We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTSG.L Regulatory News (TSG)

  • There is currently no data for TSG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q4 & FY19 Production Update

28 Jan 2020 07:00

RNS Number : 0772B
Trans-Siberian Gold PLC
28 January 2020
 

 

28 January 2020

Trans-Siberian Gold plc

("TSG" or the "Company")

Q4 and FY19 Production Update

Trans-Siberian Gold plc (TSG.LN), a low cost, high grade gold producer in Russia, announces its production update at the Asacha Gold Mine for the three months ended 31 December 2019 ("Q4" or the "Period") and for the 12 months ended 31 December 2019 ("FY19").

 

Q4 Highlights

·; Gold revenues of $18.3 million* (Q4 2018: $20.1million)

·; Average realised gold price of $1,489/oz (Q4 2018: $1,228/oz)

·; Gold production of 8,970 oz (Q4 2018: 13,069 oz)

·; Average gold grade of 6.0 g/t (Q4 2018: 9.1 g/t)

·; Gold sales of 12,302 oz (Q4 2018: 16,399 oz)

·; 1 lost-time injury during Q4 2019

 

FY19 Highlights

·; All-time record annual gold production of 43,479 oz, representing a 3.2% YoY increase (FY 2018: 42,128 oz)

·; Record annual revenue at $63.1 million*, up by 5.5% YoY (FY 2018: $59.8 million)

·; Significant increase in estimated average gold price of 10.6% YoY at $1,399/ oz (FY 2018: $1,265/ oz)

·; Average gold grades 6.2% higher YoY at 7.8 g/t (FY 2018: 7.4 g/t)

·; 7 lost-time injuries, zero fatalities during FY 2019

 

Alexander Dorogov, Chief Executive Officer of TSG, commented:

"We are extremely pleased with Trans-Siberian Gold's performance in 2019. I am delighted to report that we have comfortably hit the upper end of our annual production guidance with a total gold output of 43,479oz for 2019. Corresponding with record production and favourable gold prices, we are pleased to report all-time record revenue of approximately $63 million for the year. We have worked hard to improve the efficiency of our operations and our understanding of the orebody at the Asacha Gold Mine, which is reflected in these results. We have an aggressive exploration and development plan for Asacha which is well underway. We look forward to providing formal guidance for 2020 shortly."

 

Production Summary

Mining and production data for Q4 and FY 2019 at the Asacha Gold Mine is shown in the following tables:

Q4 2019

Metric

Q4

Q4

Y-on-Y

Q3

Q-on-Q

2018

2019

% Change

2019

% Change

Mine development

(m)

1,769

1,452

-17.9%

1,903

-23.7%

Ore extracted

(tonnes)

41,006

34,050

-17.0%

34,245

-0.6%

Ore processed

(tonnes)

47,530

48,573

2.2%

48,996

-0.9%

Grade, gold

(g/t)

9.1

6.0

-34.7%

8.3

-28.3%

Grade, silver

(g/t)

28.6

22.4

-21.8%

18.4

21.6%

Recovery, gold

(%)

95.2

95.0

-0.2%

95.2

-0.3%

Recovery, silver

(%)

76.1

76.0

0.0%

80.7

-5.7%

Gold in dore

(oz)

13,069

8,970

-31.4%

12,620

-28.9%

Silver in dore

(oz)

32,748

27,084

-17.3%

24,686

9.7%

Gold refined

(oz)

14,541

9,287

-36.1%

11,291

-17.7%

Silver refined

(oz)

35,186

24,429

-30.6%

21,866

11.7%

Gold sold

(oz)

16,399

12,302

-25.0%

9,417

30.6%

Silver sold

(oz)

29,333

24,577

-16.2%

21,959

11.9%

Gold price

($/oz)

1,228

1,489

21.3%

1,485

0.3%

Silver price

($/oz)

14.5

17.5

20.3%

17.0

2.4%

Gold Revenue*

 ($,000)

20,135

18,324

-9.0%

13,984

31.0%

Silver Revenue*

 ($,000)

426

429

0.8%

374

14.6%

Total Revenue*

 ($,000)

20,560

18,753

-8.8%

14,359

30.6%

 

 

