If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.25    0.04 (1.81%)
Bid:
2.20
Ask:
2.30
Spread: 0.10 (4.545%)
Market Cap: £72.69m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Completion of Drilling Programme at Tjate

18 Feb 2009 09:00

RNS Number : 4995N
Jubilee Platinum PLC
18 February 2009
 



18 February 2009

AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

JUBILEE PLATINUM PLC

("Jubilee" or "the Company")

Completion of Drilling Programme at the Tjate project and Results Update

Jubilee Platinum, the AIM quoted and JSE Limited listed mining exploration and development Company with a focus on platinum group metals (PGM) in South Africa, is pleased to announce the completion of its 42-borehole drilling programme including new preliminary and final results from thirteen boreholes drilled on Jubilee's Tjate platinum project in the eastern Bushveld Complex in South Africa. This drilling programme forms part of Phase two of the feasibility study that commenced in early 2008.

Highlights 

The drilling programme for Phase two of the feasibility study has now been completed;

All 13 boreholes intersected the Merensky Reef (MR), (of which 2 intersected pothole facies), at expected projected depths (from plain elevation), with grades and thicknesses generally in line with the variability expected for this reef; 

Borehole DT35 intersected high assays in the motherhole MR (10.43 g/t 3PGE + Au) (combined platinum, palladium, rhodium and gold)0.35% nickel (Ni) and 0.21% copper (Cu) over 0.99 metres - further results awaited from additional deflection drilling;

Borehole DT40 intersected MR averaging 3.04 metres thick and assaying 6.71 g/t 3PGE+Au with 0.16% Ni and 0.10% Cu - further deflection results awaited; 

Boreholes DT30 and DT33, intersected specifically targeted UG2 chromitite (UG2) reef at projected depths with higher than expected grades of up to 7.8g/t 3PGE+Au; and  

Borehole FF01, which tested continuity of MR in the adjacent down dip farm Fernkloof, intersected MR at approximate target depth (1,597m down hole from collar).

Detailed results are summarised in Table 1 below.

 

Table 1 Summary of Merensky Reef (Optimal ("Mining") Cuts) and UG2 Chromitite reef Intersections 

Borehole

Reef 

Intersected 

 Depth 

(from collar) 

m

Weighted averages

Apparent Thickness m

3PGE+Au 

g/t

Estimated 5PGE+Au

g/t **

Copper 

%

Nickel

%

DT21

MR

1,098

1.04

4.15

4.4

0.12

0.21

DT22

MR

852

1.55 

4.43

4.7

0.12

0.21

DT24

MR

1,025

1.01

5.40

5.8

0.14

0.20

DT28 

MR

1,016

1.02

2.04

2.2

0.09

0.13

DT29 

MR pothole

1384

0.98

4.07

4.3

0.07

0.19

DT30

MR pothole *

1,291

1.13

0.00

0.00

0.00

0.00

DT31 

MR

1,210

1.02

2.04

2.2

0.09

0.13

DT33 

MR

1,344

1.08

2.65

2.8

0.09

0.13

DT35

MR motherhole *

1,252

0.99

10.43

11.1

0.21

0.35

DT36

MR *

705

1.46

4.48

4.8

0.10

0.13

DT38

MR *

1,095

1.19

2.67

3.11

0.13

0.18

DT40

MR

1,314

3.04

6.71

7.1

0.10

0.16

FF01

MR

1,597

2.81

2.72

2.9

0.08

0.13

DT30

UG2

1,602

0.65

7.85

9.2

na

na

DT33

UG2

1,700

0.66

7.74

9.1

na

na

DT36

UG2 pothole

1104

0.55

1.51

1.8

na

na

 

na not assayed/not applicable * deflections awaited ** factor applied to 3PGE+Au values to include ruthenium (Ru) and iridium (Ir) based on average of Ru and Ir analysis of four MR drill core and two UG2 drill core intersections selected.

Colin Bird, CEO of Jubilee and Tjate Project Manager said: "These new results continue to confirm the continuity at depth of the Merensky and UG2 reefs. The lower grades seen in some of the new borehole results correlate generally with a regional pothole within a lower grade area confined to the northwest of the farm Dsjate. The effect of this area will be considered in the options when delineating the resource and defining a resource estimate. The drilling programme for the second phase of the feasibility study was completed this month and the project is now rapidly advancing towards a definitive compliant mineral resource estimate." 

