If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.35    0.00 (0.00%)
Bid:
2.30
Ask:
2.40
Spread: 0.10 (4.348%)
Market Cap: £77.54m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Completion of Drilling Programme at Tjate

18 Feb 2009 09:00

RNS Number : 4995N
Jubilee Platinum PLC
18 February 2009
 



18 February 2009

AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

JUBILEE PLATINUM PLC

("Jubilee" or "the Company")

Completion of Drilling Programme at the Tjate project and Results Update

Jubilee Platinum, the AIM quoted and JSE Limited listed mining exploration and development Company with a focus on platinum group metals (PGM) in South Africa, is pleased to announce the completion of its 42-borehole drilling programme including new preliminary and final results from thirteen boreholes drilled on Jubilee's Tjate platinum project in the eastern Bushveld Complex in South Africa. This drilling programme forms part of Phase two of the feasibility study that commenced in early 2008.

Highlights 

The drilling programme for Phase two of the feasibility study has now been completed;

All 13 boreholes intersected the Merensky Reef (MR), (of which 2 intersected pothole facies), at expected projected depths (from plain elevation), with grades and thicknesses generally in line with the variability expected for this reef; 

Borehole DT35 intersected high assays in the motherhole MR (10.43 g/t 3PGE + Au) (combined platinum, palladium, rhodium and gold)0.35% nickel (Ni) and 0.21% copper (Cu) over 0.99 metres - further results awaited from additional deflection drilling;

Borehole DT40 intersected MR averaging 3.04 metres thick and assaying 6.71 g/t 3PGE+Au with 0.16% Ni and 0.10% Cu - further deflection results awaited; 

Boreholes DT30 and DT33, intersected specifically targeted UG2 chromitite (UG2) reef at projected depths with higher than expected grades of up to 7.8g/t 3PGE+Au; and  

Borehole FF01, which tested continuity of MR in the adjacent down dip farm Fernkloof, intersected MR at approximate target depth (1,597m down hole from collar).

Detailed results are summarised in Table 1 below.

 

Table 1 Summary of Merensky Reef (Optimal ("Mining") Cuts) and UG2 Chromitite reef Intersections 

Borehole

Reef 

Intersected 

 Depth 

(from collar) 

m

Weighted averages

Apparent Thickness m

3PGE+Au 

g/t

Estimated 5PGE+Au

g/t **

Copper 

%

Nickel

%

DT21

MR

1,098

1.04

4.15

4.4

0.12

0.21

DT22

MR

852

1.55 

4.43

4.7

0.12

0.21

DT24

MR

1,025

1.01

5.40

5.8

0.14

0.20

DT28 

MR

1,016

1.02

2.04

2.2

0.09

0.13

DT29 

MR pothole

1384

0.98

4.07

4.3

0.07

0.19

DT30

MR pothole *

1,291

1.13

0.00

0.00

0.00

0.00

DT31 

MR

1,210

1.02

2.04

2.2

0.09

0.13

DT33 

MR

1,344

1.08

2.65

2.8

0.09

0.13

DT35

MR motherhole *

1,252

0.99

10.43

11.1

0.21

0.35

DT36

MR *

705

1.46

4.48

4.8

0.10

0.13

DT38

MR *

1,095

1.19

2.67

3.11

0.13

0.18

DT40

MR

1,314

3.04

6.71

7.1

0.10

0.16

FF01

MR

1,597

2.81

2.72

2.9

0.08

0.13

DT30

UG2

1,602

0.65

7.85

9.2

na

na

DT33

UG2

1,700

0.66

7.74

9.1

na

na

DT36

UG2 pothole

1104

0.55

1.51

1.8

na

na

 

na not assayed/not applicable * deflections awaited ** factor applied to 3PGE+Au values to include ruthenium (Ru) and iridium (Ir) based on average of Ru and Ir analysis of four MR drill core and two UG2 drill core intersections selected.

Colin Bird, CEO of Jubilee and Tjate Project Manager said: "These new results continue to confirm the continuity at depth of the Merensky and UG2 reefs. The lower grades seen in some of the new borehole results correlate generally with a regional pothole within a lower grade area confined to the northwest of the farm Dsjate. The effect of this area will be considered in the options when delineating the resource and defining a resource estimate. The drilling programme for the second phase of the feasibility study was completed this month and the project is now rapidly advancing towards a definitive compliant mineral resource estimate." 