FY 2019

Metric

Actual

Actual

Actual

Y-on-Y

2017

 

2018

 

2019

 

% Change

Mine development

(m)

5,780

6,415

7,239

12.9%

Ore extracted

(tonnes)

198,349

173,597

142,151

-18.1%

Ore processed

(tonnes)

184,433

189,695

179,373

-5.4%

Grade, gold

(g/t)

6.6

7.4

7.8

6.2%

Grade, silver

(g/t)

12.3

22.8

23.4

2.8%

Recovery, gold

(%)

94.4

94.9

95.3

0.4%

Recovery, silver

(%)

78.7

76.7

81.5

6.2%

Gold in dore

(oz)

36,714

42,128

43,479

3.2%

Silver in dore

(oz)

57,072

105,069

111,557

6.2%

Gold refined

(oz)

33,872

46,053

43,733

-5.0%

Silver refined

(oz)

52,746

108,191

109,851

1.5%

Gold sold

(oz)

33,870

45,956

43,782

-4.7%

Silver sold

(oz)

46,125

108,749

115,801

6.5%

Gold price

($/oz)

1,261

1,265

1,399

10.6%

Silver price

($/oz)

16.3

15.2

16.0

5.4%

Gold Revenue*

 ($,000)

42,708

58,143

61,259

5.4%

Silver Revenue*

 ($,000)

754

1,649

1,851

12.2%

Total Revenue*

 ($,000)

43,462

59,792

63,110

5.5%

 

*Note: Unaudited figure for 2019

Totals may not add up due to rounding

Commentary

2019 has been an excellent year of mining performance at the Asacha Gold Mine.

In 2019, the gold price enjoyed its strongest performance since 2010. This, together with record gold production in 2019, contributed to the achievement of record revenues for Trans-Siberian Gold of approximately $63.1 million. In particular, the grade of gold produced has shown continued year on year improvement as well as sustained high recoveries year on year.

On a comparative basis the performance in Q4 2019 fell short of the record performance in Q4 2018. During the Period, mining was mostly conducted in the south and north extreme flanks of RL100 and below. As previously announced, in the Main Zone, gold mineralisation becomes weaker and more erratic at depth. This vertical zonation is typical of epithermal systems. Lower grade stoping ore was required to be blended with existing stockpiled ore, which resulted in a lower average mill feed grade.

Outlook

As previously announced, Trans-Siberian Gold has identified clear priorities for 2020, including underground and surface drilling campaigns at the Main and East zones of the Asacha Gold Mine, with a total of 25,000 m planned for the 2019-2020 drill campaign over the Asacha licence area.

The first drilling results from that campaign have been very positive (as previously announced) and we look forward to providing updates on the Group's progress in due course.

Additionally, the Group expects to publish a JORC-compliant Mineral Resource Estimate for the Rodnikova deposit in the first quarter of 2020 and thereafter expects to prepare an internal scoping study to assess the development options for the deposit.

Trans-Siberian Gold continues to identify and evaluate selected strategic M&A opportunities and will consider potential judicious investments or Joint Ventures, in line with our strategy to grow and sustainably return capital to investors.

Production guidance for 2020 will be published shortly.

TSG expects to report first quarter 2020 gold production from the Asacha Gold Mine in April 2020.

 

ENDS

Contacts:

 

TSG

Stewart Dickson

+44 (0) 7799 694195

Arden Partners plc

Paul Shackleton (Corporate Finance)Tim Dainton / Fraser Marshall (Equity Sales)

+44 (0) 207 614 5900

Hudson Sandler (Financial PR)

Charlie Jack / Katerina Parker / Elfreda Kent

+44 (0) 207 796 4133

 

About TSG

TSG is focused on low cost, high grade mining operations and stable gold production from its 100% owned Asacha Gold Mine in Far East Russia. The Company also holds the licence for the development and exploration of the Rodnikova deposit, one of the largest gold fields in South Kamchatka.