Note to Editors

The Tjate Project comprises three contiguous farms, totalling 5,143 hectares in the eastern Bushveld: Dsjate, Fernkloof and Quartz Hill. The farms are downdip of Impala Platinum's operating Marula platinum mine and of Anglo Platinum's developing Twickenham platinum mine. Jubilee is advancing the Project to feasibility study (FS).

SGS Lakefield Research Africa in Johannesburg carried out the analyses of the borehole core samples. This laboratory is SNAS TO169 accredited.

For further information please contact:

Colin Bird Nick Rome/Michael Kinirons

Jubilee Platinum plc Bishopsgate Communications Ltd 

Tel: +44 (0) 20 7584 2155 Tel +44 (0) 20 7562 3350

Gerard Kisbey-Green

Investec Bank plc

Tel +44 (0)20 7597 5000

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUWSWRKURUARR
Date   Source Headline
20th Mar 20194:18 pmRNSGeneral Operations and Projects Update
17th Jan 20198:30 amRNSQuarterly Operations Update Q4 2018
18th Dec 201812:38 pmRNSTR-1: Notification of major holdings
18th Dec 20188:30 amRNSTR-1: notification of major holdings
17th Dec 20187:00 amRNSCommissioning of fine chrome operation commences
10th Dec 20187:15 amRNSJubilee acquires major Chrome Processing Operation
6th Dec 20181:00 pmRNSResults of AGM
4th Dec 20187:02 amRNSSecond Price Monitoring Extn
4th Dec 20187:01 amRNSPrice Monitoring Extension
3rd Dec 20184:40 pmRNSSecond Price Monitoring Extn
3rd Dec 20184:35 pmRNSPrice Monitoring Extension
28th Nov 20181:30 pmRNSJubilee Live Interactive Webcast
14th Nov 20182:40 pmRNSAudited results for the year ended 30 June 2018
5th Nov 20188:00 amRNSMarket Update
17th Oct 20189:30 amRNSQuarterly Operations Update Q3 2018
3rd Aug 20187:00 amRNSClarification on BMR Group PLC & the Kabwe Project
19th Jul 20187:00 amRNSQuarterly Operations Update Q2 2018
2nd Jul 20187:00 amRNSKabwe Project Status Update
21st Jun 20183:00 pmRNSBoard Changes
12th Jun 20182:02 pmRNSTR-1: notification of major holdings
11th Jun 20188:30 amRNSPlacement of BMR Shares fully executed
7th Jun 20187:00 amRNSProjects Status Update
4th Jun 20189:15 amRNSKabwe and BMR Group PLC ("BMR") Update
2nd May 20187:00 amRNSJubilee Executes Kabwe Project Agreements
18th Apr 20187:00 amRNSJubilee Executes Processing Agreement
17th Apr 20187:00 amRNSQuarterly Operations Update & Tjate Share Issue
5th Apr 20187:00 amRNSKabwe Mining Licence Reinstated
29th Mar 201812:00 pmRNSFurther Kabwe Project Update
21st Mar 20187:00 amRNSAppointment of Broker
19th Mar 20181:45 pmRNSJubilee Live Interactive Webcast
7th Mar 20187:00 amRNSUNAUDITED INTERIM RESULTS 31 DECEMBER 2017
2nd Mar 201811:45 amRNSStatement regarding Broker
1st Mar 20187:00 amRNSFurther Kabwe Project Update
23rd Feb 20183:35 pmRNSFurther Kabwe Project Update
7th Feb 20185:00 pmRNSFurther Update re Kabwe project
7th Feb 20183:20 pmRNSUpdate on Kabwe project
6th Feb 20187:00 amRNSJubilee progresses Kabwe Project
5th Feb 20188:56 amRNSTR-1: notification of major holdings
1st Feb 201811:00 amRNSJubilee Live Interactive Webcast
30th Jan 20181:45 pmRNSQuarterly Operations Update
30th Jan 20188:00 amRNSTR-1: notification of major holdings
29th Jan 20184:48 pmRNSHolding(s) in Company
15th Jan 20181:00 pmRNSJubilee Acquires Significant Equity Position - BMR
9th Jan 20188:45 amRNSJubilee Secures Institutional Financing
5th Jan 20182:45 pmRNSJubilee Hernic PGM Project
5th Dec 20172:30 pmRNSChange of name to Jubilee Metals Group PLC
4th Dec 20173:10 pmRNSResults of AGM and Change of Name
20th Nov 20177:00 amRNSHernic Operations Update for October 2017
10th Nov 20177:00 amRNSNotice of AGM & Audited results for the year
26th Oct 20177:00 amRNSQuarterly Operations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.