st May 20197:00 amRNSAppointment of Director
31st May 20197:00 amRNSMineral Resource Update
24th May 20197:00 amRNSPosting of Circular and Notice of General Meeting
16th May 20197:00 amRNSConfirmation of Debt Financing
3rd May 20197:00 amRNSProposed Share Buyback
29th Apr 20197:00 amRNSQ1 2019 Production Update
23rd Apr 20197:00 amRNSRosnedra issues licence for Rodnikova deposit
3rd Apr 20197:00 amRNSStatement re Rodnikova Deposit
20th Feb 20197:00 amRNSChange of Adviser

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.