Additional information is available from the Company's website: www.trans-siberiangold.com

 

Market Abuse Regulations

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

Abbreviations

g/t grammes per tonne

oz ounce

m metre

 

Disclaimer

This announcement contains "forward-looking statements" - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as "expects," "anticipates," "intends," "plans," "believes," "seeks," "should" or "will." Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets, fluctuations in interest and/or exchange rates and metal prices; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
TSTDBGDBLDDDGGR
Date   Source Headline
9th Aug 20217:00 amRNSCancellation - Trans-Siberian Gold Plc
2nd Aug 20217:00 amRNSH1 Production & Operations Update
28th Jul 20213:34 pmRNSHolding(s) in Company
28th Jul 202110:58 amRNSTrans-Siberian Gold PLC - Offer Update
28th Jul 20217:05 amRNSHolding(s) in Company
27th Jul 202110:04 amRNSHolding(s) in Company
23rd Jul 20216:18 pmRNSTrans-Siberian Gold PLC - Offer Update
16th Jul 202110:07 amRNSForm 8.5 (EPT/RI)
15th Jul 20212:59 pmRNSHolding(s) in Company
14th Jul 20219:12 amRNSForm 8.3 - Trans-Siberian Gold Plc
13th Jul 20219:54 amRNSForm 8.3 - [TRANS-SIBERIAN GOLD PLC]
12th Jul 20215:30 pmRNSTrans-Siberian Gold
12th Jul 202110:54 amRNSForm 8.5 (EPT/RI)
12th Jul 20219:45 amRNSCancellation of Trading on AIM
9th Jul 20215:56 pmRNSTSG - Wholly Unconditional Announcement
9th Jul 202112:03 pmRNSHolding(s) in Company
9th Jul 202110:19 amRNSForm 8.5 (EPT/RI)
1st Jul 202112:01 pmRNSForm 8.5 (EPT/RI)
1st Jul 20217:00 amRNSResult of AGM
30th Jun 202110:00 amRNSForm 8.5 (EPT/RI)
28th Jun 202112:55 pmRNSForm 8.5 (EPT/RI)
25th Jun 202110:36 amRNSForm 8.5 (EPT/RI)
23rd Jun 20218:27 amRNSForm 8.5 (EPT/RI)
18th Jun 20219:48 amRNSForm 8.3 - Trans-Siberian Gold Plc
17th Jun 202111:29 amRNSForm 8.3 - Trans-Siberian Gold Plc
15th Jun 202110:39 amRNSForm 8.5 (EPT/RI)
11th Jun 20213:30 pmRNSForm 8.3 - TSG LN
11th Jun 20219:33 amRNSForm 8.3 - Trans-Siberian Gold Plc
10th Jun 20219:00 amRNSForm 8.5 (EPT/NON-RI)
9th Jun 20216:30 pmRNSTrans-Siberian Gold PLC - Offer Document Posting
9th Jun 202110:50 amRNSForm 8.5 (EPT/RI)
8th Jun 202112:32 pmRNSForm 8.5 (EPT/RI)
8th Jun 202110:25 amRNSDirectorate Changes
8th Jun 20217:00 amRNSFinal Results
4th Jun 20217:53 amRNSForm 8.3 - Trans-Siberian Gold Plc
3rd Jun 20219:11 amRNSForm 8.3 - Trans-Siberian Gold Plc
2nd Jun 20214:41 pmRNSHolding(s) in Company
2nd Jun 20213:55 pmRNSHolding(s) in Company
2nd Jun 20213:53 pmRNSHolding(s) in Company
2nd Jun 202110:11 amRNSForm 8.5 (EPT/RI)
2nd Jun 20219:49 amRNSForm 8.3 - Trans-Siberian Gold Plc
1st Jun 20217:00 amRNSHolding(s) in Company
28th May 20215:31 pmRNSForm 8 (DD) - Trans-Siberian Gold PLC
28th May 20214:58 pmRNSOffer Update
28th May 20213:54 pmRNSHolding(s) in Company
26th May 202111:44 amRNSTrans-Siberian Gold PLC - Offer Update
20th May 202110:00 amRNSForm 8.5 (EPT/RI)
19th May 20211:05 pmRNSTrans-Siberian Gold PLC - Regulatory Approval
19th May 20219:14 amRNSForm 8.3 - Trans-Siberian Gold Plc
18th May 20219:59 amRNSForm 8.3 - Trans-Siberian Gold Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.