Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.625    0.00 (0.00%)
Bid:
2.55
Ask:
2.70
Spread: 0.15 (5.882%)
Market Cap: £84.81m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Completion of Drilling Programme at Tjate

18 Feb 2009 09:00

RNS Number : 4995N
Jubilee Platinum PLC
18 February 2009
 



18 February 2009

AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

JUBILEE PLATINUM PLC

("Jubilee" or "the Company")

Completion of Drilling Programme at the Tjate project and Results Update

Jubilee Platinum, the AIM quoted and JSE Limited listed mining exploration and development Company with a focus on platinum group metals (PGM) in South Africa, is pleased to announce the completion of its 42-borehole drilling programme including new preliminary and final results from thirteen boreholes drilled on Jubilee's Tjate platinum project in the eastern Bushveld Complex in South Africa. This drilling programme forms part of Phase two of the feasibility study that commenced in early 2008.

Highlights 

The drilling programme for Phase two of the feasibility study has now been completed;

All 13 boreholes intersected the Merensky Reef (MR), (of which 2 intersected pothole facies), at expected projected depths (from plain elevation), with grades and thicknesses generally in line with the variability expected for this reef; 

Borehole DT35 intersected high assays in the motherhole MR (10.43 g/t 3PGE + Au) (combined platinum, palladium, rhodium and gold)0.35% nickel (Ni) and 0.21% copper (Cu) over 0.99 metres - further results awaited from additional deflection drilling;

Borehole DT40 intersected MR averaging 3.04 metres thick and assaying 6.71 g/t 3PGE+Au with 0.16% Ni and 0.10% Cu - further deflection results awaited; 

Boreholes DT30 and DT33, intersected specifically targeted UG2 chromitite (UG2) reef at projected depths with higher than expected grades of up to 7.8g/t 3PGE+Au; and  

Borehole FF01, which tested continuity of MR in the adjacent down dip farm Fernkloof, intersected MR at approximate target depth (1,597m down hole from collar).

Detailed results are summarised in Table 1 below.

 

Table 1 Summary of Merensky Reef (Optimal ("Mining") Cuts) and UG2 Chromitite reef Intersections 

Borehole

Reef 

Intersected 

 Depth 

(from collar) 

m

Weighted averages

Apparent Thickness m

3PGE+Au 

g/t

Estimated 5PGE+Au

g/t **

Copper 

%

Nickel

%

DT21

MR

1,098

1.04

4.15

4.4

0.12

0.21

DT22

MR

852

1.55 

4.43

4.7

0.12

0.21

DT24

MR

1,025

1.01

5.40

5.8

0.14

0.20

DT28 

MR

1,016

1.02

2.04

2.2

0.09

0.13

DT29 

MR pothole

1384

0.98

4.07

4.3

0.07

0.19

DT30

MR pothole *

1,291

1.13

0.00

0.00

0.00

0.00

DT31 

MR

1,210

1.02

2.04

2.2

0.09

0.13

DT33 

MR

1,344

1.08

2.65

2.8

0.09

0.13

DT35

MR motherhole *

1,252

0.99

10.43

11.1

0.21

0.35

DT36

MR *

705

1.46

4.48

4.8

0.10

0.13

DT38

MR *

1,095

1.19

2.67

3.11

0.13

0.18

DT40

MR

1,314

3.04

6.71

7.1

0.10

0.16

FF01

MR

1,597

2.81

2.72

2.9

0.08

0.13

DT30

UG2

1,602

0.65

7.85

9.2

na

na

DT33

UG2

1,700

0.66

7.74

9.1

na

na

DT36

UG2 pothole

1104

0.55

1.51

1.8

na

na

 

na not assayed/not applicable * deflections awaited ** factor applied to 3PGE+Au values to include ruthenium (Ru) and iridium (Ir) based on average of Ru and Ir analysis of four MR drill core and two UG2 drill core intersections selected.

Colin Bird, CEO of Jubilee and Tjate Project Manager said: "These new results continue to confirm the continuity at depth of the Merensky and UG2 reefs. The lower grades seen in some of the new borehole results correlate generally with a regional pothole within a lower grade area confined to the northwest of the farm Dsjate. The effect of this area will be considered in the options when delineating the resource and defining a resource estimate. The drilling programme for the second phase of the feasibility study was completed this month and the project is now rapidly advancing towards a definitive compliant mineral resource estimate." 