Note to Editors

The Tjate Project comprises three contiguous farms, totalling 5,143 hectares in the eastern Bushveld: Dsjate, Fernkloof and Quartz Hill. The farms are downdip of Impala Platinum's operating Marula platinum mine and of Anglo Platinum's developing Twickenham platinum mine. Jubilee is advancing the Project to feasibility study (FS).

SGS Lakefield Research Africa in Johannesburg carried out the analyses of the borehole core samples. This laboratory is SNAS TO169 accredited.

For further information please contact:

Colin Bird Nick Rome/Michael Kinirons

Jubilee Platinum plc Bishopsgate Communications Ltd 

Tel: +44 (0) 20 7584 2155 Tel +44 (0) 20 7562 3350

Gerard Kisbey-Green

Investec Bank plc

Tel +44 (0)20 7597 5000

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUWSWRKURUARR
Date   Source Headline
12th Jan 20167:00 amRNSJubilee Live Interactive Webcast
15th Dec 201510:30 amRNSFinal Agreement for Surface platinum project
8th Dec 20151:30 pmRNSCompletion of acquisition in DCM Platinum Project
2nd Dec 20153:30 pmRNSResults of Annual General Meeting
12th Nov 20152:00 pmRNSExercise of Warrants
11th Nov 20157:23 amRNSAudited results for the year and notice of AGM
9th Nov 20151:30 pmRNSJLP commence surface platinum project construction
20th Oct 20153:20 pmRNSExercise of Warrants
14th Oct 20152:45 pmRNSExercise of Warrants
9th Oct 201512:20 pmRNSJLP Receives Cash Consideration for Asset Disposal
1st Oct 20152:30 pmRNSJLP transfers ownership of Middelburg operations
23rd Sep 20154:32 pmRNSProject Update and Exercise of Warrants
16th Sep 20152:10 pmRNSJubilee sale of Middelburg Assets unconditional
18th Aug 201512:15 pmRNSExercise of Warrants
7th Aug 20152:50 pmRNSResult of General Meeting
5th Aug 201512:02 pmRNSFunding Secured for Surface platinum projects
4th Aug 201512:57 pmRNSStatement regarding share price movement
21st Jul 201510:15 amRNSUpdate Notice of GM and Invite to Live Webcast
16th Jul 20151:00 pmRNSJubilee sells non-platinum assets and Notice of GM
30th Jun 20158:00 amRNSJubilee increases interest in DCM Platinum project
16th Jun 201511:55 amRNSStatement re. Share Price Movement
26th May 201510:45 amRNSPlatinum surface processing projects gain momentum
22nd May 201511:30 amRNSChange of Adviser
6th May 20152:00 pmRNSDirector/PDMR Shareholding
17th Apr 20157:00 amRNSInvestor show and Director Dealing
27th Mar 20157:00 amRNSJubilee interims - LIVE webcast
25th Mar 20157:00 amRNSInterim Results
9th Mar 20157:45 amRNSQ4 2014 Operations and Financial Update
11th Feb 20158:03 amRNSJubilee secure funds for platinum surface projects
6th Feb 20152:45 pmRNSResult of General Meeting
21st Jan 20158:45 amRNSNotice of General Meeting
19th Jan 20157:00 amRNSJubilee Platinum wins Surface Processing Project
29th Dec 20147:00 amRNSResult of AGM
12th Dec 20147:00 amRNSChange of Adviser
10th Dec 201410:15 amRNSDirector Dealing
5th Dec 201410:19 amRNSLIVE Webcast
3rd Dec 20141:30 pmRNSAUDITED RESULTS FOR THE YEAR ENDED 30 JUNE 2014
18th Nov 20149:00 amRNSTrading Update, Issue of Equity
3rd Nov 201411:02 amRNSTrading Update, Issue of Equity
17th Oct 20143:30 pmRNSQ3 2014 operations & financial update - correction
17th Oct 20147:00 amRNSThird quarter 2014 operations and financial update
30th Sep 20144:30 pmRNSFunding Secured for Increased Power Exports
27th Aug 20148:30 amRNSChange of Adviser
11th Aug 20147:00 amRNSTjate submission and Middelburg update
21st Jul 20147:00 amRNSQuarterly Operations and Financial update
1st Jul 20149:01 amRNSTrading Update, Issue of Equity
27th Jun 201411:00 amRNSDirector Dealings
20th Jun 20147:00 amRNSMiddelburg Operations Update
9th Jun 20147:00 amRNSAccess Agreement Executed
16th May 201412:00 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.