Asacha project update

15 Dec 2010 07:00

RNS Number : 9522X
Trans-Siberian Gold PLC
15 December 2010
 



 

 

 

Trans-Siberian Gold plc

 

Asacha project update

 

 

London: 15 December 2010 - Trans-Siberian Gold plc ("TSG" or "the Company") (TSG.L) reports on the progress of construction at the Asacha site.

 

Underground mine development is continuing as scheduled. During the 11 months ended 30 November 2010 mine development and preparation works, by-product extraction and exploration works amounted to more than 1,450 metres and more than 15,000 m3. Ore mined during mine development activities in this period totalled about 18,700 tonnes; including the adit ore and the pre-production ore mined in the previous periods the ore stockpile at 30 November 2010 consisted of more than 58,000 tonnes. The 2011 Mining Plan, which includes the start of extraction works, was approved by Rostechnadzor, the Federal agency responsible for industrial and environmental safety, on 16 November 2010.

 

Roofing and covering of the plant building with wall panels is almost complete. The technical team from the manufacturer of the major plant equipment is on site to supervise its installation. Mounting of ventilation equipment is in progress and contractors have started the installation of pipework, electrical equipment and plant lighting.

 

As previously reported, work on the tailings storage facility was affected by exceptional rainfall during the summer. The additional labour and equipment focused on this area to ensure completion of soil removal during early autumn has resulted in significant progress, which has allowed the contractor to start laying the facility's geomembrane. To date about 50 per cent. of the area has been covered and construction of the technological pipelines is scheduled for the first quarter of 2011.

 

The work on the camp boiler unit and heating has been completed. Fuel and water tanks have been assembled and their respective piping arrangements are now under way. The cyanide storage facility is finished and is being prepared for commissioning. Construction of the other infrastructure objects is still under way, including the repair shop, sewage treatment facility, settling pond and intra-site networks for water, heat, power supply and sewage.

 

In spite of the progress achieved, we believe that several factors will delay the commencement of gold production, previously anticipated to be during the first quarter of 2011:

 

- delay in the manufacture and delivery of high-voltage cables and some other electrical equipment, pumps for the fire station and sewage treatment;

- additional design works required for early commissioning of the cyanide and fuel storage facilities in accordance with regional and local regulations; and

- the early onset of winter snow has and will continue to hamper progress.

 

Having considered the likely impact of these factors on the pace of the construction process, the Directors now expect that an additional 3 to 4 months will be required to complete the plant, on which basis gold production at Asacha is expected to commence around mid-year 2011. The Directors intend to provide shareholders with more frequent and broadly monthly updates on further progress made at Asacha during the remaining period of construction.

 

 

 

 

Ends

 

Contacts:

 

TSG

+44 (0) 1480 811871

Simon Olsen

 

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLTIBATMBABBAM
Date   Source Headline
29th Apr 202010:37 amRNSHolding(s) in Company
27th Apr 20207:00 amRNSDrilling Results & Exploration Update
23rd Apr 20207:00 amRNSQ1 2020 Production Update
14th Apr 20207:00 amRNSUpdated Corporate Presentation
24th Mar 20202:05 pmRNSSecond Price Monitoring Extn
24th Mar 20202:01 pmRNSPrice Monitoring Extension
20th Mar 20207:00 amRNSCompany & Operations Update
12th Mar 20204:42 pmRNSSecond Price Monitoring Extn
12th Mar 20204:40 pmRNSPrice Monitoring Extension
26th Feb 202011:05 amRNSSecond Price Monitoring Extn
26th Feb 202011:00 amRNSPrice Monitoring Extension
10th Feb 20207:00 amRNSMineral Resource Update
29th Jan 20207:00 amRNS2020 Guidance
28th Jan 20209:00 amRNSPrice Monitoring Extension
28th Jan 20207:00 amRNSQ4 & FY19 Production Update
15th Jan 20207:00 amRNSDrilling & Exploration Update
8th Jan 202011:06 amRNSSecond Price Monitoring Extn
8th Jan 202011:00 amRNSPrice Monitoring Extension
8th Jan 20207:00 amRNSMineral Resource Update
7th Jan 20202:32 pmRNSHolding(s) in Company
3rd Jan 20207:00 amRNSEnergy Subsidy Agreement
16th Dec 20197:00 amRNSAdmission to Advanced Special Economic Zone
2nd Dec 20197:00 amRNSRelationship Agreement
2nd Dec 20197:00 amRNSSignificant Shareholders' Holdings
22nd Oct 20197:00 amRNSQ3 2019 Production Update
18th Oct 20197:00 amRNSInterim Dividend Currency Exchange
2nd Oct 20197:00 amRNSSenior Management Appointment
19th Sep 20197:00 amRNSInterim Results
11th Sep 201911:05 amRNSSecond Price Monitoring Extn
11th Sep 201911:00 amRNSPrice Monitoring Extension
20th Aug 20197:00 amRNSReport on Tailings Management Facilities
1st Aug 20197:00 amRNSQ2 2019 Production Update
12th Jul 20197:19 amRNSSenior Management Appointment
12th Jul 20197:17 amRNSTransaction in Own Shares (Completion of Buyback)
12th Jul 20197:11 amRNSFinal Dividend Currency Exchange Rate
1st Jul 20197:00 amRNSNew Corporate Presentation
27th Jun 20192:21 pmRNSResult of AGM
17th Jun 20192:07 pmRNSResult of General Meeting
17th Jun 20197:01 amRNSSenior Management Appointment
14th Jun 20197:00 amRNSNotice of AGM and Dividend Timetable
5th Jun 20197:00 amRNSFinal Results
31st May 20197:00 amRNSAppointment of Director
31st May 20197:00 amRNSMineral Resource Update
24th May 20197:00 amRNSPosting of Circular and Notice of General Meeting
16th May 20197:00 amRNSConfirmation of Debt Financing
3rd May 20197:00 amRNSProposed Share Buyback
29th Apr 20197:00 amRNSQ1 2019 Production Update
23rd Apr 20197:00 amRNSRosnedra issues licence for Rodnikova deposit
3rd Apr 20197:00 amRNSStatement re Rodnikova Deposit
20th Feb 20197:00 amRNSChange of Adviser

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.