Note to Editors

The Tjate Project comprises three contiguous farms, totalling 5,143 hectares in the eastern Bushveld: Dsjate, Fernkloof and Quartz Hill. The farms are downdip of Impala Platinum's operating Marula platinum mine and of Anglo Platinum's developing Twickenham platinum mine. Jubilee is advancing the Project to feasibility study (FS).

SGS Lakefield Research Africa in Johannesburg carried out the analyses of the borehole core samples. This laboratory is SNAS TO169 accredited.

For further information please contact:

Colin Bird Nick Rome/Michael Kinirons

Jubilee Platinum plc Bishopsgate Communications Ltd 

Tel: +44 (0) 20 7584 2155 Tel +44 (0) 20 7562 3350

Gerard Kisbey-Green

Investec Bank plc

Tel +44 (0)20 7597 5000

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUWSWRKURUARR
Date   Source Headline
21st Jan 20257:00 amRNSAdditional power supply secured for Roan re-start
13th Jan 20257:00 amRNSOperational Update H1 FY2025
24th Dec 20247:00 amRNSHolding(s) in Company
16th Dec 20247:00 amRNSZambia Operations Update and Exercise of Options
21st Nov 20247:00 amRNSTR-1: notification of major holdings
20th Nov 20243:15 pmRNSExercise of Warrants
12th Nov 20242:20 pmRNSResult of AGM
7th Nov 20247:00 amRNSOperational Update Q1 FY2025
6th Nov 20242:30 pmRNSTR-1: Notification of major holdings
5th Nov 20247:00 amRNSAppointment of Remuneration Committee Chairperson
31st Oct 20247:00 amRNSBoard changes
16th Oct 20247:00 amRNSIntegrated Annual Report FY2024 & Notice of AGM
7th Oct 20247:00 amRNSNotice of Full Year Results Investor Presentation
7th Oct 20247:00 amRNSProject G Acquisition and Power Update
3rd Oct 20247:00 amRNSAudited Results for the year ended 30 June 2024
23rd Sep 20247:00 amRNSCopper Projects Update
19th Sep 20247:00 amRNSManagement changes
27th Aug 20247:00 amRNSPrivate Power Purchase Agreement in Zambia
21st Aug 20247:00 amRNSOperational Update Q4 FY2024
13th Aug 20247:00 amRNSRoan Front-End Module’s First Copper Concentrate
8th Aug 20247:30 amRNSRoan Upgrade Project Commences Operations
24th Jul 20241:00 pmRNSDirector/PDMR Shareholding
23rd Jul 20247:00 amRNSDirector/PDMR Shareholding
15th Jul 20247:00 amRNSChange of Broker
24th Jun 20247:00 amRNSRoll-out of Integrated Copper Strategy in Zambia
10th Jun 20242:10 pmRNSTR-1: Notification of major holdings
3rd Jun 20248:00 amRNSExercise of Warrants and Options
23rd Apr 20247:00 amRNSAppointment of Joint Corporate Broker
18th Apr 20247:00 amRNSOperational Update Q3 FY2024
28th Mar 20247:00 amRNSProjects Update
6th Mar 20243:00 pmRNSExercise of Options
6th Mar 20247:00 amRNSChanges to the Board & New Dedicated Exec Boards
29th Feb 20247:00 amRNSInterim Results 2023 Presentation
28th Feb 20249:31 amRNSInterim Results 2023 Presentation Re-scheduled
26th Feb 20247:00 amRNSInterim Financial Report 6 months to December 2023
8th Feb 20247:00 amRNSZambia Copper Expansion Update
23rd Jan 20247:00 amRNSOperational and Projects Update Q2 FY2024
4th Jan 20243:00 pmRNSTR-1: Notification of major holdings
3rd Jan 202412:00 pmRNSResults of General Meeting
15th Dec 20231:53 pmRNSResults of Placing and Notice of General Meeting
15th Dec 20237:00 amRNSProposed Placing
13th Dec 20232:30 pmRNSReply to Shareholder Correspondence Regarding a GM
12th Dec 20237:00 amRNSInvestment in Historical Waste Rock Dump in Zambia
21st Nov 20233:30 pmRNSInvestor Webcast
17th Nov 20237:00 amRNSNew Corporate Presentation
3rd Nov 20231:30 pmRNSResult of AGM
1st Nov 20237:05 amRNSQ1 Operational Report to 30 September 2023
17th Oct 20237:00 amRNSAward of New Slag Project with Mopani Copper Mines
11th Oct 20237:00 amRNSFinal Results and Notice of AGM
5th Oct 20237:00 amRNSNotice of Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.