Asacha project update

15 Dec 2010 07:00

RNS Number : 9522X
Trans-Siberian Gold PLC
15 December 2010
 



 

 

 

Trans-Siberian Gold plc

 

Asacha project update

 

 

London: 15 December 2010 - Trans-Siberian Gold plc ("TSG" or "the Company") (TSG.L) reports on the progress of construction at the Asacha site.

 

Underground mine development is continuing as scheduled. During the 11 months ended 30 November 2010 mine development and preparation works, by-product extraction and exploration works amounted to more than 1,450 metres and more than 15,000 m3. Ore mined during mine development activities in this period totalled about 18,700 tonnes; including the adit ore and the pre-production ore mined in the previous periods the ore stockpile at 30 November 2010 consisted of more than 58,000 tonnes. The 2011 Mining Plan, which includes the start of extraction works, was approved by Rostechnadzor, the Federal agency responsible for industrial and environmental safety, on 16 November 2010.

 

Roofing and covering of the plant building with wall panels is almost complete. The technical team from the manufacturer of the major plant equipment is on site to supervise its installation. Mounting of ventilation equipment is in progress and contractors have started the installation of pipework, electrical equipment and plant lighting.

 

As previously reported, work on the tailings storage facility was affected by exceptional rainfall during the summer. The additional labour and equipment focused on this area to ensure completion of soil removal during early autumn has resulted in significant progress, which has allowed the contractor to start laying the facility's geomembrane. To date about 50 per cent. of the area has been covered and construction of the technological pipelines is scheduled for the first quarter of 2011.

 

The work on the camp boiler unit and heating has been completed. Fuel and water tanks have been assembled and their respective piping arrangements are now under way. The cyanide storage facility is finished and is being prepared for commissioning. Construction of the other infrastructure objects is still under way, including the repair shop, sewage treatment facility, settling pond and intra-site networks for water, heat, power supply and sewage.

 

In spite of the progress achieved, we believe that several factors will delay the commencement of gold production, previously anticipated to be during the first quarter of 2011:

 

- delay in the manufacture and delivery of high-voltage cables and some other electrical equipment, pumps for the fire station and sewage treatment;

- additional design works required for early commissioning of the cyanide and fuel storage facilities in accordance with regional and local regulations; and

- the early onset of winter snow has and will continue to hamper progress.

 

Having considered the likely impact of these factors on the pace of the construction process, the Directors now expect that an additional 3 to 4 months will be required to complete the plant, on which basis gold production at Asacha is expected to commence around mid-year 2011. The Directors intend to provide shareholders with more frequent and broadly monthly updates on further progress made at Asacha during the remaining period of construction.

 

 

 

 

Ends

 

Contacts:

 

TSG

+44 (0) 1480 811871

Simon Olsen

 

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLTIBATMBABBAM
Date   Source Headline
9th Aug 20217:00 amRNSCancellation - Trans-Siberian Gold Plc
2nd Aug 20217:00 amRNSH1 Production & Operations Update
28th Jul 20213:34 pmRNSHolding(s) in Company
28th Jul 202110:58 amRNSTrans-Siberian Gold PLC - Offer Update
28th Jul 20217:05 amRNSHolding(s) in Company
27th Jul 202110:04 amRNSHolding(s) in Company
23rd Jul 20216:18 pmRNSTrans-Siberian Gold PLC - Offer Update
16th Jul 202110:07 amRNSForm 8.5 (EPT/RI)
15th Jul 20212:59 pmRNSHolding(s) in Company
14th Jul 20219:12 amRNSForm 8.3 - Trans-Siberian Gold Plc
13th Jul 20219:54 amRNSForm 8.3 - [TRANS-SIBERIAN GOLD PLC]
12th Jul 20215:30 pmRNSTrans-Siberian Gold
12th Jul 202110:54 amRNSForm 8.5 (EPT/RI)
12th Jul 20219:45 amRNSCancellation of Trading on AIM
9th Jul 20215:56 pmRNSTSG - Wholly Unconditional Announcement
9th Jul 202112:03 pmRNSHolding(s) in Company
9th Jul 202110:19 amRNSForm 8.5 (EPT/RI)
1st Jul 202112:01 pmRNSForm 8.5 (EPT/RI)
1st Jul 20217:00 amRNSResult of AGM
30th Jun 202110:00 amRNSForm 8.5 (EPT/RI)
28th Jun 202112:55 pmRNSForm 8.5 (EPT/RI)
25th Jun 202110:36 amRNSForm 8.5 (EPT/RI)
23rd Jun 20218:27 amRNSForm 8.5 (EPT/RI)
18th Jun 20219:48 amRNSForm 8.3 - Trans-Siberian Gold Plc
17th Jun 202111:29 amRNSForm 8.3 - Trans-Siberian Gold Plc
15th Jun 202110:39 amRNSForm 8.5 (EPT/RI)
11th Jun 20213:30 pmRNSForm 8.3 - TSG LN
11th Jun 20219:33 amRNSForm 8.3 - Trans-Siberian Gold Plc
10th Jun 20219:00 amRNSForm 8.5 (EPT/NON-RI)
9th Jun 20216:30 pmRNSTrans-Siberian Gold PLC - Offer Document Posting
9th Jun 202110:50 amRNSForm 8.5 (EPT/RI)
8th Jun 202112:32 pmRNSForm 8.5 (EPT/RI)
8th Jun 202110:25 amRNSDirectorate Changes
8th Jun 20217:00 amRNSFinal Results
4th Jun 20217:53 amRNSForm 8.3 - Trans-Siberian Gold Plc
3rd Jun 20219:11 amRNSForm 8.3 - Trans-Siberian Gold Plc
2nd Jun 20214:41 pmRNSHolding(s) in Company
2nd Jun 20213:55 pmRNSHolding(s) in Company
2nd Jun 20213:53 pmRNSHolding(s) in Company
2nd Jun 202110:11 amRNSForm 8.5 (EPT/RI)
2nd Jun 20219:49 amRNSForm 8.3 - Trans-Siberian Gold Plc
1st Jun 20217:00 amRNSHolding(s) in Company
28th May 20215:31 pmRNSForm 8 (DD) - Trans-Siberian Gold PLC
28th May 20214:58 pmRNSOffer Update
28th May 20213:54 pmRNSHolding(s) in Company
26th May 202111:44 amRNSTrans-Siberian Gold PLC - Offer Update
20th May 202110:00 amRNSForm 8.5 (EPT/RI)
19th May 20211:05 pmRNSTrans-Siberian Gold PLC - Regulatory Approval
19th May 20219:14 amRNSForm 8.3 - Trans-Siberian Gold Plc
18th May 20219:59 amRNSForm 8.3 - Trans-Siberian Gold Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.